Academy Rd Eastbound View Map |
Updated 20 Jan 2021 10:04 AM |
Waterloo St to Ash St |
Expected Duration: 10 Nov 2020 - 26 Feb 2021
|
Back lane/Public lane closed for building construction/maintenance. |
|
Academy Rd Eastbound View Map |
Updated 25 Feb 2021 10:27 AM |
Waterloo St to Ash St |
Expected Duration: 27 Feb 2021 - 27 Mar 2021
|
Back lane/Public lane closed for building construction/maintenance. |
  |
Alexander Av Southbound |
Updated 02 Feb 2021 03:31 PM |
Waterfront Dr to Lily St |
Expected Duration: 04 Feb 2021 - 30 Apr 2021
|
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
  |
Alloway Av Westbound |
Updated 22 Feb 2021 02:14 PM |
Maryland St to End |
Expected Duration: 26 Feb 2021 - 26 Feb 2021
|
Westbound curb lane closed for Sewer work. |
  |
Amy St Northbound |
Updated 22 Oct 2020 01:54 PM |
James Av to Rupert Av |
Expected Duration: 26 Oct 2020 - 30 Dec 2021
|
Northbound curb lane, East Sidewalk closed for building construction/maintenance. |
  |
Archibald St Northbound View Map |
|
Kavanagh St to Messier St |
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
|
Northbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods. |
|
Archibald St Northbound View Map |
|
Plinguet St to Tissot St |
Expected Duration: 01 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
|
Northbound curb lane, East Sidewalk closed for Gas work Traffic lane(s) will re-open for weekday peak periods. |
    |
Bannatyne Av Westbound |
|
Rorie St to Main St |
Expected Duration: 08 Jan 2021 - 28 Mar 2021
|
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
  |
Beghin Av Northbound & Southbound |
|
Dugald Rd to Durand Rd |
Expected Duration: 23 Feb 2021 - 26 Feb 2021
|
Single lanes closed for Communications (Phone, Cable, Internet) work. |
  |
Bell Av Westbound |
Updated 11 Feb 2021 12:37 PM |
Donald St to Clarke St |
Expected Duration: 15 Feb 2021 - 24 Sep 2021
|
Westbound curb lane, North Sidewalk closed for building construction/maintenance. |
  |
Broadway Af Eastbound View Map |
|
Kennedy St to Edmonton St |
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
|
Eastbound median lane closed for Gas work Traffic lane(s) will re-open for weekday peak periods. |
|
Broadway Af Eastbound View Map |
|
Maryland St to Sherbrook St |
Expected Duration: 05 Mar 2021 - 07 Mar 2021
|
Eastbound curb lane, South Sidewalk closed for Communications (Phone, Cable, Internet) work. |
|
Broadway Af Eastbound View Map |
|
Sherbrook St to Furby St |
Expected Duration: 26 Feb 2021 - 28 Feb 2021
|
Eastbound median lane closed for Communications (Phone, Cable, Internet) work. |
    |
Campeau St Southbound |
|
St Therese Av to End |
Expected Duration: 02 Mar 2021 - 15 Mar 2021
|
Southbound curb lane closed for Sewer work. |
  |
Carlton St Southbound View Map |
Updated 23 Feb 2021 10:58 AM |
Cumberland Av to Qu'Appelle Av |
Expected Duration: 09 Mar 2021 - 09 Mar 2021 03:00 PM
|
ONE WAY STREET Left side curb lane closed for building construction/maintenance. |
|
Carlton St Southbound View Map |
Updated 16 Dec 2020 01:30 PM |
Graham Av to St Mary Av |
Expected Duration: 09 Jul 2018 - 01 Sep 2023
|
West side sidewalk closed for building construction. |
|
Carlton St Southbound View Map |
Updated 16 Dec 2020 10:24 AM |
Graham Av to St Mary Av |
Expected Duration: 21 Dec 2020 - 15 Apr 2023
|
