Site Accessibility Information Access Key 1 to Skip to Top Navigation Access Key 2 to Skip to the Three One One link Access Key 3 to Skip to City of Winnipeg Main Menu Access Key 4 to Skip to Left Navigation Menu Access Key 5 to Skip to Content area Access Key 6 to Skip to Right Sidebar content area Access Key 7 to Skip to Footer Links
City of Winnipeg
|  Link to the City of Winnipeg French websiteFrançais  |
COVID-19: City of Winnipeg response and latest updates on City facilities and services COVID-19 : Mesures prises par la Ville de Winnipeg et dernières nouvelles sur les installations et services municipaux
Public Works

Road Construction List

The roadway construction list provides project information in alphabetical order by street name. Project information is available by location in both map and list format. Please see the regional street lane closures page for information on current lane closures on major streets.

How to use the construction list

Click on the + beside the project name. A dropdown box will appear with these project details:

  1. type of infrastructure (street, alley, sidewalk, traffic signal, bridge project, pedestrian and cycling path),
  2. type of construction work (reconstruction, rehabilitation, mill & fill, thin bituminous overlay, improvements within the right-of-way)
  3. estimated to start,
  4. estimated to end,
  5. approximate percentage completed:
    • Pre-Construction – Construction phase has not started.
    • 0% – Construction contract is in place, but crews have not mobilized to the site.
    • 5% – Crews have mobilized to the site and construction has just begun.
    • 10% 90% – An approximation of progress; construction is well underway.
    • 95% – Main roadway construction is complete; travelling lanes are open/parking is restored/garbage pickup resumes (depending on the location); minor deficiencies and landscaping (seeding/sod) are likely outstanding.
    • COMPLETE – All construction components of the project are complete. Contractor may return for any follow up or warranty work in the next 1-2 years. Utilities (e.g. street lights) may or may not be complete. Construction may not be complete for other locations in the same contract.
  6. consultant information, and
  7. contractor information.

You can also view projects by street name using the Search box provided. Click "View Map" beside any project name to view in a map.

Note: As construction projects get underway this season the information about start dates and completion dates will be updated to reflect the actual project timeline.

A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z


City of Winnipeg - Public Works Capital Projects
(Last updated on October 24, 2021 @ 8:00 PM)
 
