Last Update: April 26, 2024 12:01 p.m.
Andrews St to Powers St
Expected Duration: 05 Jul 2023 - 03 May 2024
North side sidewalk, closed for building construction/maintenance.
Jefferson Av to Nicholson Cr
Expected Duration: 15 Apr 2024 - 26 Apr 2024
Westbound curb lane, south side sidewalk, closed for communications work.
Aberdeen Av to Boyd Av
Expected Duration: 15 Nov 2023 - 20 May 2024
East side sidewalk, closed for street construction/maintenance.
Lily St to Martha St
Expected Duration: 29 Apr 2024 - 31 May 2024
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Lily St to Waterfront Dr
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for film production or special event/festival.
Martha St to Lily St
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, south side sidewalk, closed for film production or special event/festival.
Yeomans St to McPhillips St
Expected Duration: 29 Apr 2024 - 01 May 2024
Westbound curb lane, closed for sewer work.
Buchanan Bv to Stewart St
Expected Duration: 28 Apr 2024 - 30 Apr 2024
Westbound curb lane, eastbound curb lane, closed for film production or special event/festival.
Elizabeth Rd to Prosper St
Expected Duration: 05 May 2024 - 17 May 2024
Northbound curb lane, northbound median lane, east side sidewalk, closed for electrical/lighting/signals work. Two-way traffic maintained on southbound lanes.
Marion St to Messier St
Expected Duration: 28 Apr 2024 - 28 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for water work.
Provencher Bv to Tissot St
Expected Duration: 16 Apr 2024 - 06 May 2024
Back lane/public lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Logan Av to Dufferin Av
Expected Duration: 21 Nov 2023 - 21 Nov 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk.
Newton Av to Sly Dr
Expected Duration: 22 Apr 2024 - 31 May 2024
Westbound curb lane, closed for water work.
Tulip Rd to Viola St
Expected Duration: 16 Apr 2024 - 24 May 2024
Northbound curb lane, closed for water work.
McDermot Av to Notre Dame Av
Expected Duration: 02 May 2024 09:00 a.m. - 02 May 2024 04:00 p.m.
Southbound median lane, southbound painted bike lane, east side sidewalk, closed for communications work.
Academy Rd to Kingsway
Expected Duration: 21 Mar 2024 - 29 Apr 2024
Northbound median lane, closed for water work.
Grant Av to Mathers Av
Expected Duration: 25 Apr 2024 - 17 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for water work.
Riddle Av to Wolever Av
Expected Duration: 22 Apr 2024 - 10 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for water work.
Ashcroft Pt to Woodhaven Bv
Expected Duration: 05 May 2024 - 05 May 2024
Eastbound curb lane, closed for film production or special event/festival.
Parkside Dr to Ferry Rd
Expected Duration: 05 May 2024 - 05 May 2024
Westbound curb lane, closed for film production or special event/festival.
Portage Av to Pinewood Dr
Expected Duration: 05 May 2024 - 05 May 2024
Eastbound curb lane, closed for film production or special event/festival.
Woodbridge Rd to Lake St
Expected Duration: 05 May 2024 - 05 May 2024
Westbound curb lane, closed for film production or special event/festival.
Locomotive Dr to Pavilion Cr
Expected Duration: 05 May 2024 - 05 May 2024
Westbound curb lane, closed for film production or special event/festival.
Pandora Av W to Cedargrove Cr
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Northbound curb lane, closed for communications work.
Casey St to Fisher St
Expected Duration: 30 Mar 2024 - 29 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Adelaide St to Princess St
Expected Duration: 13 Dec 2023 - 12 Dec 2024
Westbound median lane, closed for loading/unloading.
Gertie St to Harriet St
Expected Duration: 15 Apr 2024 - 28 Jun 2024
South side sidewalk, closed for building construction/maintenance.
King St to Princess St
Expected Duration: 24 Apr 2024 - 24 May 2024
King St to Princess St
Expected Duration: 22 Feb 2024 - 30 Apr 2024
Waterfront Dr to Rorie St
Expected Duration: 06 Sep 2022 - 30 Sep 2024
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Aikins St to Salter St
Expected Duration: 21 Apr 2024 - 10 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, closed for water work.
Dunkirk Dr to St Marys Rd
Expected Duration: 18 Apr 2024 - 06 May 2024
Westbound curb lane, north side sidewalk, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Marlton Cr to Oakdale Dr
Expected Duration: 22 Apr 2024 - 30 Jun 2025
Change in parking restrictions due to building construction. No lane closures.
Ferrier St to End
Expected Duration: 29 Apr 2024 - 15 Jul 2024
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for street construction/maintenance.
Main St to Aikins St
Expected Duration: 14 Apr 2024 - 28 Apr 2024
North side sidewalk, south side sidewalk, closed for water work.
Traverse Av to Kenny St
Expected Duration: 30 Apr 2024 - 06 May 2024
Back lane/public lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Robson St to Atwood St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Westbound curb lane, closed for communications work.
Pembina Hw to River Rd
Expected Duration: 05 Feb 2024 - 28 Feb 2025
Eastbound shoulder lane, closed for sewer work.
Centre St to Park East Dr
Expected Duration: 06 Jan 2023 - 01 Jun 2025
South side sidewalk, closed for building construction/maintenance.
Centre St to Park West Dr
Expected Duration: 25 Apr 2024 - 26 Apr 2024
Eastbound curb lane, closed for building construction/maintenance.
Centre St to Park West Dr
Expected Duration: 22 Apr 2024 - 26 Apr 2024
Eastbound curb lane, closed for building construction/maintenance.
