Site Accessibility Information Access Key 1 to Skip to Top Navigation Access Key 2 to Skip to the Three One One link Access Key 3 to Skip to City of Winnipeg Main Menu Access Key 4 to Skip to Left Navigation Menu Access Key 5 to Skip to Content area Access Key 6 to Skip to Right Sidebar content area Access Key 7 to Skip to Footer Links
City of Winnipeg
|  Link to the City of Winnipeg French websiteFrançais  |
COVID-19: City of Winnipeg response and latest updates on City facilities and services COVID-19 : Mesures prises par la Ville de Winnipeg et dernières nouvelles sur les installations et services municipaux
Citizens Information Service
Public Works
Accessibility

Regional Street Lane Closures

partially closed      completely closed      upcoming Map Version   Text Version
A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z
Academy_Rd Alexander_Av Alloway_Av Amy_St Archibald_St Bannatyne_Av Beghin_Av Bell_Av Broadway_Af Campeau_St Carlton_St Century_St Day_St Des_Hivernants_Bv Donald_St Ducharme_Av Dufferin_Av Dugald_Rd Dunlop_Av Ebby_Av Edison_Av Edmonton_St Egerton_Rd Elmhurst_Rd Ferry_Rd Fort_St Garry_St Good_St Graham_Av Grosvenor_Av Gunn_Rd Hamilton_Av Hargrave_St Harvard_Av_E Hector_Av Henry_Av Home_St Hutchings_St James_Av Juno_St Kennedy_St King_Edward_St King_St Lagimodiere_Bv Lilac_St Logan_Av Lyndale_Dr Main_St Maryland_St McDermot_Av McKenzie_St McPhillips_St Memorial_Bv Midtown_Bridge Morrow_Av Nairn_Av Nairn_Av_Overpass Ness_Av Notre_Dame_Av Osborne_St Paulin_St Pembina_Hw Pioneer_Av Portage_Av Princess_St Pritchard_Av Redwood_Av River_Av Scotia_St Sherbrook_St Smith_St South_Town_Rd St_Annes_Rd St_James_St St_Mary_Av St_Vital_Bridge Stafford_St Stradbrook_Av Talbot_Av Toronto_St Transcona_Bv University_Cr Wellington_Cr Wentworth_St Whytewold_Rd William_Av Wolseley_Av York_Av
     
Academy Rd Eastbound  View Map Updated 20 Jan 2021 10:04 AM
Waterloo St to Ash St
Expected Duration: 10 Nov 2020 - 26 Feb 2021
Back lane/Public lane closed for building construction/maintenance.
 
Academy Rd Eastbound  View Map Updated 25 Feb 2021 10:27 AM
Waterloo St to Ash St
Expected Duration: 27 Feb 2021 - 27 Mar 2021
Back lane/Public lane closed for building construction/maintenance.
   
Alexander Av Southbound Updated 02 Feb 2021 03:31 PM
Waterfront Dr to Lily St
Expected Duration: 04 Feb 2021 - 30 Apr 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
   
Alloway Av Westbound Updated 22 Feb 2021 02:14 PM
Maryland St to End
Expected Duration: 26 Feb 2021 - 26 Feb 2021
Westbound curb lane closed for Sewer work.
   
Amy St Northbound Updated 22 Oct 2020 01:54 PM
James Av to Rupert Av
Expected Duration: 26 Oct 2020 - 30 Dec 2021
Northbound curb lane, East Sidewalk closed for building construction/maintenance.
   
Archibald St Northbound  View Map  
Kavanagh St to Messier St
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
Northbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.
 
Archibald St Northbound  View Map  
Plinguet St to Tissot St
Expected Duration: 01 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
Northbound curb lane, East Sidewalk closed for Gas work Traffic lane(s) will re-open for weekday peak periods.
     
Bannatyne Av Westbound  
Rorie St to Main St
Expected Duration: 08 Jan 2021 - 28 Mar 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
   
Beghin Av Northbound & Southbound  
Dugald Rd to Durand Rd
Expected Duration: 23 Feb 2021 - 26 Feb 2021
Single lanes closed for Communications (Phone, Cable, Internet) work.
   