 
View All on Map


Aikins St - Enniskillen Av / McAdam Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 27,2020
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Alexander Av - Keewatin St/Dee St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Alfred Av - McPhillips St/Fife St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Allegheny Dr - Dalhousie Dr / Ulster St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Appelmans By - Brixford Cr/Brixford Cr   View Map
Facility type Street
Type of work TBO
Estimated to start September 20, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Appelmans Bay.pdf
Arbuthnot St - Lorette Av / South Limit   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Archibald St - Messier St / Doucet St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor To Be Determined
Additional information Click here
Archibald St - Plinguet St / Messier St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Contractor To Be Determined
Additional information Click here
Archibald St - St Catherine St / Elizabeth Rd   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start May 10, 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Additional information Click here
Document
2021 Construction Notice_Archibald.pdf
Archibald St - St Catherine St / Elizabeth Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 10, 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Additional information Click here
Document
2021 Construction Notice_Archibald.pdf
Arden Av / St Michael Rd - St Marys Rd / Pulberry St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice _Alley bounded by Pulberry to St. Marys.pdf
Arlington Street Overpass   View Map
Facility type Bridge
Type of work Maintenance
Estimated to start August 9, 2021
Estimated to end August 22, 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Streets Maintenance Division
Ashwood Cv - Sweetwater By / End   View Map
Facility type Street
Type of work Asphalt Overlay
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Construction Notice_Ashworth St.pdf
Ashworth St S - Warde Av/Baisinger Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Mid May 2020
Estimated to end Fall 2020
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Atlantic Av - McGregor St / Salter St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 26, 2021
Estimated to end Late July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Construction Notice_ Atlantic Ave.pdf
Avonherst St / Stafford St - Harvard Av / Yale Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Late May 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021_Pre-Construction Notice_Harvard Ave Staford St Avonherst St and Yale Ave_Alley.pdf
Balmoral St - Granite Wy / Young St   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start Late June 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant Urban Systems
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_Wolseley Bike Project.pdf
Banning St / Lipton St - Yarwood Av / Wellington Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start May 10, 2021
Estimated to end Late June 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2021 Construction Notice_Lipton St_Banning St Alley.pdf
Barratt Av - Clifton St/Spruce St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start July 26, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021 Construction Notice_Barratt Ave.pdf
Bayview Dr (W leg) - Bayview Pl / St Martin Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Beaconsfield St - Lusted Av / Lisgar Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start August 4, 2021
Estimated to end Early September 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Construction Notice_Beaconsfield St.pdf
Beaudry By - Shorehill Dr / Shorehill Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 16, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Beaudry Bay.pdf
Beecher Av - Ferrier St/Swailes Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start May 17, 2021
Estimated to end Early June, 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021 Construction Notice_Beecher Ave_Sidewalks.pdf
Birchdale Av - Highfield St / Lyndale Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Booth Dr - Bruce Av / Portage Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 22,2020
Estimated to end Summer 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Bowman Av - Brazier St / Roch St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 60
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Bowman Av - Henderson Hw / Brazier St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 80
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Braeside Pl - Point West Dr / End   View Map
Facility type Street
Type of work TBO
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Document
2021_Construction Notice_Braeside Pl.pdf
Bramton St - Woodydell Av/Brixford Cr   View Map
Facility type Street
Type of work TBO
Estimated to start September 20, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Bramton Street.pdf
Brereton Rd - Vermillion Rd/Clearwater Rd   View Map
Facility type Street
Type of work TBO
Estimated to start September 13, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Brereton Road.pdf
Broadway - Osborne St / Main St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2023
Estimated to end Fall 2023
Approx. % completed Planned
Consultant AECOM Canada Ltd
Additional information Click here
Bruce Av - Ainslie St/Moray St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start June 28, 2021
Estimated to end Early July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021_Construction Notice_Bruce Ave.pdf
Bruce Av - Rita St/Ainslie St   View Map
Facility type Sidewalk
Type of work New - Sidewalk Construction
Estimated to start June 28, 2021
Estimated to end Early July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021_Construction Notice_Bruce Ave.pdf
Byrd Av - Westwood Dr / Rouge Rd   View Map
Facility type Street
Type of work TBO
Estimated to start September 7, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Byrd Ave.pdf
Carlotta Cr - Roblin Bv / Buckle Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 7, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Carlotta Cres.pdf
Carter Av - Guelph St/Wilton St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Cecil St - Alexander Av / Notre Dame Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 5, 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Cecil St.pdf
Chalmers Av - Watt St/Brazier St   View Map
Facility type Street
Type of work TBO
Estimated to start Mid May 2020
Estimated to end Summer 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Chief Peguis Tl - Henderson Hw (250m west of)/Main St   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Chief Peguis Trail West - Main St/Brookside Bv   View Map
Facility type Street
Type of work Study
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Additional information Click here
Chudley St - Tyndall Av/Manitoba Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start August 9, 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021_Construction Notice_Chudley St.pdf
Colony St - Portage Av / St Mary Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Cormorant By - Edgewater Dr / Edgewater Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice_Comorant By.pdf
Corydon Av - Borebank St/Brock St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 19,2020
Estimated to end Summer 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Corydon Av - Cambridge St / Thurso St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Stantec Consulting Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021 Pre-Construction Notice_Corydon Ave.pdf
Corydon Av - Cordova St/Lanark St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 19,2020
Estimated to end Summer 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Corydon Av - Thurso St / Stafford St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Stantec Consulting Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021 Pre-Construction Notice_Corydon Ave.pdf
Corydon Av/Fleet Av - Oak St/Ash St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start May 17,2021
Estimated to end Early July 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Completion Notice_Ash St_Oak St.pdf
Dakota St - Beliveau Rd / St Marys Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Dakota St - Bishop Grandin Bv / Beliveau Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Daman St - Emerson Av/Knowles Av   View Map
Facility type Street
Type of work TBO
Estimated to start September 20, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Document
2021 Construction Notice_Daman St.pdf
Day St - Pandora St / Regent Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 7, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Nelson River Construction
Additional information Click here
Document
2021_Construction Notice - Day St.pdf