Cherrywood Rd to Willow Creek Rd
Expected Duration: 06 May 2024 - 09 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Carlton St to Osborne St N
Expected Duration: 29 Apr 2024 - 26 Jul 2024
Westbound middle lane, westbound curb lane, closed for street construction/maintenance.
Spence St to Furby St
Expected Duration: 29 Apr 2024 - 13 May 2024
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Kingsway to Grosvenor Av
Expected Duration: 14 Mar 2024 - 29 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for water work.
Ness Av to Silver Av
Expected Duration: 24 Apr 2024 - 30 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for sewer work.
Sinawik By to Ainslie St
Expected Duration: 17 Jul 2023 - 31 May 2024
North side sidewalk, closed for building construction/maintenance.
Portage Av to Allard Av
Expected Duration: 28 Apr 2024 - 30 Apr 2024
Southbound curb lane, northbound curb lane, closed for film production or special event/festival. Lanes will be open for morning and afternoon rush hours.
Einarson Av to Portage Av
Expected Duration: 24 Oct 2023 - 31 Dec 2024
Southbound parking lane, west side sidewalk, closed due to sidewalk collapse.
Grey Heron Dr to Dr David Friesen Dr
Expected Duration: 22 Apr 2024 - 25 Apr 2024
Southbound curb lane, closed for film production or special event/festival.
Salter St to Aikins St
Expected Duration: 26 Apr 2024 - 17 May 2024
Eastbound curb lane, closed for water work.
Poseidon By to Grant Av
Expected Duration: 17 Apr 2024 - 29 Apr 2024
Northbound right turn (yield) lane, closed for street construction/maintenance.
Kingsway to Academy Rd
Expected Duration: 11 Apr 2024 - 25 Apr 2024
East side sidewalk, closed for water work.
Kingsway to Grosvenor Av
Expected Duration: 16 Mar 2024 - 29 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for water work.
Graham Av to St Mary Av
Expected Duration: 09 Jul 2018 - 01 Sep 2024
Back lane/public lane, west side sidewalk, closed for building construction/maintenance.
Graham Av to St Mary Av
Expected Duration: 02 May 2024 - 02 May 2024
Southbound curb lane, closed for loading/unloading.
Portage Av to Graham Av
Expected Duration: 29 Apr 2024 - 05 May 2024
Southbound median lane, southbound curb lane, closed for film production or special event/festival.
York Av to Assiniboine Av
Expected Duration: 06 May 2024 - 18 Oct 2024
Southbound curb lane, southbound median lane, closed for street construction/maintenance.
At Westwood Dr
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for street construction/maintenance.
Coatstone Dr to Hazelton Dr
Expected Duration: 07 May 2024 - 14 May 2024
Southbound curb lane, closed for landscaping/tree maintenance.
At Atwood St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Northbound curb lane, closed for communications work.
Jacob's Creek Rd to Bison Dr
Expected Duration: 01 May 2024 08:00 a.m. - 01 May 2024 03:00 p.m.
Complete closure of all northbound lanes, closed for building construction/maintenance.
Jacob's Creek Rd to Bison Dr
Expected Duration: 28 Feb 2024 - 30 Aug 2024
Northbound curb lane, closed for building construction/maintenance.
Gaylene Pl to Lake Village Rd
Expected Duration: 25 Mar 2024 - 29 Apr 2024
Westbound curb lane, north side sidewalk, closed for sewer work.
Moray St to William R Clement Pw
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Northbound curb lane, southbound curb lane, closed for film production or special event/festival.
Moray St to William R Clement Pw
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Northbound curb lane, southbound curb lane, closed for film production or special event/festival.
Dufresne Av to End
Expected Duration: 25 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Rose Lake Ct to Bracebridge Rd
Expected Duration: 05 May 2024 - 09 May 2024
Eastbound curb lane, south side sidewalk, closed for film production or special event/festival.
Daly St S to Montgomery Av
Expected Duration: 04 Mar 2024 - 28 Jun 2024
Complete closure of all eastbound lanes, south side sidewalk, closed for street construction/maintenance.
Wellington Cr to McMillan Av
Expected Duration: 18 Sep 2023 - 31 May 2024
West side sidewalk, closed for building construction/maintenance.
Ness Av to Portage Av
Expected Duration: 25 Apr 2024 - 27 Apr 2024
Northbound curb lane, southbound curb lane, west side sidewalk, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Silver Av to St Matthews Av
Expected Duration: 06 May 2024 - 29 Jun 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
St Matthews Av to Silver Av
Expected Duration: 25 Apr 2024 - 27 Apr 2024
Northbound curb lane, southbound curb lane, west side sidewalk, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Memorial Bv to St Mary Av
Expected Duration: 11 Nov 2023 - 28 Jun 2024
Complete closure of all southbound lanes, complete closure of all northbound lanes, west side sidewalk, closed for street construction/maintenance.
Meadowbank Rd to McGillivray Bv
Expected Duration: 26 Apr 2024 - 03 May 2024
Northbound curb lane, closed for sewer work.
Chandos Av to Gauvin St
Expected Duration: 30 Apr 2024 - 02 May 2024
Back lane/public lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Pavilion Cr to Corydon Av
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Southbound curb lane, closed for film production or special event/festival.
Pavilion Cr to Corydon Av
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Southbound curb lane, closed for film production or special event/festival.
At Arrowwood Dr S
Expected Duration: 16 Apr 2024 - 24 May 2024
Eastbound curb lane, south side sidewalk, closed for water work.
Edgeland Bv to Tuxedo Av
Expected Duration: 23 May 2023 - 01 Nov 2024
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Park Bv N to Conservatory Dr
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Complete closure of all westbound lanes, closed for film production or special event/festival.