Bell Av Westbound Updated 11 Feb 2021 12:37 PM
Donald St to Clarke St
Expected Duration: 15 Feb 2021 - 24 Sep 2021
Westbound curb lane, North Sidewalk closed for building construction/maintenance.
   
Broadway Af Eastbound  View Map  
Kennedy St to Edmonton St
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
Eastbound median lane closed for Gas work Traffic lane(s) will re-open for weekday peak periods.
 
Broadway Af Eastbound  View Map  
Maryland St to Sherbrook St
Expected Duration: 05 Mar 2021 - 07 Mar 2021
Eastbound curb lane, South Sidewalk closed for Communications (Phone, Cable, Internet) work.
 
Broadway Af Eastbound  View Map  
Sherbrook St to Furby St
Expected Duration: 26 Feb 2021 - 28 Feb 2021
Eastbound median lane closed for Communications (Phone, Cable, Internet) work.
     
Campeau St Southbound  
St Therese Av to End
Expected Duration: 02 Mar 2021 - 15 Mar 2021
Southbound curb lane closed for Sewer work.
   
Carlton St Southbound  View Map Updated 23 Feb 2021 10:58 AM
Cumberland Av to Qu'Appelle Av
Expected Duration: 09 Mar 2021 - 09 Mar 2021 03:00 PM
ONE WAY STREET Left side curb lane closed for building construction/maintenance.
 
Carlton St Southbound  View Map Updated 16 Dec 2020 01:30 PM
Graham Av to St Mary Av
Expected Duration: 09 Jul 2018 - 01 Sep 2023
West side sidewalk closed for building construction.
 
Carlton St Southbound  View Map Updated 16 Dec 2020 10:24 AM
Graham Av to St Mary Av
Expected Duration: 21 Dec 2020 - 15 Apr 2023
Painted Bicycle lane, ONE WAY STREET Right side curb lane, West Sidewalk, rear lane closed for building construction/maintenance.
   
Century St Northbound  View Map  
Silver Av to St Matthews Av
Expected Duration: 27 Feb 2021 - 05 Mar 2021
Northbound curb lane closed for water work.
 
Century St Southbound  View Map  
St Matthews Av to Silver Av
Expected Duration: 21 Feb 2021 - 03 Mar 2021
Southbound curb lane, Southbound middle lane closed for water work.
     
Day St Northbound  View Map Updated 19 Feb 2021 09:48 AM
Pandora Av E to Melrose Av E
Expected Duration: 07 Mar 2021 07:00 AM - 07 Mar 2021 11:00 PM
Northbound direction will be completely closed, Back lane/Public lane also closed for Communications (Phone, Cable, Internet) work.
   
Des Hivernants Bv Northbound  
Sage Cr Bv to Dr David Friesen Dr
Expected Duration: 08 Mar 2021 - 12 Mar 2021
NB will be completely closed to all traffic due to water work.
   
Donald St Southbound  View Map  
Portage Av to Graham Av
Expected Duration: 05 Mar 2021 - 05 Mar 2021 07:00 AM
ONE WAY STREET Right side curb lane, ONE WAY STREET Middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
Ducharme Av Westbound Updated 26 Feb 2021 10:59 AM
Pembina Hw to Villeneuve Bv
Expected Duration: 01 Feb 2021 - 05 Mar 2021
Westbound curb lane closed for building construction/maintenance.
   
Dufferin Av Westbound  
Parr St to Arlington St
Expected Duration: 25 Feb 2021 09:00 AM - 04 Mar 2021 03:00 PM
Westbound curb lane closed for Gas work
   
Dugald Rd Eastbound & Westbound  View Map Updated 25 Feb 2021 07:35 AM
Beghin Av to Guy Savoie Dr
Expected Duration: 24 Feb 2021 - 03 Mar 2021
South Sidewalk, Shoulder of roadway closed for Communications (Phone, Cable, Internet) work. No Traffic lanes will be closed. Only sidewalks will be closed
   
Dunlop Av Southbound Updated 19 Feb 2021 08:46 AM
Inkster Bv to Hutchings St
Expected Duration: 04 Feb 2021 - 26 Feb 2021
Southbound curb lane closed for Communications (Phone, Cable, Internet) work.
     