Painted Bicycle lane, ONE WAY STREET Right side curb lane, West Sidewalk, rear lane closed for building construction/maintenance. |
  |
Century St Northbound View Map |
|
Silver Av to St Matthews Av |
Expected Duration: 27 Feb 2021 - 05 Mar 2021
|
Northbound curb lane closed for water work. |
|
Century St Southbound View Map |
|
St Matthews Av to Silver Av |
Expected Duration: 21 Feb 2021 - 03 Mar 2021
|
Southbound curb lane, Southbound middle lane closed for water work. |
    |
Day St Northbound View Map |
Updated 19 Feb 2021 09:48 AM |
Pandora Av E to Melrose Av E |
Expected Duration: 07 Mar 2021 07:00 AM - 07 Mar 2021 11:00 PM
|
Northbound direction will be completely closed, Back lane/Public lane also closed for Communications (Phone, Cable, Internet) work. |
  |
Des Hivernants Bv Northbound |
|
Sage Cr Bv to Dr David Friesen Dr |
Expected Duration: 08 Mar 2021 - 12 Mar 2021
|
NB will be completely closed to all traffic due to water work. |
  |
Donald St Southbound View Map |
|
Portage Av to Graham Av |
Expected Duration: 05 Mar 2021 - 05 Mar 2021 07:00 AM
|
ONE WAY STREET Right side curb lane, ONE WAY STREET Middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Ducharme Av Westbound |
Updated 26 Feb 2021 10:59 AM |
Pembina Hw to Villeneuve Bv |
Expected Duration: 01 Feb 2021 - 05 Mar 2021
|
Westbound curb lane closed for building construction/maintenance. |
  |
Dufferin Av Westbound |
|
Parr St to Arlington St |
Expected Duration: 25 Feb 2021 09:00 AM - 04 Mar 2021 03:00 PM
|
Westbound curb lane closed for Gas work |
  |
Dugald Rd Eastbound & Westbound View Map |
Updated 25 Feb 2021 07:35 AM |
Beghin Av to Guy Savoie Dr |
Expected Duration: 24 Feb 2021 - 03 Mar 2021
|
South Sidewalk, Shoulder of roadway closed for Communications (Phone, Cable, Internet) work. No Traffic lanes will be closed. Only sidewalks will be closed |
  |
Dunlop Av Southbound |
Updated 19 Feb 2021 08:46 AM |
Inkster Bv to Hutchings St |
Expected Duration: 04 Feb 2021 - 26 Feb 2021
|
Southbound curb lane closed for Communications (Phone, Cable, Internet) work. |
    |
Ebby Av Westbound |
Updated 18 Feb 2021 10:15 AM |
Pembina Hw to End |
Expected Duration: 22 Feb 2021 - 26 Mar 2021
|
Westbound curb lane closed for Sewer work. |
|
Ebby Av Eastbound & Westbound |
Updated 16 Feb 2021 09:57 AM |
Wentworth St to Lilac St |
Expected Duration: 22 Jan 2021 - 12 Mar 2021
|
Complete closure of entire street for Sewer work. |
  |
Edison Av Eastbound |
Updated 25 Feb 2021 11:55 AM |
Roch St to Rothesay St |
Expected Duration: 22 Feb 2021 - 05 Mar 2021
|
Eastbound curb lane closed for Sewer work. |
  |
Edmonton St Northbound View Map |
Updated 26 Feb 2021 10:21 AM |
St Mary Av to Graham Av |
Expected Duration: 02 Feb 2021 - 05 Mar 2021
|
East side curb lane and sidewalk closed for building construction/maintenance. |
|
Edmonton St Northbound View Map |
Updated 25 Feb 2021 08:40 AM |
St Mary Av to Graham Av |
Expected Duration: 02 Mar 2021 07:00 PM - 03 Mar 2021 02:00 AM
|
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Egerton Rd Southbound |
Updated 26 Feb 2021 09:09 AM |
Humboldt Av to Handyside Av |
Expected Duration: 10 Feb 2021 - 02 Mar 2021
|
Southbound curb lane closed for Sewer work. |
  |
Elmhurst Rd Northbound & Southbound |
|
Ridgewood Av to Newhaven Av |
Expected Duration: 01 Mar 2021 08:00 AM - 03 Mar 2021 06:00 PM
|
Complete closure of entire street for sewer work. |
    |
Ferry Rd Northbound & Southbound |
