Site Accessibility Information Access Key 1 to Skip to Top Navigation Access Key 2 to Skip to the Three One One link Access Key 3 to Skip to City of Winnipeg Main Menu Access Key 4 to Skip to Left Navigation Menu Access Key 5 to Skip to Content area Access Key 6 to Skip to Right Sidebar content area Access Key 7 to Skip to Footer Links
City of Winnipeg
|  Link to the City of Winnipeg French websiteFrançais  |
COVID-19: City of Winnipeg response and latest updates on City facilities and services COVID-19 : Mesures prises par la Ville de Winnipeg et dernières nouvelles sur les installations et services municipaux
Public Works

Road Construction List

The roadway construction list provides project information in alphabetical order by street name. Project information is available by location in both map and list format. Please see the regional street lane closures page for information on current lane closures on major streets.

How to use the construction list

Click on the + beside the project name. A dropdown box will appear with these project details:

  1. type of infrastructure (street, alley, sidewalk, traffic signal, bridge project, pedestrian and cycling path),
  2. type of construction work (reconstruction, rehabilitation, mill & fill, thin bituminous overlay, improvements within the right-of-way)
  3. estimated to start,
  4. estimated to end,
  5. approximate percentage completed:
    • Pre-Construction – Construction phase has not started.
    • 0% – Construction contract is in place, but crews have not mobilized to the site.
    • 5% – Crews have mobilized to the site and construction has just begun.
    • 10% 90% – An approximation of progress; construction is well underway.
    • 95% – Main roadway construction is complete; travelling lanes are open/parking is restored/garbage pickup resumes (depending on the location); minor deficiencies and landscaping (seeding/sod) are likely outstanding.
    • COMPLETE – All construction components of the project are complete. Contractor may return for any follow up or warranty work in the next 1-2 years. Utilities (e.g. street lights) may or may not be complete. Construction may not be complete for other locations in the same contract.
  6. consultant information, and
  7. contractor information.

You can also view projects by street name using the Search box provided. Click "View Map" beside any project name to view in a map.

Note: As construction projects get underway this season the information about start dates and completion dates will be updated to reflect the actual project timeline.

A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z


City of Winnipeg - Public Works Capital Projects
(Last updated on March 5, 2021 @ 5:30 PM)
 
