Traffic Studies
The City of Winnipeg periodically conducts small- and medium-scale traffic studies – usually as a response to resident concerns or specific issues within an area – to determine what we can do to improve traffic flow, increase safety or resolve other concerns.
Our current and recently completed projects are listed below.
- Current Studies
- Past Studies
Status | Ward | Project | Topic | More Info | Date |
---|---|---|---|---|---|
In progress | Fort Rouge-East Fort Garry | Stradbrook Avenue and Wellington Crescent | Pedestrian safety | Motion to study | 2020-09-16 |
In progress | St. Vital | Waterton Drive and Bridgetown Drive | Traffic study | Motion to study | 2020-09-16 |
In progress | River Heights-Fort Garry | Grosvenor Avenue and Wellington Crescent | Traffic study | Motion to study | 2020-09-16 |
In progress | St. Vital | River Point Drive at River Road | Traffic study | Motion to study | 2020-07-07 |
In progress | St. Vital | Bishop Grandin Boulevard and River Road | Traffic study | Motion to study | 2020-07-07 |
In progress | St. Boniface | Beaverhill Boulevard at Bluewater Crescent | Pedestrian safety | Motion to study | 2020-07-07 |
In progress | Transcona | Dugald Road at Ravenhurst Street | Traffic study | Motion to study | 2020-07-07 |
In progress | St. James | Hamilton Avenue from Saskatchewan Avenue to Cavalier Drive | Traffic study | Motion to study | 2020-07-07 |
In progress | Waverley West | Lee Boulevard between Shore Street and Barnes Avenue | Traffic calming measures | Motion to study | 2020-07-07 |
In progress | Charleswood-Tuxedo-Westwood | Roblin Boulevard at Municipal Road | Pedestrian safety | Motion to study | 2020-07-07 |
In progress | Charleswood-Tuxedo-Westwood | Roblin Boulevard at Scotswood Drive | Traffic study | Motion to study | 2020-05-19 |
In progress | Waverley West | Centre Street at Park West Drive and Park East Drive | Traffic study | Motion to study | 2020-05-19 |
In progress | Charleswood-Tuxedo-Westwood | Laxdal Road from Grant Avenue to Ridgewood Avenue | Traffic calming measures | Motion to study | 2020-05-19 |
In progress | River Heights-Fort Garry Ward | Corydon Avenue and Lanark Street | Pedestrian safety | Motion to study | 2020-04-21 |
In progress | Waverley West | Kenaston Boulevard and Scurfield Boulevard | Traffic & speed study | Motion to study | 2020-04-21 |
In progress | Charleswood-Tuxedo-Westwood | Roblin Boulevard at the entrance to Assiniboine Park Zoo | Pedestrian safety | Motion to study | 2020-04-21 |
In progress | Waverley West | Bridge Lake Drive between Water Bend Road and Water Bend Road | Traffic & speed study | Traffic calming measures referred for funding | 2020-05-19 |
In progress | Charleswood-Tuxedo-Westwood | Country Club Boulevard and Portage Avenue | Traffic study | Motion to study | 2020-03-03 |
In progress | Charleswood-Tuxedo-Westwood | Taylor Avenue and Shaftesbury Boulevard | Pedestrian safety | Motion to study | 2020-03-03 |
In progress | St. Norbert-Seine River | St. Mary's Road between Van Hull Way and Britannica Road | Traffic calming measures | Motion to study | 2020-03-03 |
In progress | Transcona | Plessis Road Heavy Truck Access | Traffic study | Motion to study | 2020-02-04 |
In progress | Waverley West | Bison Drive and Waverley Street | Anticipated traffic volumes | Motion to study | 2020-02-04 |
In progress | Waverley West | Keslar Road and Bairdmore Boulevard | Traffic calming measures | Motion to study | 2020-02-04 |
In progress | Charleswood-Tuxedo-Westwood | Corydon Avenue Westbound at Lamont Boulevard | Left turn restriction | Motion to study | 2020-02-04 |