|
Assiniboine Av to Portage Av |
Expected Duration: 08 Feb 2021 - 16 Apr 2021
|
Southbound curb lane closed for Sewer work. |
|
Ferry Rd Southbound View Map |
|
Silver Av to Ness Av |
Expected Duration: 03 Mar 2021 - 05 Mar 2021
|
Southbound middle lane closed for Sewer work. |
  |
Fort St Northbound |
Updated 24 Feb 2021 02:31 PM |
Assiniboine Av to Broadway Af |
Expected Duration: 01 Mar 2021 - 02 Mar 2021
|
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
|
Fort St Northbound View Map |
Updated 26 Jun 2020 09:57 AM |
Graham Av to Portage Av |
Expected Duration: 05 Dec 2018 - 02 Jun 2022
|
East side curb lane and bike lane closed for construction. |
    |
Garry St Southbound View Map |
Updated 01 Feb 2021 11:47 AM |
Ellice Av to Portage Av |
Expected Duration: 14 Dec 2020 - 31 Mar 2021
|
West sidewalk closed for COVID19 testing site queueing. |
|
Garry St Southbound View Map |
|
Graham Av to York Av |
Expected Duration: 04 Mar 2021 07:00 PM - 05 Mar 2021 01:00 AM
|
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Good St Southbound |
|
St Mary Av to Broadway Af |
Expected Duration: 28 Oct 2020 - 15 Mar 2021
|
Southbound curb lane, West Sidewalk closed for building construction/maintenance. |
  |
Graham Av Eastbound View Map |
Updated 16 Dec 2020 10:25 AM |
Edmonton St to Carlton St |
Expected Duration: 21 Dec 2020 07:00 AM - 15 Apr 2023 05:00 PM
|
EB Graham will be closed to all traffic except Winnipeg Transit due to building construction. |
|
Graham Av Eastbound & Westbound View Map |
Updated 15 Jul 2020 02:50 PM |
Main St to Fort St |
Expected Duration: 16 Jul 2018 - 15 Jul 2021
|
Graham will be closed to all traffic except buses due to building construction. |
  |
Grosvenor Av Westbound |
|
Wentworth St to Stafford St |
Expected Duration: 25 Feb 2021 - 01 Aug 2021
|
North Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
  |
Gunn Rd Westbound |
|
Redonda St to Day St |
Expected Duration: 08 Nov 2020 - 12 Mar 2021
|
WB Gunn will be completely closed for sewer work. EB traffic will be maintained. |
    |
Hamilton Av Southbound |
Updated 18 Feb 2021 12:22 PM |
Valley View Pl to Wharton Bv |
Expected Duration: 22 Feb 2021 - 26 Feb 2021
|
Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Hargrave St Northbound View Map |
Updated 24 Feb 2021 02:34 PM |
Broadway Af to York Av |
Expected Duration: 01 Mar 2021 09:00 PM - 02 Mar 2021 06:00 AM
|
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Harvard Av E Eastbound & Westbound |
Updated 26 Feb 2021 02:54 PM |
Leola St to Roanoke St |
Expected Duration: 22 Feb 2021 - 12 Mar 2021
|
Eastbound curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers. |
  |
Hector Av Eastbound & Westbound |
|
Lilac St to Pembina Hw |
Expected Duration: 11 Feb 2021 - 28 Feb 2021
|
Complete closure of entire street for Sewer work. |
  |
Henry Av Eastbound & Westbound |
|
King St to End |
Expected Duration: 03 Mar 2021 07:00 PM - 04 Mar 2021 06:00 AM
|
Complete closure of entire street for sewer work. |
  |
Home St Southbound |
|
Portage Av to Preston Av |
Expected Duration: 22 Feb 2021 - 16 Mar 2021
|
West Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
  |
Hutchings St Southbound |
Updated 19 Feb 2021 08:47 AM |
Dunlop Av to Sheppard St |
Expected Duration: 04 Feb 2021 - 26 Feb 2021
|
Southbound curb lane closed for Communications (Phone, Cable, Internet) work. |
