Commercial electrical inspections

Want to know what construction projects are happening in your neighbourhood?
Use our free permit search tool

Inspections are needed for all wiring, electrical equipment, fixtures, and all associated systems related to electrical power sources. An inspection must be performed before any electrical work, or portion of work, is covered and at final inspection.

Make sure to get a permit before starting any new construction, demolition, addition or alteration to any part of an electrical system.

City inspectors review the following types of electrical installations:

  • new installations, alterations and additions of electrical services, wiring and equipment
  • fire alarm installations
  • pools, spas, saunas, hot tubs
  • transformers
  • underground wiring, ducts, raceways and cables
  • outdoor lighting and parking lot receptacles
  • temporary and special events services
  • emergency services reconnections
  • renewable energy systems
  • low voltage installations
    • CCTV
    • security alarm systems
    • communication cabling
  • new, additions/alterations to electrical components of mechanical systems:
    • heating systems
    • cooling systems
    • venting systems
    • cooking exhaust systems
    • spray painting systems
    • dust collection systems
  • new, additions/alterations to electrical components of fire protection systems:
    • sprinkler systems
    • standpipe systems
    • fire-pumps
    • fire stopping systems
    • chemical extinguishing systems
    • smoke control systems

This list does not include all types of construction or installation of equipment.

 

Mandatory inspection stages

Licensed electrical contractors/permit applicants must request an inspection at completion, and before covering, at each of the following stages when applicable to the project:

  • electrical service connections
  • underground
  • rough in
  • electrical final

Multiple progress inspections may be needed at each mandatory inspection stage based on the size, complexity and progress of the project.

Licensed contractors/permit applicants must request progress and final inspections as a condition of their licence. Failure to do so may result in:

Note: Progress inspections must be completed to the final stage before requesting building occupancy for the full project, or any part of the project, to support an interim or partial interim occupancy proposal.

For after-hours electrical emergencies, contact 311.

 

Additional electrical information

 

Questions?

Email: ppd-commbldg@winnipeg.ca
Phone: 204-986-5190

Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.