In progress | St. Vital | Edward Turner Drive | Traffic calming measures | Motion to study | 2020-01-07 |
In progress | Fort Rouge | Lord Roberts Community Traffic Study | Community traffic | 2019-01-29 | |
In progress | North Kildonan | Springfield Road and Raleigh Street | Traffic calming measures | 2019-01-29 | |
In progress | Daniel McIntyre | St. Matthews Avenue and Simcoe Street | Traffic study | Motion to study | 2020-01-07 |
In progress | Point Douglas | Burrows Avenue at McPhillips Street | Left turn signals | Administrative Report | 2019-02-25 |
In progress | City-wide | Yellow Advanced Flashing Lights | Traffic Study | Light installation approved for implementation at two intersections | 2019-05-19 |
In progress | Transcona | Reendeers Drive | Speed warrant study | Minutes | 2019-04-02 |
In progress | St. Boniface | Norwood BIZ Area | Time Limited Parking Study | Minutes | 2019-04-02 |
In progress | Point Douglas | Isabel Street and Alexander Avenue | Traffic Study | Minutes | 2019-04-02 |
In progress | Point Douglas | Half Signal Crossing at Isabel Street and Ross Avenue | Traffic Study | Minutes | 2019-04-02 |
In progress | Charleswood-Tuxedo-Westwood | Corydon Avenue at Edgeland | Pedestrian safety | Motion to study | 2019-10-01 |
In progress | St. Boniface | Birchdale Drive | Traffic study | Motion to study | 2020-09-16 |
In progress | Point Douglas | Logan Avenue and Keewatin Street | Signal improvements | Motion to study | 2019-11-25 |
In progress | Point Douglas | Alexander Avenue and Keewatin Street | Pedestrian safety | Motion to study | 2019-11-25 |
In progress | Point Douglas | Alexander Avenue at Quelch Street | Pedestrian safety | Motion to study | 2019-11-25 |
Status | Ward | Project | Topic | More Info | Date |
---|---|---|---|---|---|
Complete | Old Kildonan | McPhillips Street at North Point Boulevard | Traffic safety | Traffic control signals referred for implementation | 2020-05-19 |
Complete | St. Norbert-Seine River | Aldgate Road at Highbury Street | Pedestrian safety | RRFB referred to prioritization | 2020-04-21 |
Complete | Elmwood-East Kildonan | Henderson Highway Traffic Signals Performance | Traffic study | Changes not feasible under current conditions | 2020-05-19 |
Complete | Charleswood-Tuxedo-Westwood | Cuthbertson Avenue at Lamont Boulevard | Pedestrian safety | Pathway improvements referred to Pedestrian Cycling Strategies | 2020-03-03 |
Complete | Transcona | Plessis Southbound Barrier | Feasibility study | Changes not warranted | 2020-07-07 |
Complete | Waverley West | Centre Street between North Town Road and Park West Drive | Pedestrian safety | Pedestrian safety improvements referred for funding | 2020-02-04 |
Complete | Charleswood-Tuxedo-Westwood | Camp Manitou Road and Oak Forest Crescent | Traffic study | Changes not warranted | 2020-01-07 |
Complete | Transcona | McMeans Avenue Back Lane | Traffic light study | Light installation approved for implementation | 2020-01-07 |
Complete | Transcona | Peguis Street at Prairie Crocus Drive | Traffic study | Changes not warranted at this time; further study required | 2020-04-21 |
Complete | Charleswood-Tuxedo-Westwood | Wilkes Avenue and Elmhurst Road | Traffic calming measures | Changes not warranted | 2019-10-01 |
Complete | Daniel McIntyre | St. Matthews Avenue and Arlington Street | Signage study | Changes referred for further investigation | 2019-11-04 |
Complete | Waverley West | Hawstead Road | Speed study | Changes referred for further investigation | 2020-03-03 |