Pipeline Rd to McPhillips St
Expected Duration: 18 Apr 2024 - 19 Aug 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for street construction/maintenance.
At Creek Bend Rd
Expected Duration: 01 Mar 2024 - 01 Sep 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for street construction/maintenance.
St Annes Rd to St Marys Rd
Expected Duration: 26 Apr 2024 - 26 Apr 2024
Westbound curb lane, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
English Pl to Riel Av
Expected Duration: 11 Apr 2024 - 29 Apr 2024
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
De La Morenie St to Des Meurons St
Expected Duration: 06 May 2024 09:00 a.m. - 31 Aug 2024 03:00 p.m.
Eastbound curb lane, east side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Bertrand St to Yelle St
Expected Duration: 12 Apr 2024 - 06 May 2024
Back lane/public lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
De La Cathedrale Av to Hamel Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Back lane/public lane, closed for street construction/maintenance.
De La Cathedrale Av to Hamel Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Southbound curb lane, closed for street construction/maintenance.
Henderson Hw to Disraeli Fwy
Expected Duration: 07 May 2024 09:00 a.m. - 07 May 2024 03:00 p.m.
Southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Ellice Av to St Mary Av
Expected Duration: 04 May 2024 - 05 May 2024
Complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Ellice Av to St Mary Av
Expected Duration: 30 Apr 2024 - 01 May 2024
Complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Notre Dame Av to Ellice Av
Expected Duration: 29 Apr 2024 - 05 May 2024
Back lane/public lane, closed for film production or special event/festival.
At Portage Av
Expected Duration: 05 May 2024 - 05 May 2024
Northbound curb lane, closed for film production or special event/festival.
Orange St to Notre Dame Av
Expected Duration: 02 May 2024 09:00 a.m. - 02 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Plessis Rd to Bates Av
Expected Duration: 03 May 2024 09:00 a.m. - 03 May 2024 03:00 p.m.
Eastbound median lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Galt Av to George Av
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Fermor Av to St Vital Bridge
Expected Duration: 01 Mar 2023 - 31 Oct 2024
1 NB & 1 SB (1 LANE IN EACH DIRECTION USING DETOUR THROUGH MEDIAN) closed for street construction/maintenance.
Bournais Dr to Hatcher Rd
Expected Duration: 30 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Kilroy St to Waverley St
Expected Duration: 06 May 2024 - 06 May 2024
Complete closure of all southbound lanes, west side sidewalk, closed for film production or special event/festival.
Assiniboine Av to York Av
Expected Duration: 06 May 2024 - 26 Jul 2024
Northbound curb lane, northbound median lane, closed for street construction/maintenance.
St Mary Av to Graham Av
Expected Duration: 11 Apr 2024 - 30 May 2024
Northbound curb lane, east side sidewalk, closed for building construction/maintenance.
Galt Av to George Av
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Keewatin St to Juba St
Expected Duration: 25 Apr 2024 - 17 May 2024
Back lane/public lane, closed for water work.
Logan Av to Henry Av
Expected Duration: 24 Apr 2024 - 26 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Erin St to Empress St
Expected Duration: 29 Apr 2024 - 01 May 2024
Eastbound median lane, eastbound curb lane, westbound curb lane, westbound median lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
McGregor St to Powers St
Expected Duration: 19 Apr 2024 - 03 May 2024
Back lane/public lane, closed for sewer work.
Ellice Av to St Matthews Av
Expected Duration: 02 May 2024 - 09 May 2024
Southbound curb lane, southbound median lane, east side sidewalk, closed for film production or special event/festival.
Kildonan Dr to Appleton St
Expected Duration: 29 Apr 2024 - 31 May 2024
Eastbound median lane, westbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Isbister St to Buchanan Bv
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Niakwa Rd E to Lagimodiere Bv
Expected Duration: 01 Apr 2024 - 26 Apr 2024
Westbound left turn storage lane 2, closed for water work.
Assiniboine Av to Broadway
Expected Duration: 27 Apr 2024 - 27 Apr 2024
Northbound median lane, west side sidewalk, closed for film production or special event/festival.
Broadway to Assiniboine Av
Expected Duration: 24 Nov 2021 - 31 May 2024
East side sidewalk, closed for building construction/maintenance.
York Av to St Mary Av
Expected Duration: 25 Apr 2024 - 26 Apr 2024
Back lane/public lane, closed for film production or special event/festival.
York Av to St Mary Av
Expected Duration: 03 May 2024 - 04 May 2024
Back lane/public lane, closed for film production or special event/festival.
Cumberland Av to Sargent Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Cumberland Av to Sargent Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Back lane/public lane, closed for street construction/maintenance.
Lily St to Waterfront Dr
Expected Duration: 23 Apr 2024 - 27 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, closed for film production or special event/festival.
Crane Av to Holly Av
Expected Duration: 19 Apr 2024 - 13 May 2024
Southbound curb lane, closed for sewer work.
Chancellor Dr to End
Expected Duration: 05 Apr 2024 - 01 Jul 2024
Southbound curb lane, closed for building construction/maintenance.
End to Waterfront Dr
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for film production or special event/festival.
Nassau St N to Osborne St
Expected Duration: 25 Oct 2022 - 01 Jun 2024
South side sidewalk, closed for building construction/maintenance.
Osborne St to Nassau St N
Expected Duration: 02 Jan 2024 - 30 Apr 2024
Complete closure of all westbound lanes, eastbound median lane, closed for building construction/maintenance. Lanes will be open for afternoon rush hour.