 
View All on Map


Aikins St - Enniskillen Av / McAdam Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 27/2020
Estimated to end Fall 2021
Approx. % completed 70
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Archibald St - Messier St / Doucet St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor To Be Determined
Additional information Click here
Archibald St - Plinguet St / Messier St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor To Be Determined
Additional information Click here
Archibald St - St Catherine St / Elizabeth Rd   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor To Be Determined
Additional information Click here
Archibald St - St Catherine St / Elizabeth Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor To Be Determined
Additional information Click here
Arden Av / St Michael Rd - St Marys Rd / Pulberry St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Ashwood Cv - Sweetwater By / End   View Map
Facility type Street
Type of work Asphalt Overlay
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Ashworth St S - Warde Av/Baisinger Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Mid May 2020
Estimated to end Fall 2020
Approx. % completed Planned
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Barratt Av - Clifton St/Spruce St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Beecher Av - Ferrier St/Swailes Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Booth Dr - Bruce Av / Portage Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 22/2020
Estimated to end Summer 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Braeside Pl - Point West Dr / End   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Broadway - Osborne St / Main St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Bruce Av - Ainslie St/Moray St   View Map
Facility type Sidewalk
Type of work New - Sidewalk Construction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Bruce Av - Ainslie St/Moray St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Bruce Av - Rita St/Ainslie St   View Map
Facility type Sidewalk
Type of work New - Sidewalk Construction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Chalmers Av - Watt St/Brazier St   View Map
Facility type Street
Type of work TBO
Estimated to start Mid May 2020
Estimated to end Summer 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Chudley St - Tyndall Av/Manitoba Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Colony St - Portage Av / St Mary Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Cormorant By - Edgewater Dr / Edgewater Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Corydon Av - Borebank St/Brock St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 19/2020
Estimated to end Summer 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Corydon Av - Cambridge St / Thurso St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Corydon Av - Cordova St/Lanark St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 19/2020
Estimated to end Summer 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Corydon Av - Thurso St / Stafford St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 11/2020
Estimated to end Summer 2021
Approx. % completed 70
Consultant Stantec Consulting Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2020 Construction Notice_Corydon Avenue.pdf
Corydon Av/Fleet Av - Oak St/Ash St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed Deferred
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2020 Construction Deferral Notice_Ash St_Oak St_Alley.pdf
Dakota St - Beliveau Rd / St Marys Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Dakota St - Bishop Grandin Bv / Beliveau Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Day St - Pandora St / Regent Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Des Meurons St - Carriere Av / Morier Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start August 20/2020
Estimated to end Summer 2021
Approx. % completed 50
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Document
2020 Construction Notice_Des Meurons Street.pdf
Des Meurons St - Goulet St / Marion St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Donald - Broadway / Gertrude Av (not including Bridge)   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor Bituminex Paving Ltd
Donald - Broadway / Gertrude Av (not including Bridge)   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor Bituminex Paving Ltd
Donald - St Mary / Broadway   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Dufferin Av - Sinclair St/Arlington St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Dunkirk Dr - Fermor Av / Norberry Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Dillon Consulting Limited
Contractor Bituminex Paving Ltd
Additional information Click here
Dunkirk Dr - Fermor Av / St Marys Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Dillon Consulting Limited
Contractor Bituminex Paving Ltd
Additional information Click here
Dunkirk Dr - Norberry Dr / St Marys Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Dillon Consulting Limited
Contractor Bituminex Paving Ltd
Additional information Click here
Durward St - Templeton Av/Tully Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Edmonton St - Ellice Av / Cumberland Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Ellice Av - Garry St / Donald St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Erin St - Notre Dame Ave / Sargent Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Additional information Click here
Erin St - Sargent Av / Wolever Ave   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Additional information Click here
Gallagher Av W - Keewatin St/Dee St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Goulet St - Braemar Av / Youville St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Graham Av - Hargrave St / Carlton St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Contractor J.C. Paving Ltd.
Grant Av - Montrose St / Lanark St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Grant Av - Montrose St / Queenston St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Grosvenor Av/Corydon Av - Oxford St/Waverley St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed Deferred
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2020 Construction Deferral Notice_ Waverley St_Oxford St_Alley.pdf
Hargrave St - York Av / Broadway   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor Bituminex Paving Ltd
Additional information Click here
Henderson Hw - McLeod Av / Leighton Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc
Higgins Av - Mordaunt St/Annabella St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Hobbs Cr - London St/Antrim Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Mid May 2020
Estimated to end Summer 2021
Approx. % completed 70
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Inkster Bv - McKenzie St / Arlington St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
John Forsyth Rd - Baisinger Dr/Dakota St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Johnson Av W - Levis St / Henderson Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Additional information Click here
Jubilee Av - Osborne St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Dillon Consulting Limited
Additional information Click here
Keewatin St - Adsum Dr / Inkster Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Keewatin St - Selkirk Av / Logan Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
King Edward St - Hyde Av / Logan Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
King Edward St - Hyde Av / Logan Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Kingston Rw - Edinburgh St / Rosewarne Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Kingston Rw - Rosewarne Av / St Marys Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Kirkfield St - Portage Av / McBey Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 1/2020
Estimated to end Summer 2021
Approx. % completed 90
Consultant WSP Canada Inc
Contractor J.C. Paving Ltd.
Document
2020 Construction Notice_Kirkfield Street.pdf
Lagimodiere Bv - Fermor Av / Cottonwood Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Lagimodiere Bv - Regent Av W / Almey Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Mid May 2020
Estimated to end Summer 2021
Approx. % completed 30
Lagimodiere Bv - Springfield Rd / 200m S of Headmaster Rw   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Lagimodiere Bv - Springfield Rd / 200m S of Headmaster Rw   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Lagimodiere Bv SB - Reenders Dr / Regent Av W   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2021
Estimated to end Fall 2021
Approx. % completed Planned
Contractor Borland Construction
Lakeglen Dr - Lake Lindero Rd/Lake Lindero Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Mid May 2020
Estimated to end Summer 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Laurel By - Diplomat Dr/Hillhouse Rd   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Laurel By - Hillhouse Rd / Diplomat Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Leila Av - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Leila Ave - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Leila Ave - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Lindenwood Dr W - Brentcliffe Dr/Forestgate Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 50
Lindenwood Dr W - Forestgate Av/Lindmere Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 7/2020
Estimated to end Summer 2021
Approx. % completed 50
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Document
2020 Construction Notice_Lindenwood Drive West.pdf
Logan Av - Disraeli Fwy / Main St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Lyndale Dr - Claremont Av/Birchdale Av   View Map
Facility type Street
Type of work River Bank Restoration
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant TREK Geotechnical Inc.