Des Meurons St - Carriere Av / Morier Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 10, 2021
Estimated to end Late May 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Des Meurons St.pdf
Des Meurons St - Goulet St / Marion St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Desharnais St - Adsum Dr/Margate Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Dominion St - Armoury Av / St Mathews Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 12, 2021
Estimated to end Mid August 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Dominion St from Amoury Ave to St. Matthews Ave.pdf
Dominion St - Sargent Av / Ellice Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 12, 2021
Estimated to end Mid August 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Dominion St from Sargent Ave to Ellice Ave.pdf
Donald - Broadway / Gertrude Av (not including Bridge)   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Additional information Click here
Donald - Broadway / Gertrude Av (not including Bridge)   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Late April 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021 Construction Notice_Donald St.pdf
Donald - St Mary / Broadway   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Late April 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021 Construction Notice_Donald St.pdf
Doncaster St - Corydon Av / Blanche Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 12, 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Doncaster St.pdf
Dorchester Av / McMillan Av - Wilton St / Rockwood St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Late May 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021_Pre-Construction Notice_Rockwood St Dorchester Ave McMillan Ave and Wilton St_Alley.pdf
Dowker Av - South Dr / Crowson By   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 26, 2021
Estimated to end Mid September 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021 Construction Notice_Dowker Ave.pdf
Dufferin Av - Sinclair St/Arlington St   View Map
Facility type Street
Type of work TBO
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Dufferin Ave.pdf
Dufferin Av / Jarvis Av - Salter St / Powers St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2021 Construction Completion Notice_Dufferin Ave_Jarvis Ave.pdf
Dundoon St - Glenway Av/Knowles Av   View Map
Facility type Street
Type of work TBO
Estimated to start September 20, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Document
2021 Construction Notice_Dundoon St.pdf
Dunkirk Dr - Fermor Av / Norberry Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant Dillon Consulting Limited
Contractor Bituminex Paving Ltd
Additional information Click here
Dunkirk Dr - Fermor Av / St Marys Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Bituminex Paving Ltd
Additional information Click here
Dunkirk Dr - Norberry Dr / St Marys Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant Dillon Consulting Limited
Contractor Bituminex Paving Ltd
Additional information Click here
Durward St - Templeton Av/Tully Rd   View Map
Facility type Street
Type of work TBO
Estimated to start June 1,2021
Estimated to end Late June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Duward St.pdf
Edderton Av/Byng Pl - Rockman St/Derek St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Edkar Cr - McIvor Av / Pentland St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 25, 2021
Estimated to end Late June 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Edkar Cres.pdf
Edmonton St - Ellice Av / Cumberland Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Ellice Av - Garry St / Donald St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_Ellice Ave_Sidewalk.pdf
Erin St - Notre Dame Ave / Sargent Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Additional information Click here
Erin St - Sargent Av / Wolever Ave   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Additional information Click here
Fulton St - Lanyon Dr/Ashworth St S   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Fulton St.pdf
Galaxy Wy - Pipeline Rd/Stardust Cr   View Map
Facility type Street
Type of work TBO
Estimated to start October 6, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Document
2021 Construction Notice_Galaxy Wy.pdf
Gallagher Av W - Keewatin St/Dee St   View Map
Facility type Street
Type of work TBO
Estimated to start May 27, 2021
Estimated to end Late June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Gallagher Ave West.pdf
Garden Park Dr - Beecher Av/Templeton Av   View Map
Facility type Street
Type of work TBO
Estimated to start October 6, 2021
Estimated to end Fall 2021
Approx. % completed 40
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Document
2021 Construction Notice_Garden Park Dr.pdf
Garfield St N / Dominion St - Wellington Av / Sargent Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2021 Construction Notice_Dominion St_Garfield St.pdf
Gateway Rd - Johnson Av E/Riverton Av   View Map
Facility type Street
Type of work TBO
Estimated to start September 20, 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Document
2021 Construction Notice_Gateway Rd.pdf
Glenacres Cr - Millstream Wy/Millstream Wy   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Goulet St - Braemar Av / Youville St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Graham Av - Hargrave St / Carlton St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Contractor J.C. Paving Ltd.
Grandcrest St - Forest Park Dr / Hartford Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Granite Wy - Osborne St N / Balmoral St   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start Late June 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant Urban Systems
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_Wolseley Bike Project.pdf
Grant Av - 150m East of Kenaston / Montrose St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Complete
Grassington By - Whitley Dr/Whitley Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 20, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Grassington Bay.pdf
Greenwich By - Crestwood Cr/Crestwood Cr   View Map
Facility type Street
Type of work TBO
Estimated to start August 30, 2021
Estimated to end Late September 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Greenwich By.pdf
Grosvenor Av - Ash St / Cordova St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Late May 2021
Estimated to end Fall 2021
Approx. % completed 80
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021_Pre-Construction Notice_Grosvenor Ave_Ash to Lindsay.pdf
Grosvenor Av - Cordova St / Lindsay St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Late May 2021
Estimated to end Fall 2021
Approx. % completed 80
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021_Pre-Construction Notice_Grosvenor Ave_Ash to Lindsay.pdf
Grosvenor Av - Harrow St / Stafford St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Late May 2021
Estimated to end Fall 2021
Approx. % completed 80
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021_Pre-Construction Notice_Grosvenor Ave_Harrow St to Stafford St.pdf
Grosvenor Av/Corydon Av - Oxford St/Waverley St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start May 10, 2021
Estimated to end Summer 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
Completion Notice_19-RL-01 Waverley St_Oxford St_2021.pdf
Hargrave St - York Av / Broadway   View Map
Facility type Street
Type of work Reconstruction
Estimated to start August 3, 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021_Construction Notice_Hargrave St.pdf
Henderson Hw - City Limit / North of Gilmore Av   View Map
Facility type Street
Type of work Study
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Henderson Hw - McLeod Av / Leighton Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Bayview Construction Ltd
Additional information Click here
Document
2021 Pre-Construction Notice_Henderson.pdf
Higgins Av - Mordaunt St/Annabella St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start June 14, 2021
Estimated to end Early July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021_Construction Notice_Higgins Avenue.pdf
Highfield St / Coniston - Crawford Av / Tache Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Hirt Cr - Ashworth St S / Southglen Bv   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Hirt Cres.pdf
Hobbs Cr - London St/Antrim Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Mid May 2020
Estimated to end Summer 2021
Approx. % completed 70
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Home St - Westminster Av/Wolseley Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Inkster Bv - McKenzie St / Arlington St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Jeffrey Cr - Tu Pelo Av/Gateway Rd   View Map
Facility type Street
Type of work TBO
Estimated to start September 20, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Document