Ebby Av Westbound Updated 18 Feb 2021 10:15 AM
Pembina Hw to End
Expected Duration: 22 Feb 2021 - 26 Mar 2021
Westbound curb lane closed for Sewer work.
 
Ebby Av Eastbound & Westbound Updated 16 Feb 2021 09:57 AM
Wentworth St to Lilac St
Expected Duration: 22 Jan 2021 - 12 Mar 2021
Complete closure of entire street for Sewer work.
   
Edison Av Eastbound Updated 25 Feb 2021 11:55 AM
Roch St to Rothesay St
Expected Duration: 22 Feb 2021 - 05 Mar 2021
Eastbound curb lane closed for Sewer work.
   
Edmonton St Northbound  View Map Updated 26 Feb 2021 10:21 AM
St Mary Av to Graham Av
Expected Duration: 02 Feb 2021 - 05 Mar 2021
East side curb lane and sidewalk closed for building construction/maintenance.
 
Edmonton St Northbound  View Map Updated 25 Feb 2021 08:40 AM
St Mary Av to Graham Av
Expected Duration: 02 Mar 2021 07:00 PM - 03 Mar 2021 02:00 AM
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
Egerton Rd Southbound Updated 26 Feb 2021 09:09 AM
Humboldt Av to Handyside Av
Expected Duration: 10 Feb 2021 - 02 Mar 2021
Southbound curb lane closed for Sewer work.
   
Elmhurst Rd Northbound & Southbound  
Ridgewood Av to Newhaven Av
Expected Duration: 01 Mar 2021 08:00 AM - 03 Mar 2021 06:00 PM
Complete closure of entire street for sewer work.
     
Ferry Rd Northbound & Southbound  
Assiniboine Av to Portage Av
Expected Duration: 08 Feb 2021 - 16 Apr 2021
Southbound curb lane closed for Sewer work.
 
Ferry Rd Southbound  View Map  
Silver Av to Ness Av
Expected Duration: 03 Mar 2021 - 05 Mar 2021
Southbound middle lane closed for Sewer work.
   
Fort St Northbound Updated 24 Feb 2021 02:31 PM
Assiniboine Av to Broadway Af
Expected Duration: 01 Mar 2021 - 02 Mar 2021
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
 
Fort St Northbound  View Map Updated 26 Jun 2020 09:57 AM
Graham Av to Portage Av
Expected Duration: 05 Dec 2018 - 02 Jun 2022
East side curb lane and bike lane closed for construction.
     
Garry St Southbound  View Map Updated 01 Feb 2021 11:47 AM
Ellice Av to Portage Av
Expected Duration: 14 Dec 2020 - 31 Mar 2021
West sidewalk closed for COVID19 testing site queueing.
 
Garry St Southbound  View Map  
Graham Av to York Av
Expected Duration: 04 Mar 2021 07:00 PM - 05 Mar 2021 01:00 AM
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
Good St Southbound  
St Mary Av to Broadway Af
Expected Duration: 28 Oct 2020 - 15 Mar 2021
Southbound curb lane, West Sidewalk closed for building construction/maintenance.
   
Graham Av Eastbound  View Map Updated 16 Dec 2020 10:25 AM
Edmonton St to Carlton St
Expected Duration: 21 Dec 2020 07:00 AM - 15 Apr 2023 05:00 PM
EB Graham will be closed to all traffic except Winnipeg Transit due to building construction.
 
Graham Av Eastbound & Westbound  View Map Updated 15 Jul 2020 02:50 PM
Main St to Fort St
Expected Duration: 16 Jul 2018 - 15 Jul 2021
Graham will be closed to all traffic except buses due to building construction.
   