    |
James Av Eastbound & Westbound |
Updated 19 Feb 2021 09:07 AM |
Bertha St to Amy St |
Expected Duration: 23 Feb 2021 - 26 Feb 2021
|
Complete closure of entire street for for building construction/maintenance. |
|
James Av Westbound |
Updated 30 Dec 2020 01:37 PM |
Waterfront Dr to Amy St |
Expected Duration: 26 Oct 2020 - 31 May 2021
|
North Sidewalk closed for building construction/maintenance. |
  |
Juno St Northbound & Southbound |
Updated 05 Feb 2021 11:32 AM |
McDermot Av to Notre Dame Av |
Expected Duration: 22 Feb 2021 - 22 Apr 2021
|
East Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
    |
Kennedy St Northbound View Map |
Updated 18 Jan 2021 10:21 AM |
Ellice Av to Qu'Appelle Av |
Expected Duration: 14 Jun 2020 - 30 Nov 2021
|
East Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed |
|
Kennedy St Southbound View Map |
|
Graham Av to York Av |
Expected Duration: 01 Mar 2021 - 05 Mar 2021
|
ONE WAY STREET Right side curb lane closed for Communications (Phone, Cable, Internet) work. |
  |
King Edward St Southbound View Map |
Updated 01 Feb 2021 11:47 AM |
Sargent Av to St Matthews Av |
Expected Duration: 31 Oct 2020 - 31 Mar 2021
|
Left side curb lane closed for COVID test site queueing. |
  |
King St Northbound View Map |
Updated 25 Feb 2021 01:34 PM |
William Av to James Av |
Expected Duration: 18 Dec 2020 - 18 Mar 2021
|
ONE WAY STREET Right side curb lane, east sidewalk closed for building construction/maintenance. On Feb 27 King will be reduced to one lane between 9-3. |
    |
Lagimodiere Bv Northbound View Map |
|
Fermor Av to Betournay St |
Expected Duration: 01 Mar 2021 - 09 Mar 2021 03:00 PM
|
Northbound curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Lilac St Northbound & Southbound |
Updated 16 Feb 2021 09:55 AM |
Ebby Av to Carter Av |
Expected Duration: 13 Jan 2021 - 12 Mar 2021
|
Lilac will be completely closed for sewer work. |
  |
Logan Av Eastbound & Westbound View Map |
Updated 22 Feb 2021 09:05 AM |
Chambers St to Gwendoline St |
Expected Duration: 10 Mar 2021 - 18 Mar 2021
|
Eastbound median lane, Westbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Lyndale Dr Westbound |
Updated 08 Jan 2021 08:14 AM |
Monck Av to Birchdale Av |
Expected Duration: 12 Jan 2021 - 15 Mar 2021
|
Lyndale will be completely closed for construction. South sidewalk also closed. |
    |
Main St Northbound & Southbound View Map |
|
Benn Av to Fernbank Av |
Expected Duration: 01 Mar 2021 - 05 Mar 2021
|
Shoulders of roadway closed for Communications (Phone, Cable, Internet) work. |
|
Main St Northbound View Map |
|
Broadway Af to York Av |
Expected Duration: 04 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
|
Northbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods. |
|
Main St Northbound View Map |
Updated 26 Feb 2021 10:15 AM |
Manitoba Av to Magnus Av |
Expected Duration: 08 May 2020 - 26 Mar 2021
|
East Sidewalk closed for Building Construction/Maintenance work. |
|
Main St Northbound View Map |
|
McDermot Av to Bannatyne Av |
Expected Duration: 08 Jan 2021 - 28 Mar 2021
|
East Sidewalk closed for overhead crane work. No Traffic lanes will be closed. Only sidewalks will be closed |
|
Main St Southbound View Map |
Updated 09 Feb 2021 02:49 PM |
Pioneer Av to Graham Av |
Expected Duration: 29 Jun 2020 - 04 Mar 2021
|
SB curb lane & West Sidewalk closed for Street Construction/Maintenance work. |