At Hatcher Rd
Expected Duration: 30 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
St Mary Av to Portage Av
Expected Duration: 11 Jul 2023 - 28 Jun 2024
East side sidewalk, closed for building construction/maintenance.
Edmonton St to Carlton St
Expected Duration: 02 May 2024 - 02 May 2024
Eastbound curb lane, closed for loading/unloading.
Hargrave St to Smith St
Expected Duration: 04 May 2024 - 05 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, closed for film production or special event/festival.
Hargrave St to Smith St
Expected Duration: 30 Apr 2024 - 01 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, closed for film production or special event/festival.
Elmhurst Rd to Laxdal Rd
Expected Duration: 01 May 2024 - 01 May 2024
Eastbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Pembina Hw to Ulster St
Expected Duration: 30 Apr 2024 - 30 Apr 2024
Complete closure of all westbound lanes, complete closure of all eastbound lanes, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Witham Rd to Morning Star Ln
Expected Duration: 22 Apr 2024 - 25 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, closed for film production or special event/festival.
Des Meurons St to St Marys Rd
Expected Duration: 29 Apr 2024 - 02 May 2024
Westbound curb lane, north side sidewalk, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Des Meurons St to Youville St
Expected Duration: 06 May 2024 - 31 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, closed for sewer work.
Euclid Av to Rover Av
Expected Duration: 13 Apr 2024 - 27 Apr 2024
South side sidewalk, closed for water work.
Des Meurons St to De La Morenie St
Expected Duration: 06 May 2024 09:00 a.m. - 31 Aug 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
St Jean Baptiste St to Des Meurons St
Expected Duration: 06 May 2024 - 31 Aug 2024
Eastbound curb lane, closed for street construction/maintenance.
Roch St to Brazier St
Expected Duration: 30 Apr 2024 - 13 May 2024
Westbound curb lane, closed for street construction/maintenance.
Hargrave Pl to Broadway
Expected Duration: 28 Feb 2022 - 30 May 2024
East side sidewalk, closed for building construction/maintenance.
McDermot Av to Bannatyne Av
Expected Duration: 23 Nov 2023 - 26 Apr 2024
East side sidewalk, closed for building construction/maintenance.
Pembina Hw to Harrow St
Expected Duration: 28 Apr 2024 - 28 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Pembina Hw to Harrow St
Expected Duration: 01 May 2024 - 03 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
At Bournais Dr
Expected Duration: 30 Apr 2024 - 10 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, east side sidewalk, west side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Whellams Ln to Chief Peguis Tl
Expected Duration: 29 Apr 2024 09:00 a.m. - 01 May 2024 03:00 p.m.
Northbound right turn (yield) lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Disraeli Fr to End
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for film production or special event/festival.
Patrick St to Fountain St
Expected Duration: 24 Apr 2024 - 26 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, closed for film production or special event/festival.
Birch Gr to End
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Southbound curb lane, closed for communications work.
Lizzie St to Henry Av
Expected Duration: 24 Apr 2024 - 26 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, closed for film production or special event/festival.
Caton St to Niverville Av
Expected Duration: 01 May 2024 - 07 May 2024
Back lane/public lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Portsmouth Bv to Coleraine Cr
Expected Duration: 24 Apr 2024 - 13 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
St Annes Rd to Des Meurons St
Expected Duration: 09 Apr 2024 - 29 Apr 2024
Eastbound curb lane, closed for water work.
Portage Av to St Matthews Av
Expected Duration: 16 Apr 2024 - 03 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for sewer work.
Yarwood Av to Notre Dame Av
Expected Duration: 17 Apr 2024 - 07 Jun 2024
Northbound curb lane, east side sidewalk, closed for water work.
Milner St to Bunting St
Expected Duration: 26 Apr 2024 09:00 a.m. - 26 Apr 2024 03:00 p.m.
Eastbound median lane, westbound median lane, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Powers St to Salter St
Expected Duration: 17 Apr 2024 - 10 May 2024
Eastbound curb lane, south side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Kildonan Dr to Grandview St
Expected Duration: 29 Apr 2024 - 31 May 2024
Westbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Centre St to Park West Dr
Expected Duration: 09 Nov 2022 - 30 Nov 2024
North side sidewalk, closed for building construction/maintenance.
King St to Main St
Expected Duration: 04 Jan 2022 - 31 Dec 2024
Eastbound median lane, closed for loading/unloading.
Lily St to Waterfront Dr
Expected Duration: 23 Apr 2024 - 06 May 2024
Eastbound curb lane, south side sidewalk, closed for communications work.
Watson St to McPhillips St
Expected Duration: 01 May 2024 09:00 a.m. - 02 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Cockburn St N to Hugo St N
Expected Duration: 07 Apr 2024 - 29 Apr 2024
Eastbound curb lane, closed for water work.
Riverdale St to Riverside Dr
Expected Duration: 01 May 2024 - 02 May 2024
Eastbound median lane, westbound median lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
St Mary Av to York Av
Expected Duration: 10 Apr 2023 - 30 Apr 2024
West side sidewalk, closed for building construction/maintenance.
York Av to Assiniboine Av
Expected Duration: 06 May 2024 - 26 Jul 2024
Southbound curb lane, southbound median lane, closed for street construction/maintenance.
Atwood St to Robson St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Eastbound curb lane, closed for communications work.
Aikins St to Main St
Expected Duration: 07 Apr 2024 - 03 May 2024
Eastbound curb lane, closed for water work.
Day St to Bond St
Expected Duration: 19 Apr 2024 - 29 Apr 2024
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
End to Hawthorne Av
Expected Duration: 29 Apr 2024 - 31 May 2024
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Hyde Av to Logan Av
Expected Duration: 26 Apr 2024 - 26 Apr 2024
Southbound curb lane, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
William Av to James Av
Expected Duration: 18 Mar 2024 - 17 May 2024
West side sidewalk, closed for building construction/maintenance.