Grosvenor Av Westbound  
Wentworth St to Stafford St
Expected Duration: 25 Feb 2021 - 01 Aug 2021
North Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
   
Gunn Rd Westbound  
Redonda St to Day St
Expected Duration: 08 Nov 2020 - 12 Mar 2021
WB Gunn will be completely closed for sewer work. EB traffic will be maintained.
     
Hamilton Av Southbound Updated 18 Feb 2021 12:22 PM
Valley View Pl to Wharton Bv
Expected Duration: 22 Feb 2021 - 26 Feb 2021
Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
Hargrave St Northbound  View Map Updated 24 Feb 2021 02:34 PM
Broadway Af to York Av
Expected Duration: 01 Mar 2021 09:00 PM - 02 Mar 2021 06:00 AM
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
Harvard Av E Eastbound & Westbound Updated 26 Feb 2021 02:54 PM
Leola St to Roanoke St
Expected Duration: 22 Feb 2021 - 12 Mar 2021
Eastbound curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers.
   
Hector Av Eastbound & Westbound  
Lilac St to Pembina Hw
Expected Duration: 11 Feb 2021 - 28 Feb 2021
Complete closure of entire street for Sewer work.
   
Henry Av Eastbound & Westbound  
King St to End
Expected Duration: 03 Mar 2021 07:00 PM - 04 Mar 2021 06:00 AM
Complete closure of entire street for sewer work.
   
Home St Southbound  
Portage Av to Preston Av
Expected Duration: 22 Feb 2021 - 16 Mar 2021
West Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
   
Hutchings St Southbound Updated 19 Feb 2021 08:47 AM
Dunlop Av to Sheppard St
Expected Duration: 04 Feb 2021 - 26 Feb 2021
Southbound curb lane closed for Communications (Phone, Cable, Internet) work.
     
James Av Eastbound & Westbound Updated 19 Feb 2021 09:07 AM
Bertha St to Amy St
Expected Duration: 23 Feb 2021 - 26 Feb 2021
Complete closure of entire street for for building construction/maintenance.
 
James Av Westbound Updated 30 Dec 2020 01:37 PM
Waterfront Dr to Amy St
Expected Duration: 26 Oct 2020 - 31 May 2021
North Sidewalk closed for building construction/maintenance.
   
Juno St Northbound & Southbound Updated 05 Feb 2021 11:32 AM
McDermot Av to Notre Dame Av
Expected Duration: 22 Feb 2021 - 22 Apr 2021
East Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
     
Kennedy St Northbound  View Map Updated 18 Jan 2021 10:21 AM
Ellice Av to Qu'Appelle Av
Expected Duration: 14 Jun 2020 - 30 Nov 2021
East Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed
 
Kennedy St Southbound  View Map  
Graham Av to York Av
Expected Duration: 01 Mar 2021 - 05 Mar 2021
ONE WAY STREET Right side curb lane closed for Communications (Phone, Cable, Internet) work.
   
King Edward St Southbound  View Map Updated 01 Feb 2021 11:47 AM
Sargent Av to St Matthews Av
Expected Duration: 31 Oct 2020 - 31 Mar 2021
Left side curb lane closed for COVID test site queueing.
   
King St Northbound  View Map Updated 25 Feb 2021 01:34 PM
William Av to James Av
Expected Duration: 18 Dec 2020 - 18 Mar 2021
ONE WAY STREET Right side curb lane, east sidewalk closed for building construction/maintenance. On Feb 27 King will be reduced to one lane between 9-3.
     
Lagimodiere Bv Northbound  View Map  
Fermor Av to Betournay St
Expected Duration: 01 Mar 2021 - 09 Mar 2021 03:00 PM
Northbound curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.
   
Lilac St Northbound & Southbound Updated 16 Feb 2021 09:55 AM
Ebby Av to Carter Av
Expected Duration: 13 Jan 2021 - 12 Mar 2021
Lilac will be completely closed for sewer work.
   