|
Main St Northbound View Map |
Updated 23 Feb 2021 10:28 AM |
Selkirk Av to Manitoba Av |
Expected Duration: 02 Mar 2021 - 29 Mar 2021
|
Northbound 2 middle lanes closed for Electrical work. |
  |
Maryland St Southbound View Map |
|
Sara Av to Purcell Av |
Expected Duration: 26 Feb 2021 09:00 AM - 26 Feb 2021 03:00 PM
|
Southbound curb lane, Southbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
McDermot Av Eastbound |
|
Kate St to Juno St |
Expected Duration: 22 Feb 2021 - 22 Apr 2021
|
South sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
|
McDermot Av Eastbound |
Updated 19 Feb 2021 03:14 PM |
Sherbrook St to Furby St |
Expected Duration: 17 Feb 2021 - 26 Feb 2021
|
ONE WAY STREET Left side curb lane closed for building construction/maintenance. |
|
McDermot Av Eastbound |
|
Tecumseh St to Emily St |
Expected Duration: 03 Mar 2021 - 04 Mar 2021
|
Eastbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
McKenzie St Northbound & Southbound |
|
Kilbride Av to Burrin Av |
Expected Duration: 07 Aug 2020 - 25 Jul 2021
|
Complete closure of entire street for sewer work. |
  |
McPhillips St Southbound View Map |
|
Swailes Av to Templeton Av |
Expected Duration: 02 Mar 2021 09:00 AM - 16 Mar 2021 03:00 PM
|
Southbound curb lane, West Sidewalk closed for Gas work Traffic lane(s) will re-open for weekday peak periods. |
  |
Memorial Bv Northbound View Map |
|
St Mary Av to Portage Av |
Expected Duration: 03 Mar 2021 - 03 Mar 2021 07:00 AM
|
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Midtown Bridge Southbound View Map |
|
Donald St to Donald St |
Expected Duration: 02 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
|
Southbound curb lane closed for bridge work/maintenance. Traffic lane(s) will re-open for weekday peak periods. |
  |
Morrow Av Westbound |
|
End to St Annes Rd |
Expected Duration: 08 Mar 2021 - 15 Mar 2021
|
Westbound curb lane closed for Sewer work. |
    |
Nairn Av Eastbound View Map |
Updated 01 Feb 2021 11:48 AM |
Keenleyside St to Stapleton St |
Expected Duration: 12 Oct 2020 - 31 Mar 2021
|
Curb lane closed for Public Works. |
  |
Nairn Av Overpass Westbound View Map |
|
Grey St to Watt St |
Expected Duration: 02 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
|
Westbound curb lane closed for bridge work/maintenance. Traffic lane(s) will re-open for weekday peak periods. |
  |
Ness Av Eastbound View Map |
|
Mount Royal Rd to Sharp Bv |
Expected Duration: 03 Mar 2021 - 31 Mar 2021
|
Ness will be reduced to one lane per direction. closed for Electrical work. |
|
Ness Av Eastbound View Map |
|
Mount Royal Rd to Sharp Bv |
Expected Duration: 25 Feb 2021 - 26 Feb 2021
|
Eastbound curb lane, East Sidewalk closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods. |
|
Ness Av Eastbound & Westbound View Map |
Updated 21 Dec 2020 01:33 PM |
Whytewold Rd to Mount Royal Rd |
Expected Duration: 08 Feb 2021 - 12 Mar 2021
|
Ness will be reduced to one lane per direction due to hydro work. |
  |
Notre Dame Av Westbound View Map |
|
Flint St to Cecil St |
Expected Duration: 22 Feb 2021 09:00 AM - 28 Feb 2021 03:00 PM
|
Westbound curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods. |
|
Notre Dame Av Westbound View Map |
|
Furby St to Pearl St |
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
|
North side curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods. |