2021 Construction Notive_ Jeffrey Cr.pdf
Jessie Av - Hugo St N / Cockburn St N   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
John Forsyth Rd - Aldgate Rd / Baisinger Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
John Forsyth Rd - Baisinger Dr/Dakota St   View Map
Facility type Street
Type of work TBO
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_John Forsythe Rd.pdf
Johnson Av W - Levis St / Henderson Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Additional information Click here
Jolliett Cr - Rouge Rd / Sansome Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start August 30, 2021
Estimated to end Fall 2021
Approx. % completed 60
Consultant WSP Canada Inc
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Jolliett Cres_Revised Start Date.pdf
Jubilee Av - Osborne St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Dillon Consulting Limited
Additional information Click here
Keats Wy - Bedson St/Bedson St   View Map
Facility type Street
Type of work TBO
Estimated to start September 15, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Keats Way.pdf
Keewatin St - Adsum Dr / Inkster Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Keewatin St - Selkirk Av / Logan Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 80
Consultant WSP Canada Inc.
Contractor J.C. Paving Ltd.
Additional information Click here
Document
2021_Pre-Construction Notice_Keewatin St.pdf
Kenaston - Taylor Ave / Ness Ave   View Map
Facility type Street
Type of work Study
Estimated to start Study
Estimated to end Study
Approx. % completed Study
Additional information Click here
Kerwell Pl - Beckinsale By/Novavista Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed 5
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Kerwell Pl.pdf
King Edward St - Hyde Av / Logan Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant WSP Canada Inc.
Contractor J.C. Paving Ltd.
Additional information Click here
Document
2021_Pre-Construction Notice_King Edward St.pdf
King Edward St - Hyde Av / Logan Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant WSP Canada Inc.
Contractor J.C. Paving Ltd.
Additional information Click here
Document
2021_Pre-Construction Notice_King Edward St.pdf
Kingsbury Av - McPhillips St / Petunia St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 26, 2021
Estimated to end Mid August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Construction Notice_ Kingsbury Ave.pdf
Kingsbury Av - Sinclair St / Petunia St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 26, 2021
Estimated to end Mid August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Construction Notice_ Kingsbury Ave.pdf
Kingston Rw - Edinburgh St / Rosewarne Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice_Kingston Row.pdf
Kingston Rw - Rosewarne Av / St Marys Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice_Kingston Row.pdf
Kirkdale St / Highfield St - Claremont Av / Ferndale Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start June 14, 2021
Estimated to end Mid August 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2021_Construction Completion Notice _Ferndale Ave_Claremont Ave_Alley.pdf
Kirkfield St - Portage Av / McBey Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 1,2020
Estimated to end Summer 2021
Approx. % completed 90
Consultant WSP Canada Inc
Contractor J.C. Paving Ltd.
Document
2020 Construction Notice_Kirkfield Street.pdf
Lagimodiere Bv - Fermor Av / Cottonwood Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Lagimodiere Bv - Regent Av W / Almey Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Mid May 2020
Estimated to end Summer 2021
Approx. % completed 30
Additional information Click here
Lagimodiere Bv - Springfield Rd / 200m S of Headmaster Rw   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start June 7, 2021
Estimated to end Late September 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2021_Construction Notice_Lagimidiere.pdf
Lagimodiere Bv - Springfield Rd / 200m S of Headmaster Rw   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start June 7, 2021
Estimated to end Late September 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2021_Construction Notice_Lagimidiere.pdf
Lagimodiere Bv SB - Reenders Dr / Regent Av W   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Summer 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Borland Construction
Additional information Click here
Lakeglen Dr - Lake Lindero Rd/Lake Lindero Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Mid May 2020
Estimated to end Summer 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Larsen Av - Brazier St / Roch St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Laurel By - Diplomat Dr/Hillhouse Rd   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start May 17, 2021
Estimated to end Early June, 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021 Construction Notice_Laurel Bay_Sidewalks.pdf
Laurel By - Hillhouse Rd / Diplomat Dr   View Map
Facility type Street
Type of work TBO
Estimated to start June 7, 2021
Estimated to end Late July 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Laurel Bay.pdf
Laval Dr - Pasadena Av/Silverstone Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 10
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Laval Dr.pdf
Leacock Av - Westwood Dr / Carroll Rd   View Map
Facility type Street
Type of work TBO
Estimated to start September 7, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Leacock Ave.pdf
Leamington Gt - Burlington Wy/Columbia Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 30, 2021
Estimated to end Fall 2021
Approx. % completed 30
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Leamington Gate.pdf
Leeward Pl - Myles Robinson Wy/Desjardins Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 13, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Leeward Place.pdf
Leger Cr - Island Shore Bv/Island Shore Bv   View Map
Facility type Street
Type of work TBO
Estimated to start September 16, 2021
Estimated to end Fall 2021
Approx. % completed 40
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Leger Cres.pdf
Leila Av - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Leila Ave - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Leila Ave - McPhillips St / McGregor St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Leola St - Harold Av E / Kildare Av E   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Leola St - Kildare Av E / Regent Av E   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Leola St - Whittier Av E/Rosseau Av E   View Map
Facility type Sidewalk
Type of work New - Sidewalk Construction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Developer Installed
Lindenwood Dr W - Brentcliffe Dr/Forestgate Av   View Map
Facility type Street
Type of work TBO
Estimated to start September 16, 2021
Estimated to end Fall 2021
Approx. % completed 20
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Lindenwood Drive W.pdf
Lindenwood Dr W - Forestgate Av/Lindmere Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 7, 2020
Estimated to end Summer 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2020 Construction Notice_Lindenwood Drive West.pdf
Logan Av - Disraeli Fwy / Main St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Lyndale Dr - Claremont Av/Birchdale Av   View Map
Facility type Street
Type of work River Bank Restoration
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant TREK Geotechnical Inc.
Machray Av - Arlington St / Sinclair St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Late June 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Construction Notice_Machray Ave.pdf
Madeline St - McMeans Av W / Harold Av W   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Wintec Building Services Inc.
Main St - York Av/Main Street Bridge   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Martell Cr - Maevista Pl/Blechner Dr   View Map
Facility type Street
Type of work TBO
Estimated to start October 6, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Document
2021 Construction Notice_Martell Cr.pdf
Marwood Cr - Edgemont Dr / Edgemont Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice_Marwood Cr.pdf
Marygrove Cr - Columbia Dr/Columbia Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Marygrove Cres.pdf
McGill Av - McMasters Rd/Silverstone Av   View Map
Facility type Street
Type of work TBO
Estimated to start October 6, 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_McGill Av.pdf
McGregor St - Church Av / Mountain Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
McGregor St - Seven Oaks Av / McAdam Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
McPhillips St - Machray Av / Mountain Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Meadowbank Rd - Marygrove Cr/Columbia Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed 10
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Meadowbank Rd .pdf
Meredith By - Templeton Av / Templeton Av   View Map