Logan Av Eastbound & Westbound  View Map Updated 22 Feb 2021 09:05 AM
Chambers St to Gwendoline St
Expected Duration: 10 Mar 2021 - 18 Mar 2021
Eastbound median lane, Westbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
Lyndale Dr Westbound Updated 08 Jan 2021 08:14 AM
Monck Av to Birchdale Av
Expected Duration: 12 Jan 2021 - 15 Mar 2021
Lyndale will be completely closed for construction. South sidewalk also closed.
     
Main St Northbound & Southbound  View Map  
Benn Av to Fernbank Av
Expected Duration: 01 Mar 2021 - 05 Mar 2021
Shoulders of roadway closed for Communications (Phone, Cable, Internet) work.
 
Main St Northbound  View Map  
Broadway Af to York Av
Expected Duration: 04 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
Northbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.
 
Main St Northbound  View Map Updated 26 Feb 2021 10:15 AM
Manitoba Av to Magnus Av
Expected Duration: 08 May 2020 - 26 Mar 2021
East Sidewalk closed for Building Construction/Maintenance work.
 
Main St Northbound  View Map  
McDermot Av to Bannatyne Av
Expected Duration: 08 Jan 2021 - 28 Mar 2021
East Sidewalk closed for overhead crane work. No Traffic lanes will be closed. Only sidewalks will be closed
 
Main St Southbound  View Map Updated 09 Feb 2021 02:49 PM
Pioneer Av to Graham Av
Expected Duration: 29 Jun 2020 - 04 Mar 2021
SB curb lane & West Sidewalk closed for Street Construction/Maintenance work.
 
Main St Northbound  View Map Updated 23 Feb 2021 10:28 AM
Selkirk Av to Manitoba Av
Expected Duration: 02 Mar 2021 - 29 Mar 2021
Northbound 2 middle lanes closed for Electrical work.
   
Maryland St Southbound  View Map  
Sara Av to Purcell Av
Expected Duration: 26 Feb 2021 09:00 AM - 26 Feb 2021 03:00 PM
Southbound curb lane, Southbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
McDermot Av Eastbound  
Kate St to Juno St
Expected Duration: 22 Feb 2021 - 22 Apr 2021
South sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
 
McDermot Av Eastbound Updated 19 Feb 2021 03:14 PM
Sherbrook St to Furby St
Expected Duration: 17 Feb 2021 - 26 Feb 2021
ONE WAY STREET Left side curb lane closed for building construction/maintenance.
 
McDermot Av Eastbound  
Tecumseh St to Emily St
Expected Duration: 03 Mar 2021 - 04 Mar 2021
Eastbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
McKenzie St Northbound & Southbound  
Kilbride Av to Burrin Av
Expected Duration: 07 Aug 2020 - 25 Jul 2021
Complete closure of entire street for sewer work.
   
McPhillips St Southbound  View Map  
Swailes Av to Templeton Av
Expected Duration: 02 Mar 2021 09:00 AM - 16 Mar 2021 03:00 PM
Southbound curb lane, West Sidewalk closed for Gas work Traffic lane(s) will re-open for weekday peak periods.
   
Memorial Bv Northbound  View Map  
St Mary Av to Portage Av
Expected Duration: 03 Mar 2021 - 03 Mar 2021 07:00 AM
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
Midtown Bridge Southbound  View Map  
Donald St to Donald St
Expected Duration: 02 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
Southbound curb lane closed for bridge work/maintenance. Traffic lane(s) will re-open for weekday peak periods.
   
Morrow Av Westbound  
End to St Annes Rd
Expected Duration: 08 Mar 2021 - 15 Mar 2021
Westbound curb lane closed for Sewer work.
     
Nairn Av Eastbound  View Map Updated 01 Feb 2021 11:48 AM
Keenleyside St to Stapleton St
Expected Duration: 12 Oct 2020 - 31 Mar 2021
Curb lane closed for Public Works.
   
Nairn Av Overpass Westbound  View Map  
Grey St to Watt St
Expected Duration: 02 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
Westbound curb lane closed for bridge work/maintenance. Traffic lane(s) will re-open for weekday peak periods.
   