|
Notre Dame Av Eastbound View Map |
|
Lipton St to Banning St |
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
|
Eastbound curb lane closed for Street Construction/Maintenance work. Traffic lane(s) will re-open for weekday peak periods. |
|
Notre Dame Av Westbound View Map |
|
Spence St to Young St |
Expected Duration: 24 Feb 2021 - 26 Feb 2021
|
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
|
Notre Dame Av Eastbound & Westbound View Map |
Updated 26 Feb 2021 07:35 AM |
St James St to Bannatyne Av W |
Expected Duration: 23 Feb 2021 09:00 AM - 03 Mar 2021 03:00 PM
|
Eastbound curb lane, Westbound curb lane, South Sidewalk closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods. |
    |
Osborne St Northbound View Map |
Updated 05 Aug 2020 08:51 AM |
Don Av to Mulvey Av |
Expected Duration: 13 May 2019 09:00 AM - 31 May 2021 03:00 PM
|
East sidewalk will be closed full time for building construction. |
|
Osborne St Southbound View Map |
Updated 10 Feb 2021 09:10 AM |
Mulvey Av to Togo Av |
Expected Duration: 08 Mar 2021 07:00 AM - 14 Mar 2021 03:00 PM
|
Southbound curb lane closed for Sewer work. Lane will reopen for afternoon peak periods. |
    |
Paulin St Northbound & Southbound |
Updated 19 Feb 2021 03:09 PM |
Pacific Av to Ross Av |
Expected Duration: 22 Feb 2021 08:00 AM - 22 Feb 2022 08:00 AM
|
Complete closure of entire street for building construction/maintenance. |
  |
Pembina Hw Southbound View Map |
Updated 19 Nov 2020 11:38 AM |
Bison Dr to Bairdmore Bv |
Expected Duration: 06 Apr 2019 07:00 AM - 30 Jun 2021 03:00 PM
|
SB curb closed for construction. |
|
Pembina Hw Northbound View Map |
|
Dalhousie Dr to Newdale Av |
Expected Duration: 24 Feb 2021 09:00 AM - 26 Feb 2021 03:00 PM
|
Painted Bicycle lane, Northbound curb lane closed for water work. Traffic lane(s) will re-open for weekday peak periods. |
|
Pembina Hw Southbound View Map |
|
Des Trappistes St to Minerva Av |
Expected Duration: 07 Mar 2021 09:00 AM - 15 Mar 2021 03:00 PM
|
Southbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
|
Pembina Hw Northbound & Southbound View Map |
Updated 18 Feb 2021 10:17 AM |
Jackson Av to Hector Av |
Expected Duration: 22 Feb 2021 - 26 Mar 2021
|
Single lanes closed for Sewer work. |
|
Pembina Hw Southbound View Map |
|
Newdale Av to Bairdmore Bv |
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
|
Painted Bicycle lane, Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
|
Pembina Hw Northbound View Map |
Updated 23 Feb 2021 11:12 AM |
Turnbull Dr to De Leglise Av |
Expected Duration: 15 Feb 2021 - 15 Mar 2021
|
Northbound curb lane closed for Sewer work. |
  |
Pioneer Av Westbound View Map |
Updated 15 Feb 2021 12:24 PM |
Westbrook St to Main St |
Expected Duration: 13 Mar 2021 06:00 AM - 14 Mar 2021 08:00 PM
|
South Sidewalk, Complete closure of entire street for building construction/maintenance. |
  |
Portage Av Eastbound View Map |
|
Arlington St to Home St |
Expected Duration: 22 Feb 2021 - 16 Apr 2021
|
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
|
Portage Av Westbound View Map |
Updated 28 Jul 2020 10:03 AM |
McGee St to Huntleigh St |
Expected Duration: 29 Jul 2020 - 29 Jul 2021
|
North Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed |
|
Portage Av Westbound View Map |
|
Smith St to Hargrave St |
Expected Duration: 05 Mar 2021 - 05 Mar 2021 07:00 AM