Facility type Street
Type of work TBO
Estimated to start May 21, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Meredith Bay.pdf
Michelle Jean Park - Lisgar Av / Hallet St   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start August 2, 2021
Estimated to end Early October 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice - North Winnpeg Parkway.pdf
Mitchelson Wy - Bonner Av/Ragsdill Rd   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Montcalm Cr - Hartford Av/Vanier Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Moray St - Ness Av/Portage Av   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Morning Glory Cr - Royal Mint Dr/Royal Mint Dr   View Map
Facility type Street
Type of work TBO
Estimated to start August 30, 2021
Estimated to end Late September 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Morning Glory Cr.pdf
Mountain Ave - Arlington St / McPhillips St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Muir Rd - Plymouth St / Church Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 26, 2021
Estimated to end Early July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor J.C. Paving Ltd.
Document
2021_Construction Notice_Muir Rd.pdf
Munroe Av - Raleigh St / Watt St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Additional information Click here
Munroe Av - Watt St / Henderson Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start May 3,2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant WSP Canada Inc.
Contractor Bayview Construction Ltd
Additional information Click here
Document
2021 Construction Notice_Munroe Ave.pdf
Myles Robinson Wy - Desjardins Dr/Island Lakes Dr   View Map
Facility type Street
Type of work TBO
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Document
2021_Construction Notice_Myles Robinson Way.pdf
Nairn Av - Stadacona St / Watt St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Nairn Av Overpass   View Map
Facility type Bridge
Type of work Maintenance
Estimated to start Early June 2021
Estimated to end Late September 2021
Approx. % completed Planned
Nathaniel St - Fleet Av / Dudley Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Late May 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021_Pre-Construction Notice_Nathaniel Street Rehab Fleet Ave to Dudley Ave.pdf
Nathaniel St - Grant Av / Lorette Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Late May 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021_Pre-Construction Notice_Nathaniel Street Rehab Grant Ave to Lorette Ave.pdf
Northwest Hydro Corridor Pathway - Leila Av / Church Av   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Oakhurst Cr - Monty Hall Dr/Monty Hall Dr   View Map
Facility type Street
Type of work TBO
Estimated to start May 20, 2021
Estimated to end Early July 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Oakhurst Cres.pdf
Oakleaf Dr - Avalon Rd/Riel Av   View Map
Facility type Street
Type of work TBO
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Document
2021_Construction Notice_Oakleaf Dr.pdf
Osborne St - Hethrington Av/Rathgar Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start August 16, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021 Construction Notice_Osborne Street sidewalk.pdf
Pandora Av W - Plessis Rd/Robson St   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 5
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Pandora Ave E - Day St / Wayoata St   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start June 7, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Additional information Click here
Document
2021_Construction Notice - Pandora Ave.pdf
Pandora Ave E - Day St / Wayoata St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start June 7, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Additional information Click here
Document
2021_Construction Notice - Pandora Ave.pdf
Park Lane Av - Hekla Av / Park Lane Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 17, 2021
Estimated to end Early July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor J.C. Paving Ltd.
Document
2021_Construction Notice_Park Lane Ave.pdf
Parkview St - Silver Av/Portage Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Pauline Boutal Cr - De La Seigneurie Bv/De La Seigneurie Bv   View Map
Facility type Street
Type of work TBO
Estimated to start September 16, 2021
Estimated to end Fall 2021
Approx. % completed 40
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Pauline Boutal Cres.pdf
Pembina Hw - De Leglise Av / Ducharme Av   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start August 3, 2021
Estimated to end Fall 2021
Approx. % completed 80
Consultant WSP Canada Inc.
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2021 Construction Notice_Pembina_Revised.pdf
Pembina Hw - Ducharme Av / De Leglise Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start August 3, 2021
Estimated to end Fall 2021
Approx. % completed 80
Consultant WSP Canada Inc.
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2021 Construction Notice_Pembina_Revised.pdf
Pembina Hw - McGillivray Bv / Chevrier Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Dillon Consulting Limited
Additional information Click here
Pembina Hw - McGillivray Bv / Chevrier Bv   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Dillon Consulting Limited
Additional information Click here
Pembina Hw SB to Bishop Grandin Bv EB   View Map
Facility type Bridge
Type of work Slope Restoration
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant TREK Geotechnical Inc
Penninghame St - Machray Av/Church Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Pentland St - McIvor Av/Gilmore Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Pincarrow Pt - Scurfield Bv/Eglinton Cr   View Map
Facility type Street
Type of work TBO
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Document
2021_Construction Notice_Pincarrow Rd.pdf
Pioneer Av - Westbrook St / Main St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Plessis Rd - St Boniface Rd/City Limit   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed 0
Consultant AECOM
Plymouth St - Church Av / Burrows Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 28,2021
Estimated to end Late September 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor J.C. Paving Ltd.
Document
2021_Construction Notice_Plymouth St.pdf
Plymouth St - Inkster Bv / Church Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 28,2021
Estimated to end Late September 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor J.C. Paving Ltd.
Document
2021_Construction Notice_Plymouth St.pdf
Portage Av - David St / Knox St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start August 3, 2021
Estimated to end Fall 2021
Approx. % completed 70
Consultant WSP Canada Inc.
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021_Construction Notice_Portage Ave_StCharles_David.pdf
Portage Av - Main St / Memorial Bv   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end To Be Determined
Approx. % completed Planned
Portage Av - Main St / Memorial Bv   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end To Be Determined
Approx. % completed Planned
Portage Av - St Charles St / David St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start August 3, 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant WSP Canada Inc.
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021_Construction Notice_Portage Ave_StCharles_David.pdf
Portage Av - Woodlawn St / Century St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start Late July 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Morrison Hershfield Limited
Contractor Maple Leaf Construction Ltd.
Document
2021_Construction Notice_Portage Ave.pdf
Portage Av -St James St / Moorgate St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start May 10,2021
Estimated to end Late July 2021
Approx. % completed Complete
Consultant Morrison Hershfield Limited
Contractor Maple Leaf Construction Ltd.
Document
2021_Construction Notice_Portage Ave.pdf
Portage Ave WB - Knox St / St Charles St   View Map
Facility type Street
Type of work Mill and Fill
Estimated to start August 3, 2021
Estimated to end Fall 2021
Approx. % completed 10
Consultant WSP Canada Inc.
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021_Construction Notice_Portage Ave_StCharles_David.pdf
Queen Elizabeth Wy - Mayfair Av/Norwood Bridge   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Queensbury By - Southglen Bv/Southglen Bv   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Queensbury By.pdf
Redwood Av - Salter St / Main St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Regent Av W - Plessis Rd / Rougeau Av   View Map
Facility type Bridge
Type of work Rehabilitation
Estimated to start May 12, 2021
Estimated to end Late July 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Borland Construction
Additional information Click here
Document