Ness Av Eastbound  View Map  
Mount Royal Rd to Sharp Bv
Expected Duration: 03 Mar 2021 - 31 Mar 2021
Ness will be reduced to one lane per direction. closed for Electrical work.
 
Ness Av Eastbound  View Map  
Mount Royal Rd to Sharp Bv
Expected Duration: 25 Feb 2021 - 26 Feb 2021
Eastbound curb lane, East Sidewalk closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.
 
Ness Av Eastbound & Westbound  View Map Updated 21 Dec 2020 01:33 PM
Whytewold Rd to Mount Royal Rd
Expected Duration: 08 Feb 2021 - 12 Mar 2021
Ness will be reduced to one lane per direction due to hydro work.
   
Notre Dame Av Westbound  View Map  
Flint St to Cecil St
Expected Duration: 22 Feb 2021 09:00 AM - 28 Feb 2021 03:00 PM
Westbound curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.
 
Notre Dame Av Westbound  View Map  
Furby St to Pearl St
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
North side curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.
 
Notre Dame Av Eastbound  View Map  
Lipton St to Banning St
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
Eastbound curb lane closed for Street Construction/Maintenance work. Traffic lane(s) will re-open for weekday peak periods.
 
Notre Dame Av Westbound  View Map  
Spence St to Young St
Expected Duration: 24 Feb 2021 - 26 Feb 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
 
Notre Dame Av Eastbound & Westbound  View Map Updated 26 Feb 2021 07:35 AM
St James St to Bannatyne Av W
Expected Duration: 23 Feb 2021 09:00 AM - 03 Mar 2021 03:00 PM
Eastbound curb lane, Westbound curb lane, South Sidewalk closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.
     
Osborne St Northbound  View Map Updated 05 Aug 2020 08:51 AM
Don Av to Mulvey Av
Expected Duration: 13 May 2019 09:00 AM - 31 May 2021 03:00 PM
East sidewalk will be closed full time for building construction.
 
Osborne St Southbound  View Map Updated 10 Feb 2021 09:10 AM
Mulvey Av to Togo Av
Expected Duration: 08 Mar 2021 07:00 AM - 14 Mar 2021 03:00 PM
Southbound curb lane closed for Sewer work. Lane will reopen for afternoon peak periods.
     
Paulin St Northbound & Southbound Updated 19 Feb 2021 03:09 PM
Pacific Av to Ross Av
Expected Duration: 22 Feb 2021 08:00 AM - 22 Feb 2022 08:00 AM
Complete closure of entire street for building construction/maintenance.
   
Pembina Hw Southbound  View Map Updated 19 Nov 2020 11:38 AM
Bison Dr to Bairdmore Bv
Expected Duration: 06 Apr 2019 07:00 AM - 30 Jun 2021 03:00 PM
SB curb closed for construction.
 
Pembina Hw Northbound  View Map  
Dalhousie Dr to Newdale Av
Expected Duration: 24 Feb 2021 09:00 AM - 26 Feb 2021 03:00 PM
Painted Bicycle lane, Northbound curb lane closed for water work. Traffic lane(s) will re-open for weekday peak periods.
 
Pembina Hw Southbound  View Map  
Des Trappistes St to Minerva Av
Expected Duration: 07 Mar 2021 09:00 AM - 15 Mar 2021 03:00 PM
Southbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
 
Pembina Hw Northbound & Southbound  View Map Updated 18 Feb 2021 10:17 AM
Jackson Av to Hector Av
Expected Duration: 22 Feb 2021 - 26 Mar 2021
Single lanes closed for Sewer work.
 
Pembina Hw Southbound  View Map  
Newdale Av to Bairdmore Bv
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
Painted Bicycle lane, Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
 
Pembina Hw Northbound  View Map Updated 23 Feb 2021 11:12 AM
Turnbull Dr to De Leglise Av
Expected Duration: 15 Feb 2021 - 15 Mar 2021
Northbound curb lane closed for Sewer work.
   