|
Westbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
Princess St Southbound View Map |
Updated 09 Feb 2021 09:15 AM |
Pacific Av to Rupert Av |
Expected Duration: 14 Aug 2020 - 09 Mar 2021
|
West Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed |
  |
Pritchard Av Westbound |
Updated 25 Feb 2021 01:39 PM |
McGregor St to McKenzie St |
Expected Duration: 01 Mar 2021 - 31 Mar 2021
|
Westbound curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers. |
    |
Redwood Av Eastbound |
|
Parr St to Arlington St |
Expected Duration: 03 Mar 2021 - 05 Mar 2021
|
EB curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers. |
  |
River Av Westbound View Map |
|
Clarke St to Lewis St |
Expected Duration: 02 Mar 2021 09:00 AM - 23 Mar 2021 03:00 PM
|
ONE WAY STREET Right side curb lane, ONE WAY STREET Middle lane, North Sidewalk closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods. |
    |
Scotia St Northbound & Southbound |
|
Kilbride Av to Burrin Av |
Expected Duration: 08 Mar 2021 - 16 Jul 2021
|
Complete closure of entire street for sewer work. |
  |
Sherbrook St Northbound & Southbound View Map |
Updated 17 Feb 2021 08:38 AM |
Alexander Av to Henry Av |
Expected Duration: 13 Mar 2021 - 13 Mar 2021
|
Complete closure of entire street for Sewer work. |
|
Sherbrook St Southbound View Map |
|
McDermot Av to Notre Dame Av |
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
|
Southbound median lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods. |
|
Sherbrook St Northbound View Map |
|
Sara Av to Broadway Af |
Expected Duration: 05 Mar 2021 - 07 Mar 2021 05:00 PM
|
ONE WAY STREET Left side curb lane, West Sidewalk closed for Communications (Phone, Cable, Internet) work. |
|
Sherbrook St Northbound View Map |
Updated 06 Jan 2021 10:56 AM |
Wolseley Av to Westminster Av |
Expected Duration: 17 Dec 2020 08:00 AM - 06 Jan 2022
|
West Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
  |
Smith St Northbound View Map |
Updated 12 Jan 2021 10:41 AM |
York Av to St Mary Av |
Expected Duration: 08 Jul 2019 - 17 Dec 2021
|
East side curb lane and sidewalk closed for building construction. |
  |
South Town Rd Westbound |
|
Centre St to Kenaston Bv |
Expected Duration: 01 Feb 2021 - 26 Jun 2021
|
WB will be completely closed to all traffic due to building construction. |
  |
St Annes Rd Southbound View Map |
|
Oakleigh Pl to Victory Pl |
Expected Duration: 26 Feb 2021 - 05 Mar 2021
|
Southbound curb lane closed for water work. |
  |
St James St Southbound View Map |
|
Bangor Av to Dublin Av |
Expected Duration: 01 Mar 2021 09:00 AM - 01 Mar 2021 03:00 PM
|
Southbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods. |
  |
St Mary Av Westbound View Map |
Updated 16 Dec 2020 01:29 PM |
Carlton St to Edmonton St |
Expected Duration: 09 Jul 2018 - 01 Sep 2023
|
North curb lane closed for building construction. |
|
St Mary Av Westbound View Map |
|
Carlton St to Kennedy St |
Expected Duration: 02 Mar 2021 07:00 PM - 03 Mar 2021 02:00 AM
|
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
|
St Mary Av Southbound View Map |
Updated 05 Feb 2021 03:05 PM |
Edmonton St to Kennedy St |
Expected Duration: 15 Feb 2021 - 26 Feb 2021
|
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
|
St Mary Av Westbound View Map |
Updated 25 Feb 2021 08:47 AM |
Vaughan St to Memorial Bv |
Expected Duration: 03 Mar 2021 - 03 Mar 2021 07:00 AM