Complete | Waverly West | Kenaston Boulevard between North Town and South Town Roads | Speed reduction study | Advanced warning flashers referred for funding | 2020-02-04 |
Complete | North Kildonan | Donwood Drive | Traffic study | Crosswalk approved | 2020-02-04 |
Complete | Waverley West | Waverley Street Speed Limit signage and safety improvements | Traffic study | Changes not warranted | 2020-02-04 |
Complete | North Kildonan | Kingsford Avenue and Hawthorne Avenue | Traffic count | Changes not warranted | 2020-05-19 |
Complete | Transcona | Speed Humps - Reg Wyatt Way | Traffic calming measures | Changes not warranted | 2020-04-21 |
Complete | Mynarski | Pedestrian corridors on McGregor Street | Pedestrian safety | Pedestrian corridor at Hartford approved for implementation | 2020-03-03 |
Complete | Waverley West | Appleford Gate between Brace Bridge Road and Bison Drive | Traffic calming measures | Traffic calming measures referred for funding | 2020-03-03 |
Complete | Point Douglas | Shaughnessy Street between Redwood and Burrows | Traffic study | Changes not warranted | 2019-09-12 |
Complete | Charleswood-Tuxedo-Westwood | Laxdal Road from Grant Avenue to Ridgewood Avenue | Traffic calming measures | Changes not warranted | 2020-03-03 |
Complete | Waverley West | Marrington Road and Kirkbridge Park | Traffic calming measures | Speed tables referred for funding | 2020-03-03 |
Complete | North Kildonan | 1139 Gateway Road | By-pass lane | Changes not warranted | 2019-06-25 |
Complete | Charleswood-Tuxedo-Westwood | Sansome Avenue | Traffic Study | Changes not warranted | 2020-02-04 |
Complete | St. Vital | Ecole Sage Creek School | Traffic Study | Pedestrian safety improvements referred for funding | 2020-02-04 |
Complete | St. Boniface | Warde Avenue and Boulevard de la Seigneurie | Traffic control measures | All-way stop approved for implementation | 2019-11-04 |
Deferred | St. Boniface | No Right Turns on Marion Street and Tache Avenue | Traffic Study | Rolled into Marion Street Improvement Study | 2019-04-02 |
Deferred | St. Boniface | Back Lane between Marion Street and Goulet Street | Traffic calming measures | Rolled into Marion Street Improvement Study | 2019-04-02 |
Complete | Waverley West | Keslar Road | Traffic study | Changes approved | 2019-04-02 |
Complete | St. Boniface | Lakewood Boulevard | Pedestrian safety | Changes not warranted | 2019-05-02 |
Complete | St. Boniface | Rue Aulneau at Avenue de la Cathedrale | Traffic calming measures | Changes approved | 2019-02-25 |
Complete | St. Boniface and St. Vital | Egerton Road and Youville Street | Sunday/Holiday bike route | Changes not warranted | 2019-09-12 |
Complete | Transcona | East Mint Place along Lagimodiere Boulevard | Traffic study | Minutes | 2019-09-12 |
Complete | St. Boniface | Panet Road between Dugald and Marion | Sidewalk placement | Changes not warranted | 2019-09-12 |
Complete | St. Boniface | Reopening of Speers Road for Pedestrian and Cyclist Use | Traffic Study | Changes not warranted | 2019-09-12 |
Complete | Elmwood-East Kildonan | Pedestrian control signal at Polson School | Traffic calming measures | Installation approved | 2019-11-25 |
Complete | Old Kildonan | Traffic control signal for McPhillips and Murray | Traffic calming measures | Installation approved | 2019-11-25 |
Complete | Transcona | Traffic control signal for Peguis at Ravelston | Traffic calming measures | Installation approved | 2019-11-25 |
Complete | St. Boniface | Traffic control measures for Warde and de la Seigneurie | Traffic calming measures | Changes not warranted | 2019-11-25 |
Complete | St. James | Ness Avenue and Thompson Drive | Traffic study | Changes not warranted | 2019-09-12 |