Ramp Dunkirk SB to Kingston EB to Ramp Kingston to Dunkirk NB
Expected Duration: 24 Apr 2024 - 03 May 2024
Complete closure of all eastbound lanes, closed for street construction/maintenance.
At Cropo By
Expected Duration: 25 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Paterson St to East Mint Pl
Expected Duration: 26 Apr 2024 - 24 May 2024
Southbound median lane, closed for water work.
Paterson St to East Mint Pl
Expected Duration: 01 Apr 2024 - 26 Apr 2024
Southbound curb lane, closed for water work.
Cumberland Av to Sargent Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Cochrane St to St Cross St
Expected Duration: 16 Apr 2024 - 19 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Day St to Wabasha St
Expected Duration: 22 Apr 2024 - 24 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for electrical/lighting/signals work.
Logan Av to Henry Av
Expected Duration: 24 Apr 2024 - 26 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Aikins St to Salter St
Expected Duration: 23 Apr 2024 - 27 Apr 2024
Westbound curb lane, closed for loading/unloading.
Westminster Av to Wolseley Av
Expected Duration: 20 Apr 2024 - 10 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for water work.
Pacific Av to Disraeli Fw
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Rupert Av to Elgin Av
Expected Duration: 23 Apr 2024 - 06 May 2024
Northbound curb lane, southbound curb lane, east side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Academy Rd to Kingsway
Expected Duration: 15 Apr 2024 - 10 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for water work.
Olive St to Whytewold Rd
Expected Duration: 26 Apr 2024 - 26 Apr 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Princess St to King St
Expected Duration: 09 May 2024 - 09 May 2024
Eastbound curb lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Main St to Rorie St
Expected Duration: 15 Apr 2024 - 03 May 2024
Eastbound curb lane, closed for building construction/maintenance.
Eaglewood Dr to Finchfield Ct
Expected Duration: 05 May 2024 - 06 May 2024
Eastbound curb lane, south side sidewalk, closed for film production or special event/festival.
Monck Av to Claremont Av
Expected Duration: 15 Apr 2024 - 06 May 2024
Back lane/public lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Mortimer Pl to St Cross St
Expected Duration: 08 Apr 2024 - 26 Apr 2024
Eastbound curb lane, closed for water work.
Salter St to Aikins St
Expected Duration: 23 May 2023 - 24 Nov 2024
Eastbound curb lane, closed for building construction/maintenance.
Shaughnessy St to McNichol St
Expected Duration: 24 Apr 2024 - 26 Apr 2024
Westbound curb lane, closed for sewer work.
Logan Av to Higgins Av
Expected Duration: 20 Oct 2023 - 20 Oct 2024
Back lane/public lane, closed for building construction/maintenance.
Main St to Mayfair Av
Expected Duration: 03 May 2024 - 03 May 2024
Southbound median lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Mayfair Av to Main St
Expected Duration: 01 May 2024 09:00 a.m. - 01 May 2024 12:00 p.m.
Southbound curb lane, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Queen Elizabeth Way to Main St
Expected Duration: 01 May 2024 12:30 p.m. - 01 May 2024 03:00 p.m.
Northbound curb lane, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Leila Av to Roshni By
Expected Duration: 24 Apr 2024 - 30 Apr 2024
Southbound curb lane, closed for communications work.
Tache Av to Kenny St
Expected Duration: 06 May 2024 - 06 May 2024
Eastbound curb lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Alexander Av to Disraeli Fw
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Logan Av to Austin St
Expected Duration: 01 May 2024 - 01 May 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance.
Gateway Rd to Grey St
Expected Duration: 12 Apr 2024 - 06 May 2024
South side sidewalk, closed for water work.
Portage Av to Broadway
Expected Duration: 10 Jul 2023 - 01 Dec 2025
West side sidewalk, closed for building construction/maintenance.
Westminster Av to Wolseley Av
Expected Duration: 16 Apr 2024 - 29 Apr 2024
Back lane/public lane, closed for street construction/maintenance.
Harkness St to Queen Elizabeth Way
Expected Duration: 25 Apr 2024 - 26 Apr 2024
Eastbound median lane, north side sidewalk, closed for loading/unloading.
Harkness St to Queen Elizabeth Way
Expected Duration: 29 Apr 2024 - 02 May 2024
Eastbound median lane, north side sidewalk, closed for loading/unloading.
Post St to Kenaston Bv
Expected Duration: 26 Apr 2024 - 31 May 2024
Eastbound median lane, closed for sewer work.
Semple Av to Partridge Av
Expected Duration: 08 Jan 2024 - 14 Jun 2024
Complete closure of all northbound lanes, closed for sewer work.
Sargent Av to Cumberland Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Back lane/public lane, west side sidewalk, closed for street construction/maintenance.
At Hatcher Rd
Expected Duration: 30 Apr 2024 - 17 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Pacific Av to Elgin Av
Expected Duration: 25 Apr 2024 - 25 Apr 2024
Northbound curb lane, southbound curb lane, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
York Av to Broadway
Expected Duration: 06 May 2024 - 26 Jul 2024
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Dublin Av to Saskatchewan Av
Expected Duration: 06 May 2024 - 31 Jul 2024
Complete closure of all southbound lanes, closed for street construction/maintenance.
Panet Rd to Dawson Rd N
Expected Duration: 26 Apr 2024 09:00 a.m. - 24 May 2024 03:00 p.m.
Westbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Antrim Rd to Tu Pelo Av
Expected Duration: 29 Apr 2024 - 17 May 2024
Southbound curb lane, closed for water work. Lanes will be open for morning and afternoon rush hours.
Grosvenor Av to Corydon Av
Expected Duration: 24 Mar 2024 - 03 May 2024
West side sidewalk, closed for water work.
Kingsway to Academy Rd
Expected Duration: 30 Mar 2024 - 29 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for water work.
Mathers Av to Grant Av
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for street construction/maintenance.
At Charleswood Bridge
Expected Duration: 05 May 2024 - 05 May 2024
Southbound curb lane, northbound curb lane, closed for film production or special event/festival.
At Charleswood Bridge
Expected Duration: 05 May 2024 - 05 May 2024
Southbound curb lane, northbound curb lane, closed for film production or special event/festival.
Portage Av to Lodge Av
Expected Duration: 27 Apr 2024 - 27 Apr 2024
Northbound median lane, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Taylor Av to Hector Av
Expected Duration: 08 Apr 2024 - 10 May 2024
Northbound median lane, southbound median lane, east side sidewalk, closed for sewer work.
Berry St to Marjorie St
Expected Duration: 25 Apr 2024 09:00 a.m. - 07 May 2024 03:00 p.m.
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Ferry Rd to Roseberry St
Expected Duration: 01 May 2024 09:00 a.m. - 03 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Marjorie St to Roseberry St
Expected Duration: 29 Apr 2024 09:00 a.m. - 30 Apr 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Overdale St to Albany St
Expected Duration: 24 Apr 2024 09:00 a.m. - 30 Apr 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Sackville St to Ferry Rd
Expected Duration: 24 Apr 2024 09:00 a.m. - 30 Apr 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Academy Rd to Wellington Cr
Expected Duration: 23 Mar 2024 - 29 Apr 2024
East side sidewalk, closed for water work.
Genthon St to Braemar Av
Expected Duration: 06 May 2024 - 08 May 2024
Complete closure of all westbound lanes, complete closure of all eastbound lanes, north side sidewalk, closed for sewer work.
Betsworth Av to Barbara Cr
Expected Duration: 24 Apr 2024 - 25 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Beverley St to Toronto St
Expected Duration: 24 Apr 2024 - 06 May 2024
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Sherburn St to McPhillips St
Expected Duration: 22 Apr 2024 - 31 May 2024
Westbound curb lane, north side sidewalk, closed for water work.
Hatcher Rd to Rougeau Av
Expected Duration: 30 Apr 2024 - 17 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Kingsway to Academy Rd
Expected Duration: 06 Apr 2024 - 29 Apr 2024
Northbound curb lane, closed for water work.
Roblin Bv to Grant Av
Expected Duration: 22 Apr 2024 - 30 Jun 2025
Change in parking restrictions due to building construction. No lane closures.
Portage Av to Assiniboine Cr
Expected Duration: 05 May 2024 - 05 May 2024
Southbound curb lane, closed for film production or special event/festival.
Baltimore Rd to Rathgar Av
Expected Duration: 30 Apr 2024 - 30 Apr 2024
Northbound curb lane, closed for film production or special event/festival.
Gertrude Av to McMillan Av
Expected Duration: 20 Apr 2023 - 01 Jun 2024
West side sidewalk, closed for building construction/maintenance.
Gertrude Av to McMillan Av
Expected Duration: 21 Oct 2022 06:00 a.m. - 01 Jun 2024 03:00 p.m.
Southbound curb lane, west side sidewalk, closed for loading/unloading. Lanes will be open for afternoon rush hour.
Wardlaw Av to Stradbrook Av
Expected Duration: 12 Apr 2023 - 01 Jun 2024
East side sidewalk, closed for building construction/maintenance.
Broadway to York Av
Expected Duration: 06 May 2024 - 26 Jul 2024
Northbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Wellington Cr to Academy Rd
Expected Duration: 15 Apr 2024 - 10 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for water work.
Weston St to McPhillips St
Expected Duration: 25 Apr 2024 - 06 May 2024
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Kimberly Av to Concordia Av
Expected Duration: 26 Apr 2024 - 26 Apr 2024
Complete closure of all southbound lanes, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Winston Rd to Assiniboine Av
Expected Duration: 05 May 2024 - 05 May 2024
Southbound curb lane, closed for film production or special event/festival.
Assiniboine Park Dr to Conservatory Dr
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Westbound curb lane, closed for film production or special event/festival.
Bison Dr to Bairdmore Bv
Expected Duration: 19 Sep 2022 - 31 May 2024
West side sidewalk, closed for building construction/maintenance.
De Vos Rd to Killarney Av
Expected Duration: 06 May 2024 - 10 May 2024
Northbound curb lane, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Howard Av to Clarence Av
Expected Duration: 29 Apr 2024 09:00 a.m. - 29 Apr 2024 03:00 p.m.
Southbound curb lane, west side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Kirkbridge Dr to De Vos Rd
Expected Duration: 29 Apr 2024 09:00 a.m. - 03 May 2024 03:00 p.m.
Southbound curb lane, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Kirkdale St to Walmer St
Expected Duration: 16 Apr 2024 - 06 May 2024
Back lane/public lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Assiniboine Cr to Moray St
Expected Duration: 05 May 2024 - 05 May 2024
Northbound curb lane, closed for film production or special event/festival.
Assiniboine Cr to Sharp Bv
Expected Duration: 10 Apr 2024 - 30 Apr 2024
Eastbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Harris Bv to Oakdean Bv
Expected Duration: 26 Apr 2024 09:00 a.m. - 10 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Kintyre St to St James St
Expected Duration: 11 Apr 2024 09:00 a.m. - 29 Apr 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Main St to Notre Dame Av
Expected Duration: 05 May 2024 09:00 a.m. - 05 May 2024 03:00 p.m.