|
ONE WAY STREET Right side curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
  |
St Vital Bridge Northbound View Map |
|
Dunkirk Dr to Osborne St |
Expected Duration: 01 Jan 2020 - 21 Dec 2021
|
East sidewalk closed for WWD work. |
  |
Stafford St Southbound View Map |
Updated 14 Jan 2021 12:30 PM |
McMillan Av to Corydon Av |
Expected Duration: 02 Nov 2020 - 28 Feb 2021
|
Southbound curb lane closed for use as pedestrian detour around building construction/maintenance |
|
Stafford St Northbound View Map |
|
Scotland Av to Lorette Av |
Expected Duration: 26 Feb 2021 - 05 Mar 2021
|
Northbound curb lane closed for Street Construction/Maintenance work. |
  |
Stradbrook Av Eastbound View Map |
Updated 26 Feb 2021 10:24 AM |
Wellington Cr to Nassau St N |
Expected Duration: 08 Mar 2021 - 10 Mar 2021
|
ONE WAY STREET Right side curb lane, South Sidewalk closed for water work. |
    |
Talbot Av Westbound |
Updated 11 Feb 2021 10:24 AM |
Allan St to Stadacona St |
Expected Duration: 18 Feb 2021 - 12 Mar 2021
|
Westbound curb lane, South Sidewalk closed for building construction/maintenance. |
  |
Toronto St Southbound |
Updated 10 Feb 2021 08:56 AM |
St Matthews Av to Portage Av |
Expected Duration: 16 Feb 2021 - 31 Oct 2021
|
Southbound curb lane, West Sidewalk closed for building construction/maintenance. |
  |
Transcona Bv Eastbound |
|
Bienvenue St to Plessis Rd |
Expected Duration: 01 Mar 2021 - 02 Apr 2021
|
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed |
|
Transcona Bv Eastbound |
Updated 24 Feb 2021 01:54 PM |
Chelston Gt to Bienvenue St |
Expected Duration: 04 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
|
Eastbound curb lane closed for Street Construction/Maintenance work. Traffic lane(s) will re-open for weekday peak periods. |
    |
University Cr Southbound View Map |
Updated 24 Feb 2021 01:51 PM |
Pembina Hw to Chancellor Matheson Rd |
Expected Duration: 18 Feb 2021 09:00 AM - 04 Mar 2021 03:00 PM
|
Northbound curb lane, Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
    |
Wellington Cr Eastbound & Westbound |
Updated 30 Nov 2020 11:33 AM |
Park Bv N to Doncaster St |
Expected Duration: 07 Dec 2020 - 31 Mar 2021
|
Eastbound curb lane, Westbound curb lane, North Sidewalk closed for Street Construction/Maintenance work. Access to Wellington Cr. from adjacent side streets will be restricted. |
  |
Wentworth St Southbound |
|
Weatherdon Av to Taylor Av |
Expected Duration: 24 Feb 2021 - 01 Jun 2021
|
Southbound curb lane closed for Sewer work. |
  |
Whytewold Rd Northbound & Southbound |
|
At Ness Av |
Expected Duration: 28 Feb 2021 07:00 AM - 28 Feb 2021 07:00 PM
|
Whytewold will be completely closed at Ness due to hydro work. |
  |
William Av Eastbound & Westbound View Map |
|
Tecumseh St to Sherbrook St |
Expected Duration: 05 Mar 2021 - 05 Mar 2021
|
Eastbound median lane, Westbound median lane closed for Sewer work. |
  |
Wolseley Av Westbound |
Updated 06 Jan 2021 10:58 AM |
Sherbrook St to Maryland St |
Expected Duration: 17 Dec 2020 - 06 Jan 2022
|
North Sidewalk and Westbound curb lane closed for building construction/maintenance. |
    |
York Av Eastbound View Map |
|
Carlton St to Donald St |
Expected Duration: 01 Mar 2021 10:00 PM - 02 Mar 2021 06:00 AM
|
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods. |
Page Updated: February 28, 2021 12:00 AM |