Complete | Fort Rouge - East Fort Garry | Access to a Proposed Residential Development Located at 255 Bell | Approach | Variance granted | 2019-04-02 |
Complete | North Kildonan | Access to a Residential Development at 455 Edison Avenue | Approach | Variance granted | 2019-04-02 |
Complete | Point Douglas | Access to a Proposed Parking Lot Located at 470 Logan Ave | Approach | Approach approved with conditions | 2019-04-02 |
Complete | St. Boniface | Goulet Street | Time Limited Parking Study | Changes to be implemented by WPA | 2019-04-02 |
Complete | St. Norbert - Seine River | Ravensden Drive at Roehamptom Place | Traffic study | Changes approved | 2019-04-02 |
Complete | Transcona | Reenders Drive at Stapon Drive | Traffic Island | Changes approved | 2019-04-02 |
Complete | Transcona | Edmund Gale Drive at George Reshaur Bay at Sir Winston Churchill Park | Crosswalk study | Crosswalk is warranted | 2019-04-02 |
Complete | Transcona | Access to a Proposed Commerical Property Located on the South Side of Fermor Ave East of Lagimodiere | Approach | Variance granted | 2019-04-02 |
Complete | Point Douglas | Back-in Angled Parking Pilot | Pilot program | Pilot made permanent | 2019-01-29 |
Complete | St. Norbert - Seine River | Pembina Highway Speed Limit Review | Speed | Extended to February 2019 | 2019-01-29 |
Complete | North Kildonan | McIvor Ave at Kayhans Drive | Pedestrian crosswalk | Crosswalk not warranted | 2019-01-29 |
Complete | St. James | Access to an Existing Commerical Property - 565 Roseberry Street | Approach | Continued use approved | 2019-02-25 |
Complete | St. James | Access to an Existing Commercial Property - 1688 St. Matthews Ave | Approach | Approach approved | 2019-02-25 |
Complete | Point Douglas | Redwood Avenue at Sheppard Street | Four-way stop | All-way stop not warranted | 2019-02-25 |
Complete | Point Douglas | Garton Avenue between Inkster Garden Boulevard and Old Commonwealth Path | Traffic calming measures | Changes not warranted | 2019-02-25 |
Complete | St. James | Booth Drive | Pedestrian crosswalk | Crosswalk approved | 2019-02-25 |
Complete | Waverley West | Chancellor Drive | Traffic calming measures | Signage changes approved | 2019-02-25 |
Complete | Transcona | East Mint Place along Lagimodiere Boulevard | Northbound turning lane | No change warranted at this time | 2019-03-06 |
Complete | Waverley West | Pembina Highway at Bairdmore | Left turn signal | Changes approved | 2019-06-25 |
Complete | Waverley West | Tim Sale Drive and Kirkbridge Drive | Four-way stop | Changes not warranted | 2019-06-25 |
Complete | Daniel McIntyre | Wellington Avenue and Arlington Street | Traffic control measures | Changes not warranted | 2019-06-25 |
Complete | Residential Review | Traffic Study | Changes not warranted | 2019-06-25 | |
Complete | Point Douglas | Traffic Control on Isabel at Ross/Alexander | Pedestrian safety | Changes recommended | 2019-06-25 |
Complete | Charleswood-Tuxedo-Westwood | Crossing Control at Grant Avenue & Cathcart | Pedestrian safety | Recommendations | 2019-06-25 |
Complete | River Heights-Fort Garry | Crossing Control at Grosvenor Avenue and Lilac Street | Pedestrian safety | Recommendations | 2019-06-25 |
Complete | Traffic Control Signals for the Northwest Hydro Corridor Pathway | Pedestrian and cycling safety | Recommendations | 2019-06-25 | |
Complete | Charleswood-Tuxedo | Cullen Drive | Safety measures | Changes not warranted | 2019-09-12 |
Complete | Waverley West | Hawstead Road | Traffic Calming | Minutes | 2020-03-10 |
Last update:
April 20, 2021