2021 Construction Notice_Regent Ave.pdf
Regent Av W - Plessis Rd / Rougeau Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 12, 2021
Estimated to end Late July 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor Borland Construction
Additional information Click here
Document
2021 Construction Notice_Regent Ave.pdf
Regis Dr - Charing Cross Cr / Paddington Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice_Regis Dr.pdf
Riley Cr - Wicklow St / Dowker Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 26, 2021
Estimated to end Mid September 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021 Construction Notice_Riley Cres.pdf
River Av - Osborne St / Wellington Cr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Roblin Blvd - Shelmerdine Dr / Dieppe Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 11, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Stantec Consulting Ltd
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2021 Construction Notice_Roblin.pdf
Roblin Blvd - Shelmerdine Dr / Dieppe Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 11, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Stantec Consulting Ltd
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2021 Construction Notice_Roblin.pdf
Roblin Blvd - Shelmerdine Dr / Stack St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 8,2020
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Stantec Consulting Ltd
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2021 Construction Notice_Roblin.pdf
Roblin Blvd - Shelmerdine Dr/ Stack St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 8,2020
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Stantec Consulting Ltd
Contractor Bituminex Paving Ltd
Additional information Click here
Document
2021 Construction Notice_Roblin.pdf
Roblin Bv - Assiniboine Park Dr/Shaftesbury Bv   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant City Of Winnipeg - Engineering Division
Ross Av - Paulin St / Ellen St   View Map
Facility type Street
Type of work TBO
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Ross Ave2.pdf
Ross Av W - Keewatin St / Worth St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 14, 2021
Estimated to end Late July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Ross Ave.pdf
Rouge Rd - Erlandson Dr / Assiniboine Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start September 13, 2021
Estimated to end Fall 2021
Approx. % completed 30
Consultant WSP Canada Inc
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Rouge Road.pdf
Royal Mint Dr - 209/249 Service Road   View Map
Facility type Street
Type of work TBO
Estimated to start August 30, 2021
Estimated to end Late September 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Royal Mint Dr.pdf
Sage Creek Path - De La Seigneurie Bv / Lagimodiere Bv   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start July 26, 2021
Estimated to end Early September 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice _Seigneurie Park Pathway.pdf
Salter St - Cathedral Av / Slaw Rebchuk Bridge   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start April 26, 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant Stantec Consulting Ltd
Contractor Darco Group Ltd.
Additional information Click here
Document
2021 Construction Notice_Salter St.pdf
Salter St - Jefferson Av / Inkster Bv   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sargent Av - Edmonton St / Furby St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sargent Av/Ellice Av - Ingersoll St/Sherburn St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start May 3,2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Asphaltec Paving
Document
2021 Construction Notice_Sherburn_ Ingersoll Alley.pdf
Sargent Ave - Empress St / St James St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start August 3, 2021
Estimated to end Mid October 2021
Approx. % completed 80
Consultant Morrison Hershfield Limited
Contractor Borland Construction
Document
2021_Construction Notice_Sargent Ave_ Second Letter .pdf
Scotsborough Pl - Beckinsale By/Novavista Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed 10
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021 Construction Notice_Scotsborough Pl.pdf
Scurfield Bv - Columbia Dr/Portwood Rd   View Map
Facility type Street
Type of work TBO
Estimated to start September 23, 2021
Estimated to end Fall 2021
Approx. % completed 10
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Scurfield Blvd.pdf
Scurfield Park   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start August 23, 2021
Estimated to end Early September 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Document
2021_Construction Notice_Scurfield Park.pdf
Selkirk Av - Main St / Salter St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Selkirk Ave - Arlington St / McPhillips St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 20
Consultant Stantec Consulting Ltd
Contractor Bayview Construction Ltd
Additional information Click here
Document
2020 Construction Notice - Selkirk Ave 1.pdf
Sherburn St - Ellice Av/St Matthews Av   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start May 25, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021_Construction Notice_Sherburn St.pdf
Sherwin Rd - Notre Dame Av / Omand's Creek Culvert Crossing   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Morrison Hershfield Limited
Contractor Bayview Construction Ltd
Sherwin Rd - Notre Dame Av / Saskatchewan Av   View Map
Facility type Bridge
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Morrison Hershfield Limited
Sherwin Rd - Omand's Creek Culvert Crossing / Saskatchewan Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Morrison Hershfield Limited
Contractor Bayview Construction Ltd
Sinclair St - Atlantic Av / Cathedral Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 23, 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Constrution Notice_Sinclair St.pdf
Sinclair St - Cathedral Av / Machray Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 23, 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Constrution Notice_Sinclair St.pdf
Sinclair St - Inkster Bv / Polson Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 23, 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Constrution Notice_Sinclair St.pdf
Sinclair St - Polson Av / Atlantic Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start June 23, 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Bayview Construction Ltd
Document
2021_Constrution Notice_Sinclair St.pdf
Smith - Notre Dame / York Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2022
Estimated to end Fall 2022
Approx. % completed Planned
Consultant AECOM Canada Ltd
Additional information Click here
Smith St - Notre Dame / Graham Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant AECOM Canada Ltd
Additional information Click here
Southboine Dr - Berkley St N/Kinkora Dr   View Map
Facility type Street
Type of work TBO
Estimated to start September 15, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc.
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Southboine Dr.pdf
Southwalk By - Charing Cross Cr / Charing Cross Cr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice_Southwalk By.pdf
Springfield Rd - Brian St / Rothesay St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start May 25, 2021
Estimated to end Late July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor Darco Group Ltd.
Document
2021_Construction Notice_Springfield Rd.pdf
St Annes Rd - Meadowood Dr/Novavista Dr   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
St Annes Rd - Novavista Dr/Meadowood Dr   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
St Annes Rd - St Marys Rd / Fermor Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
St Mary Av - Garry St / Smith St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start May 17, 2021
Estimated to end Mid July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_St Mary Ave Sidewalk.pdf
St Mary Av - Hargrave St / Carlton St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start May 17, 2021
Estimated to end Mid July 2021
Approx. % completed 60
Consultant City Of Winnipeg - Engineering Division
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_St Mary Ave Sidewalk.pdf
St Mary Av - Main St / Garry St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start May 17, 2021
Estimated to end Mid July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_St Mary Ave Sidewalk.pdf
St Mary Av - Memorial Bv / Portage Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
St Mary Av - Memorial Bv / Portage Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
St Mary Av - Smith St / Hargrave St   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start May 17, 2021
Estimated to end Mid July 2021
Approx. % completed 60
Consultant City Of Winnipeg - Engineering Division
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_St Mary Ave Sidewalk.pdf