Marwood Cr - Edgemont Dr / Edgemont Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
McGregor St - Church Av / Mountain Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
McGregor St - Seven Oaks Av / McAdam Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
McPhillips St - Machray Av / Mountain Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Meredith By - Templeton Av / Templeton Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Michelle Jean Park - Lisgar Av / Hallet St   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Mountain Ave - Arlington St / McPhillips St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Munroe Av - Raleigh St / Watt St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Additional information Click here
Munroe Av - Watt St / Henderson Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Additional information Click here
Myles Robinson Wy - Desjardins Dr/Island Lakes Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Nairn Av - Stadacona St / Watt St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Northwest Hydro Corridor Pathway - Leila Av / Church Av   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Oakhurst Cr - Monty Hall Dr/Monty Hall Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Oakleaf Dr - Avalon Rd/Riel Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Osborne St - Hethrington Av/Rathgar Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Pandora Ave E - Day St / Wayoata St   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Pandora Ave E - Day St / Wayoata St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Park Lane Av - Hekla Av / Park Lane Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Pembina Hw - De Leglise Av / Ducharme Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Additional information Click here
Pembina Hw - Ducharme Av / De Leglise Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Additional information Click here
Pembina Hw - McGillivray Bv / Chevrier Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Dillon Consulting Limited
Additional information Click here
Pembina Hw - McGillivray Bv / Chevrier Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Dillon Consulting Limited
Additional information Click here
Pincarrow Pt - Scurfield Bv/Eglinton Cr   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Pioneer Av - Westbrook St / Main St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Portage Av - David St / Knox St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Portage Av - Main St / Memorial Bv   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end To Be Determined
Approx. % completed Planned
Portage Av - Main St / Memorial Bv   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end To Be Determined
Approx. % completed Planned
Portage Av - St Charles St / David St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Portage Av - Woodlawn St / Century St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Portage Av -St James St / Moorgate St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Portage Ave WB - Knox St / St Charles St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Summer 2021
Estimated to end Summer 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Redwood Av - Salter St / Main St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Regent Av W - Plessis Rd / Rougeau Av   View Map
Facility type Bridge
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Contractor Borland Construction
Regent Av W - Plessis Rd / Rougeau Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Contractor Borland Construction
Regis Dr - Charing Cross Cr / Paddington Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
River Av - Osborne St / Wellington Cr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Roblin Blvd - Berkley St / Dieppe Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Roblin Blvd - Berkley St / Dieppe Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Roblin Blvd - Dieppe St / PTH101   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 8/2020
Estimated to end Fall 2021
Approx. % completed 80
Consultant Stantec Consulting Ltd
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2020 Construction Notice_Roblin Boulevard.pdf
Roblin Blvd - Dieppe St / PTH101   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 8/2020
Estimated to end Summer 2021
Approx. % completed 80
Consultant Stantec Consulting Ltd
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2020 Construction Notice_Roblin Boulevard.pdf
Roblin Blvd - Dieppe St / PTH101   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 8/2020
Estimated to end Fall 2021
Approx. % completed 80
Consultant Stantec Consulting Ltd
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2020 Construction Notice_Roblin Boulevard.pdf
Ross Av - Paulin St / Ellen St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Sage Creek Path - De La Seigneurie Bv / Lagimodiere Bv   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Salter St - Cathedral Av / Slaw Rebchuk Bridge   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Contractor Darco Enterprises
Additional information Click here
Salter St - Jefferson Av / Inkster Bv   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sargent Av - Edmonton St / Furby St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sargent Av/Ellice Av - Ingersoll St/Sherburn St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start September 28/2020
Estimated to end Summer 2021
Approx. % completed 5
Consultant KGS Group Limited
Contractor Asphaltec Paving
Document
2020 Construction Notice_Sherburn Street_Ingersoll Street_Alley.pdf
Sargent Ave - Empress St / St James St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Scurfield Park   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Selkirk Av - Main St / Salter St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Selkirk Ave - Arlington St / McPhillips St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Document
2020 Construction Notice - Selkirk Ave 1.pdf
Sherburn St - Ellice Av/St Matthews Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Smith - Notre Dame / York Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Smith St - Notre Dame / Graham Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Southwalk By - Charing Cross Cr / Charing Cross Cr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
St Annes Rd - St Marys Rd / Fermor Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
St Mary Av - Hargrave St / Carlton St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
St Mary Av - Memorial Bv / Portage Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
St Mary Av - Memorial Bv / Portage Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
St Marys Av - Garry St / Smith St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
St Marys Av - Main St / Garry St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
St Marys Av - Smith St / Hargrave St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Stafford St - Corydon Ave/Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Stradbrook Ave - Wellington Cr / Osborne St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sturgeon Creek Path - Saskatchewan Av / Silver Av   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Sturgeon Rd - Ness Av / Hallonquist Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sturgeon Rd - Ness Av / Hallonquist Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sweetwater By - Edgewater Dr / Edgewater Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Taylor Ave - Harrow St/Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Taylor Ave - Wilton St / Harrow St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Taylor Ave - Wilton St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Taylor Ave - Wilton St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2020
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Taylor Ave - Wilton St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Thornhill By - Rochester Av/Rochester Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 5
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2020 Construction Notice_Thornhill Bay.pdf
Transcona Bv - In close proximity to retention pond   View Map
Facility type Sidewalk
Type of work Slope Restoration
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Trowbridge By - Malmsbury Av/Knotsberry By   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Document
2020 Construction Notice_Trowbridge Bay.pdf
Ulster St - Dalhousie Dr/Mapleridge Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
University Cr - Chancellor Matheson Rd / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
University Cr - Pembina Hw / Sifton Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
University Cr - Sifton Rd / Chancellor Matheson Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Wall St - St Matthews Av / Wellington Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Contractor J.C. Paving Ltd.
Additional information Click here
Wall St - Wellington Av / Notre Dame Ave   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Contractor J.C. Paving Ltd.
Additional information Click here
Watercress Rd - Cormorant By / Edgewater Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant AECOM Canada Ltd
Wellington Cr - River Av / Stradbrook Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Wellington Crescent Riverbank, Path and Roadway Project   View Map
Facility type Street
Type of work River Bank Restoration
Estimated to start Spring 2021
Estimated to end Fall 2021
Consultant KGS Group
William Av - Arlington St / McPhillips St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
William Stephenson Wy - Main St / Westbrook St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Wynyard By - Southwell Rd/Manthorne Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed 0
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.