Pioneer Av Westbound  View Map Updated 15 Feb 2021 12:24 PM
Westbrook St to Main St
Expected Duration: 13 Mar 2021 06:00 AM - 14 Mar 2021 08:00 PM
South Sidewalk, Complete closure of entire street for building construction/maintenance.
   
Portage Av Eastbound  View Map  
Arlington St to Home St
Expected Duration: 22 Feb 2021 - 16 Apr 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
 
Portage Av Westbound  View Map Updated 28 Jul 2020 10:03 AM
McGee St to Huntleigh St
Expected Duration: 29 Jul 2020 - 29 Jul 2021
North Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed
 
Portage Av Westbound  View Map  
Smith St to Hargrave St
Expected Duration: 05 Mar 2021 - 05 Mar 2021 07:00 AM
Westbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
Princess St Southbound  View Map Updated 09 Feb 2021 09:15 AM
Pacific Av to Rupert Av
Expected Duration: 14 Aug 2020 - 09 Mar 2021
West Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed
   
Pritchard Av Westbound Updated 25 Feb 2021 01:39 PM
McGregor St to McKenzie St
Expected Duration: 01 Mar 2021 - 31 Mar 2021
Westbound curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers.
     
Redwood Av Eastbound  
Parr St to Arlington St
Expected Duration: 03 Mar 2021 - 05 Mar 2021
EB curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers.
   
River Av Westbound  View Map  
Clarke St to Lewis St
Expected Duration: 02 Mar 2021 09:00 AM - 23 Mar 2021 03:00 PM
ONE WAY STREET Right side curb lane, ONE WAY STREET Middle lane, North Sidewalk closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.
     
Scotia St Northbound & Southbound  
Kilbride Av to Burrin Av
Expected Duration: 08 Mar 2021 - 16 Jul 2021
Complete closure of entire street for sewer work.
   
Sherbrook St Northbound & Southbound  View Map Updated 17 Feb 2021 08:38 AM
Alexander Av to Henry Av
Expected Duration: 13 Mar 2021 - 13 Mar 2021
Complete closure of entire street for Sewer work.
 
Sherbrook St Southbound  View Map  
McDermot Av to Notre Dame Av
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
Southbound median lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.
 
Sherbrook St Northbound  View Map  
Sara Av to Broadway Af
Expected Duration: 05 Mar 2021 - 07 Mar 2021 05:00 PM
ONE WAY STREET Left side curb lane, West Sidewalk closed for Communications (Phone, Cable, Internet) work.
 
Sherbrook St Northbound  View Map Updated 06 Jan 2021 10:56 AM
Wolseley Av to Westminster Av
Expected Duration: 17 Dec 2020 08:00 AM - 06 Jan 2022
West Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
   
Smith St Northbound  View Map Updated 12 Jan 2021 10:41 AM
York Av to St Mary Av
Expected Duration: 08 Jul 2019 - 17 Dec 2021
East side curb lane and sidewalk closed for building construction.
   
South Town Rd Westbound  
Centre St to Kenaston Bv
Expected Duration: 01 Feb 2021 - 26 Jun 2021
WB will be completely closed to all traffic due to building construction.
   
St Annes Rd Southbound  View Map  
Oakleigh Pl to Victory Pl
Expected Duration: 26 Feb 2021 - 05 Mar 2021
Southbound curb lane closed for water work.
   
St James St Southbound  View Map  
Bangor Av to Dublin Av
Expected Duration: 01 Mar 2021 09:00 AM - 01 Mar 2021 03:00 PM
Southbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.
   
St Mary Av Westbound  View Map Updated 16 Dec 2020 01:29 PM
Carlton St to Edmonton St
Expected Duration: 09 Jul 2018 - 01 Sep 2023
North curb lane closed for building construction.
 