St Marys Rd - Eugenie St/Norwood Bridge   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
St Marys Rd - Norwood Bridge/Eugenie St   View Map
Facility type Street
Type of work Preservation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant WSP Canada Inc.
Stafford St - Corydon Ave/Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Stiles St / Craig St - Portage Av / Wolseley Av   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start May 31, 2021
Estimated to end Late July 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2021 Completion Notice 21-RL-03_Craig St_Stiles St.pdf
Stradbrook Ave - Wellington Cr / Osborne St   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Strauss Dr - 80 Strauss Dr / Thompson Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start September 27, 2021
Estimated to end Fall 2021
Approx. % completed 30
Consultant WSP Canada Inc
Contractor Darco Group Ltd.
Document
2021_Construction Notice_ Strauss Dr.pdf
Strauss Dr - Strauss Dr / 80 Strauss Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start September 27, 2021
Estimated to end Fall 2021
Approx. % completed 30
Consultant WSP Canada Inc
Contractor Darco Group Ltd.
Document
2021_Construction Notice_ Strauss Dr.pdf
Sturgeon Creek Path - Saskatchewan Av / Silver Av   View Map
Facility type Pedestrian / Cycling
Type of work Reconstruction
Estimated to start September 13, 2021
Estimated to end Fall 2021
Approx. % completed 5
Consultant City Of Winnipeg - Engineering Division
Contractor L.Chabot Enterprises
Document
2021_Construction Notice_Sturgeon Creek2.pdf
Sturgeon Rd - Ness Av / Hallonquist Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sturgeon Rd - Ness Av / Hallonquist Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Sutherland Av - Main St/Argyle St N   View Map
Facility type Sidewalk
Type of work Reconstruction
Estimated to start June 14, 2021
Estimated to end Early July 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Engineering Division
Contractor JRoss Construction and Landscaping Ltd.
Document
2021_Construction Notice_Sutherland Ave.pdf
Sweetwater By - Edgewater Dr / Edgewater Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Summer 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice_Sweetwater By.pdf
Syndicate St - Rover Av/Sutherland Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant City Of Winnipeg - Streets Maintenance Division
Contractor City Of Winnipeg - Centralized Services
Syracuse Cr - Chancellor Dr / Chancellor Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Late May 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant Dillon Consulting Limited
Contractor J.C. Paving Ltd.
Document
2021_Pre-Construction Notice_Syracuse Cres.pdf
Taylor Ave - Harrow St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Additional information Click here
Taylor Ave - Wilton St / Harrow St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start April 26, 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Contractor Maple Leaf Construction Ltd.
Additional information Click here
Document
2021 Construction Notice_Taylor Ave.pdf
Taylor Ave - Wilton St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start April 26, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant Stantec Consulting Ltd
Additional information Click here
Taylor Ave - Wilton St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start April 26, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant Stantec Consulting Ltd
Additional information Click here
Taylor Ave - Wilton St / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start April 26, 2021
Estimated to end Fall 2021
Approx. % completed 50
Consultant Stantec Consulting Ltd
Additional information Click here
Thompson Dr - Strauss Dr / Ness Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed 20
Consultant WSP Canada Inc
Contractor Darco Group Ltd.
Thornhill By - Rochester Av/Rochester Av   View Map
Facility type Street
Type of work TBO
Estimated to start May 10, 2021
Estimated to end Summer 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Thornhill Bay.pdf
Transcona Bv - In close proximity to retention pond   View Map
Facility type Sidewalk
Type of work Slope Restoration
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant KGS Group Limited
Trowbridge By - Malmsbury Av/Knotsberry By   View Map
Facility type Street
Type of work TBO
Estimated to start May 17, 2021
Estimated to end Mid June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Maple Leaf Construction Ltd.
Document
2021_ Construction Notice_Trowbridge Bay.pdf
Tully Rd - Durward St/Garden Park Dr   View Map
Facility type Street
Type of work TBO
Estimated to start October 6, 2021
Estimated to end Fall 2021
Approx. % completed 20
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Document
2021 Construction Notice_Tully Rd.pdf
Ulster St - Dalhousie Dr/Mapleridge Av   View Map
Facility type Street
Type of work TBO
Estimated to start May 10, 2021
Estimated to end Summer 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Ulster St.pdf
University Cr - Chancellor Matheson Rd / Pembina Hw   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 19, 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Document
2021_Construction Notice_University Cres.pdf
University Cr - Pembina Hw / Sifton Rd   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start July 19, 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Document
2021_Construction Notice_University Cres.pdf
University Cr - Sifton Rd / Chancellor Matheson Rd   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 19, 2021
Estimated to end Fall 2021
Approx. % completed 90
Consultant AECOM Canada Ltd
Contractor Bayview Construction Ltd
Document
2021_Construction Notice_University Cres.pdf
Uxbridge Rd N - Bonner Av/South Limit   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Wall St - St Matthews Av / Wellington Av   View Map
Facility type Street
Type of work Reconstruction
Estimated to start July 26, 2021
Estimated to end Fall 2021
Approx. % completed 60
Consultant Morrison Hershfield Limited
Contractor J.C. Paving Ltd.
Additional information Click here
Document
2021 Construction Notice_Wall Street_Wellington to Richard.pdf
Wall St - Wellington Av / Notre Dame Ave   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Morrison Hershfield Limited
Contractor J.C. Paving Ltd.
Additional information Click here
Watercress Rd - Cormorant By / Edgewater Dr   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant AECOM Canada Ltd
Contractor J.C. Paving Ltd.
Document
2021 Pre-Construction Notice_Watercress Rd.pdf
Wellington Cr - River Av / Stradbrook Av   View Map
Facility type Street
Type of work Rehabilitation
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Wellington Crescent - Path and Roadway Project   View Map
Facility type Street
Type of work Reconstruction
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant KGS Group
Westminster Av - Young St / 150m west of Maryland St   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start Late June 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant Urban Systems
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_Wolseley Bike Project.pdf
Westminster Av / Dundurn Pl - Maryland St / Walnut St   View Map
Facility type Alley
Type of work Reconstruction
Estimated to start July 19, 2021
Estimated to end Fall 2021
Approx. % completed Complete
Consultant WSP Canada Inc
Contractor Asphaltec Paving
Document
2021 Construction Notice_Westminster Ave_Dundurn Pl_Phase 2.pdf
William Av - Arlington St / McPhillips St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Consultant Stantec Consulting Ltd
Contractor Bayview Construction Ltd
Additional information Click here
William Stephenson Wy - Main St / Westbrook St   View Map
Facility type Street
Type of work Reconstruction
Estimated to start To Be Determined
Estimated to end To Be Determined
Approx. % completed Planned
Woodside Cr - Kildonan Meadow Dr/Kildonan Meadow Dr   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Wynyard By - Southwell Rd/Manthorne Av   View Map
Facility type Street
Type of work TBO
Estimated to start June 1, 2021
Estimated to end Late June 2021
Approx. % completed Complete
Consultant KGS Group Limited
Contractor Wintec Building Services Inc.
Document
2021_Construction Notice_Wynard Bay.pdf
Young St - Balmoral St / Westminster Av   View Map
Facility type Pedestrian / Cycling
Type of work New - Pedestrian / Cycling
Estimated to start Late June 2021
Estimated to end Late August 2021
Approx. % completed Complete
Consultant Urban Systems
Contractor J&D Penner Ltd.
Document
2021_Construction Notice_Wolseley Bike Project.pdf
Youville St - Guay Av/Haig Av   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving
Zawaly By - Kildare Av E/Kildare Av E   View Map
Facility type Street
Type of work TBO
Estimated to start Spring 2021
Estimated to end Fall 2021
Approx. % completed Planned
Consultant WSP Canada Inc.
Contractor Asphaltec Paving