Westbound curb lane, westbound middle lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
McGee St to Huntleigh St
Expected Duration: 29 Jul 2020 - 30 Jun 2024
North side sidewalk, closed for building construction/maintenance.
Olive St to Douglas Park Rd
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Eastbound curb lane, eastbound middle lane, closed for film production or special event/festival.
Sharp Bv to Duffield St
Expected Duration: 03 Aug 2023 - 30 Nov 2024
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Woodhaven Bv to Moray St
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Eastbound curb lane, eastbound middle lane, closed for film production or special event/festival.
Woodhaven Bv to Olive St
Expected Duration: 30 Apr 2024 - 17 May 2024
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Main St to Westbrook St
Expected Duration: 23 Oct 2023 - 31 May 2024
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
At Burrows Av
Expected Duration: 19 Aug 2021 - 30 Sep 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
James Av to William Av
Expected Duration: 23 Feb 2024 - 03 May 2024
East side sidewalk, closed for building construction/maintenance.
Logan Av to Alexander Av
Expected Duration: 09 May 2024 - 09 May 2024
Southbound median lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
William Av to Bannatyne Av
Expected Duration: 30 Apr 2024 09:00 a.m. - 30 Apr 2024 11:59 p.m.
Southbound median lane, closed for film production or special event/festival. Lanes will be open for morning and afternoon rush hours.
Tache Av to St Joseph St
Expected Duration: 02 Jan 2024 - 30 Aug 2024
South side sidewalk, closed for street construction/maintenance.
Academy Rd to Kingsway
Expected Duration: 15 Mar 2024 - 29 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for water work.
Grant Av to Queenston By
Expected Duration: 29 Apr 2024 - 31 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for sewer work.
Wellington Cr to Academy Rd
Expected Duration: 29 Apr 2024 - 01 May 2024
Southbound curb lane, closed for building construction/maintenance.
At Atwood St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Eastbound curb lane, closed for communications work.
Owen St to Bradley St
Expected Duration: 29 Apr 2024 - 07 May 2024
Eastbound median lane, eastbound curb lane, eastbound middle lane, westbound median lane, westbound middle lane, south side sidewalk, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Rougeau Av to Starlight Dr
Expected Duration: 26 Apr 2024 09:00 a.m. - 01 May 2024 03:00 p.m.
Eastbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Clarke St to Bryce St
Expected Duration: 01 May 2024 09:00 a.m. - 19 May 2024 03:00 p.m.
Westbound median lane, westbound middle lane 2, westbound middle lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Pulford St to Osborne St
Expected Duration: 01 May 2024 - 04 May 2024
Westbound curb lane, closed for film production or special event/festival.
At Portage Av
Expected Duration: 05 May 2024 - 05 May 2024
Northbound curb lane, closed for film production or special event/festival.
McLean St to Elmhurst Rd
Expected Duration: 01 Apr 2024 - 27 Apr 2024
South side sidewalk, closed for building construction/maintenance.
Paradise Dr to Willow Ridge Rd
Expected Duration: 04 Apr 2024 09:00 a.m. - 29 Apr 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Argue St to Lilac St
Expected Duration: 14 Apr 2024 - 06 May 2024
Back lane/public lane, closed for sewer work.
Bournais Dr to Hatcher Rd
Expected Duration: 30 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Powers St to McGregor St
Expected Duration: 15 Apr 2024 - 10 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Des Hivernants Bv to Blue Sun Dr
Expected Duration: 21 Sep 2023 - 01 May 2025
North side sidewalk, closed for building construction/maintenance.
Leila Av to Cork Av
Expected Duration: 22 Apr 2024 - 31 May 2024
Northbound curb lane, east side sidewalk, closed for water work.
Erin St to Empress St
Expected Duration: 01 May 2024 - 03 May 2024
Eastbound median lane, eastbound curb lane, westbound curb lane, westbound median lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Furby St to Sherbrook St
Expected Duration: 06 May 2024 - 31 Aug 2024
Back lane/public lane, closed for street construction/maintenance.
Langside St to Furby St
Expected Duration: 06 May 2024 - 31 Aug 2024
Westbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Sanford St to Strathcona St
Expected Duration: 26 Apr 2024 - 26 Apr 2024
Eastbound curb lane, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Wall St to Empress St
Expected Duration: 22 Apr 2024 09:00 a.m. - 10 May 2024 03:00 p.m.
Eastbound curb lane, eastbound middle lane, westbound curb lane, westbound middle lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Midland St to Empress St
Expected Duration: 06 May 2024 - 31 Jul 2024
Complete closure of all westbound lanes, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Armstrong Av to Newton Av
Expected Duration: 24 Apr 2024 - 17 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for water work.
Wilton St to Stafford St
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for street construction/maintenance.
Logan Av to Alexander Av
Expected Duration: 18 Mar 2024 - 29 Apr 2024
Northbound shoulder lane, closed for water work.
At Hatcher Rd
Expected Duration: 30 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Flora Pl to Stella Av
Expected Duration: 21 Nov 2022 - 31 Jul 2024
Northbound curb lane, closed for building construction/maintenance.
At Jewett By
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all southbound lanes, complete closure of all northbound lanes, east side sidewalk, closed for street construction/maintenance.
Highpark Dr to Eaglewood Dr
Expected Duration: 06 May 2024 - 06 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, closed for film production or special event/festival.