Disclaimer and Indemnity:

The information on this web site is provided as a public service and should be used for general information purposes only. Although the information provided represents the planned capital work on city infrastructure for the current year, the City of Winnipeg cannot guarantee that it is accurate or current at all times. Although it is rare that projects are not finished within the stated timeframe, the City cannot guarantee that the work will be completed in all cases.

The information on this web site is subject to change without notice. Winnipeg.ca AND ITS AFFILIATES ARE NOT RESPONSIBLE IN ANY MANNER FOR DIRECT, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES HOWSOEVER CAUSED RESULTING FROM THE USE, MISUSE OR MISINTERPRETATION OF ANY CONTENT, PRODUCTS OR SERVICES PROVIDED BY THIS WEB SITE.

By using this site, you agree to indemnify, defend and hold harmless City of Winnipeg and its officials, officers, employees and authorized representatives from and against any liability, loss injury (including injuries resulting in death), demand, action, cost, expense, or claim of any kind, including but not limited to lawyer's fees, relating in any way to your use of the contents, or services provided by this web site.


Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.

Ces renseignements sont-ils utiles?

Comment pourrait-on améliorer cette page Web?

Les renseignements recueillis serviront à l’amélioration de notre site Web. Prière de ne pas se servir de ce formulaire pour soumettre une demande de service ou de renseignements, car la demande ne sera pas transmise au service en question. Pour soumettre une demande de service ou de renseignements, veuillez communiquer avec le 311.

Le présent formulaire ne vise pas à recueillir des renseignements personnels. Cependant, les renseignements personnels que vous choisissez d’inclure dans vos commentaires sont recueillis par la Ville de Winnipeg en conformité avec l’alinéa 36(1)b) de la Loi sur l’accès à l’information et la protection de la vie privée dans le but d’améliorer son site Web et ne seront ni utilisés ni divulgués pour d’autres raisons, sauf dans les cas où cela est autorisé par la loi. Communiquez avec l’agent de l’accès à l’information et de la protection de la vie privée de la Ville par courrier au Bureau du greffier, immeuble Susan-A.-Thompson, 510, rue Main, Winnipeg (Manitoba) R3B 1B9, ou par téléphone au 311 si vous avez des questions sur la collecte de ces renseignements.