Disclaimer and Indemnity:

The information on this web site is provided as a public service and should be used for general information purposes only. Although the information provided represents the planned capital work on city infrastructure for the current year, the City of Winnipeg cannot guarantee that it is accurate or current at all times. Although it is rare that projects are not finished within the stated timeframe, the City cannot guarantee that the work will be completed in all cases.

The information on this web site is subject to change without notice. Winnipeg.ca AND ITS AFFILIATES ARE NOT RESPONSIBLE IN ANY MANNER FOR DIRECT, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES HOWSOEVER CAUSED RESULTING FROM THE USE, MISUSE OR MISINTERPRETATION OF ANY CONTENT, PRODUCTS OR SERVICES PROVIDED BY THIS WEB SITE.

By using this site, you agree to indemnify, defend and hold harmless City of Winnipeg and its officials, officers, employees and authorized representatives from and against any liability, loss injury (including injuries resulting in death), demand, action, cost, expense, or claim of any kind, including but not limited to lawyer's fees, relating in any way to your use of the contents, or services provided by this web site.


Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.

Ces renseignements sont-ils utiles?

Comment pourrait-on améliorer cette page Web?

Les renseignements recueillis serviront à l’amélioration de notre site Web. Prière de ne pas se servir de ce formulaire pour soumettre une demande de service ou de renseignements, car la demande ne sera pas transmise au service en question. Pour soumettre une demande de service ou de renseignements, veuillez communiquer avec le 311.

Le présent formulaire ne vise pas à recueillir des renseignements personnels. Cependant, les renseignements personnels que vous choisissez d’inclure dans vos commentaires sont recueillis par la Ville de Winnipeg en conformité avec l’alinéa 36(1)b) de la Loi sur l’accès à l’information et la protection de la vie privée dans le but d’améliorer son site Web et ne seront ni utilisés ni divulgués pour d’autres raisons, sauf dans les cas où cela est autorisé par la loi. Communiquez avec l’agent de l’accès à l’information et de la protection de la vie privée de la Ville par courrier au Bureau du greffier, immeuble Susan-A.-Thompson, 510, rue Main, Winnipeg (Manitoba) R3B 1B9, ou par téléphone au 311 si vous avez des questions sur la collecte de ces renseignements.