Ellice Av to Notre Dame Av
Expected Duration: 29 Apr 2024 - 05 May 2024
Northbound median lane, closed for film production or special event/festival.
Navy Wy to Broadway
Expected Duration: 29 Apr 2024 - 06 May 2024
Northbound middle lane 2, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Portage Av to Wolseley Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Southbound curb lane, closed for street construction/maintenance.
Hindley Av to Worthington Av
Expected Duration: 18 Mar 2024 - 03 May 2024
East side sidewalk, closed for building construction/maintenance.
Lepine Av to Allard Av
Expected Duration: 01 May 2024 - 13 May 2024
Northbound curb lane, east side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Cathedral Av to Machray Av
Expected Duration: 30 Apr 2024 - 30 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for water work.
Portage Av to Richmond Wy
Expected Duration: 11 Apr 2024 09:00 a.m. - 29 Apr 2024 03:00 p.m.
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Carlton St to Edmonton St
Expected Duration: 09 Jul 2018 - 01 Sep 2024
Westbound curb lane, westbound painted bike lane, north side sidewalk, closed for building construction/maintenance.
Kennedy St to Vaughan St
Expected Duration: 11 Apr 2023 - 30 Apr 2024
South side sidewalk, closed for building construction/maintenance.
Kennedy St to Vaughan St
Expected Duration: 06 Oct 2023 - 30 Apr 2024
Westbound median lane, closed for building construction/maintenance.
Burland Av to Frobisher Rd
Expected Duration: 01 Apr 2024 09:00 a.m. - 30 Apr 2024 03:00 p.m.
Southbound curb lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Morier Av to Vivian Av
Expected Duration: 25 Mar 2024 - 30 Apr 2024
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
Allard Av to Portage Av
Expected Duration: 29 Apr 2024 - 30 Apr 2024
Northbound curb lane, east side sidewalk, closed for film production or special event/festival.
At Hamilton Av
Expected Duration: 15 Apr 2024 - 17 Apr 2024
Northbound curb lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Hickory Wood Pl to Robson St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Eastbound curb lane, closed for communications work.
Donald St to Harkness Av
Expected Duration: 25 Sep 2023 - 30 Jun 2024
Back lane/public lane, south side sidewalk, closed for building construction/maintenance.
Dollard Bv to Access Rd
Expected Duration: 01 Jun 2022 - 31 Jul 2024
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
Harrow St to Stafford St
Expected Duration: 01 May 2024 - 04 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Poseidon By to Wilton St
Expected Duration: 24 Jul 2023 - 30 Jun 2024
Westbound curb lane, westbound median lane, eastbound curb lane, eastbound median lane, closed for sewer work.
Logan Av to Alexander Av
Expected Duration: 25 Mar 2024 - 03 May 2024
West side sidewalk, closed for water work.
Enfield Cr to Kitson St
Expected Duration: 17 Mar 2024 - 29 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for water work.
Allegheny Dr to Dalhousie Dr
Expected Duration: 30 Apr 2024 - 30 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Portage Av to St Matthews Av
Expected Duration: 17 Apr 2024 - 22 Apr 2024
Back lane/public lane, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Ashworth St to Gascon Rd
Expected Duration: 25 Apr 2024 - 29 Apr 2024
Westbound curb lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Donald St to Scott St
Expected Duration: 11 Sep 2023 - 26 Jul 2024
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Osborne St to Scott St
Expected Duration: 24 Jun 2022 - 01 Jun 2024
North side sidewalk, closed for building construction/maintenance.
Pacific Av to Heaton Av
Expected Duration: 26 Apr 2024 - 27 Apr 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, east side sidewalk, closed for film production or special event/festival.
Grosvenor Av to Corydon Av
Expected Duration: 23 Apr 2024 - 12 May 2024
Back lane/public lane, closed for sewer work.
Thames Av to Chalmers Av
Expected Duration: 06 Oct 2023 - 30 Nov 2024
East side sidewalk, closed for building construction/maintenance.
Thames Av to Chalmers Av
Expected Duration: 23 Aug 2023 - 29 Nov 2024
Northbound curb lane, east side sidewalk, closed for loading/unloading. Lanes will be open for morning and afternoon rush hours.
Elm St to Park Bv N
Expected Duration: 05 May 2024 06:00 a.m. - 05 May 2024 01:00 p.m.
Westbound curb lane, closed for film production or special event/festival.
Main St to King St
Expected Duration: 02 May 2024 - 02 May 2024
Westbound curb lane, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Main St to Westbrook St
Expected Duration: 04 May 2024 - 05 May 2024
Eastbound curb lane, eastbound middle lane, eastbound painted bike lane, south side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Rose Lake Ct to Cherrywood Rd
Expected Duration: 05 May 2024 - 09 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for film production or special event/festival.
Tylehurst St to St James St
Expected Duration: 05 May 2024 - 05 May 2024
Westbound curb lane, closed for film production or special event/festival.
Portage Av to Assiniboine Av
Expected Duration: 05 May 2024 - 05 May 2024
Southbound curb lane, closed for film production or special event/festival.
Millfield Dr to Minnetonka St
Expected Duration: 30 Mar 2024 - 29 Apr 2024
Westbound median lane, closed for sewer work.
Lodge Av to Bruce Av
Expected Duration: 24 Apr 2024 - 26 Apr 2024
Southbound median lane, west side sidewalk, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Marlene St to St Annes Rd
Expected Duration: 24 Apr 2024 - 30 Apr 2024
Westbound curb lane, closed for sewer work.
Ellice Av to Portage Av
Expected Duration: 08 Dec 2022 - 01 Jun 2024
Northbound median lane, west side sidewalk, closed for building construction/maintenance.