St Mary Av Westbound  View Map  
Carlton St to Kennedy St
Expected Duration: 02 Mar 2021 07:00 PM - 03 Mar 2021 02:00 AM
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
 
St Mary Av Southbound  View Map Updated 05 Feb 2021 03:05 PM
Edmonton St to Kennedy St
Expected Duration: 15 Feb 2021 - 26 Feb 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
 
St Mary Av Westbound  View Map Updated 25 Feb 2021 08:47 AM
Vaughan St to Memorial Bv
Expected Duration: 03 Mar 2021 - 03 Mar 2021 07:00 AM
ONE WAY STREET Right side curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
   
St Vital Bridge Northbound  View Map  
Dunkirk Dr to Osborne St
Expected Duration: 01 Jan 2020 - 21 Dec 2021
East sidewalk closed for WWD work.
   
Stafford St Southbound  View Map Updated 14 Jan 2021 12:30 PM
McMillan Av to Corydon Av
Expected Duration: 02 Nov 2020 - 28 Feb 2021
Southbound curb lane closed for use as pedestrian detour around building construction/maintenance
 
Stafford St Northbound  View Map  
Scotland Av to Lorette Av
Expected Duration: 26 Feb 2021 - 05 Mar 2021
Northbound curb lane closed for Street Construction/Maintenance work.
   
Stradbrook Av Eastbound  View Map Updated 26 Feb 2021 10:24 AM
Wellington Cr to Nassau St N
Expected Duration: 08 Mar 2021 - 10 Mar 2021
ONE WAY STREET Right side curb lane, South Sidewalk closed for water work.
     
Talbot Av Westbound Updated 11 Feb 2021 10:24 AM
Allan St to Stadacona St
Expected Duration: 18 Feb 2021 - 12 Mar 2021
Westbound curb lane, South Sidewalk closed for building construction/maintenance.
   
Toronto St Southbound Updated 10 Feb 2021 08:56 AM
St Matthews Av to Portage Av
Expected Duration: 16 Feb 2021 - 31 Oct 2021
Southbound curb lane, West Sidewalk closed for building construction/maintenance.
   
Transcona Bv Eastbound  
Bienvenue St to Plessis Rd
Expected Duration: 01 Mar 2021 - 02 Apr 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed
 
Transcona Bv Eastbound Updated 24 Feb 2021 01:54 PM
Chelston Gt to Bienvenue St
Expected Duration: 04 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
Eastbound curb lane closed for Street Construction/Maintenance work. Traffic lane(s) will re-open for weekday peak periods.
     
University Cr Southbound  View Map Updated 24 Feb 2021 01:51 PM
Pembina Hw to Chancellor Matheson Rd
Expected Duration: 18 Feb 2021 09:00 AM - 04 Mar 2021 03:00 PM
Northbound curb lane, Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
     
Wellington Cr Eastbound & Westbound Updated 30 Nov 2020 11:33 AM
Park Bv N to Doncaster St
Expected Duration: 07 Dec 2020 - 31 Mar 2021
Eastbound curb lane, Westbound curb lane, North Sidewalk closed for Street Construction/Maintenance work. Access to Wellington Cr. from adjacent side streets will be restricted.
   
Wentworth St Southbound  
Weatherdon Av to Taylor Av
Expected Duration: 24 Feb 2021 - 01 Jun 2021
Southbound curb lane closed for Sewer work.
   
Whytewold Rd Northbound & Southbound  
At Ness Av
Expected Duration: 28 Feb 2021 07:00 AM - 28 Feb 2021 07:00 PM
Whytewold will be completely closed at Ness due to hydro work.
   
William Av Eastbound & Westbound  View Map  
Tecumseh St to Sherbrook St
Expected Duration: 05 Mar 2021 - 05 Mar 2021
Eastbound median lane, Westbound median lane closed for Sewer work.
   
Wolseley Av Westbound Updated 06 Jan 2021 10:58 AM
Sherbrook St to Maryland St
Expected Duration: 17 Dec 2020 - 06 Jan 2022
North Sidewalk and Westbound curb lane closed for building construction/maintenance.
     
York Av Eastbound  View Map  
Carlton St to Donald St
Expected Duration: 01 Mar 2021 10:00 PM - 02 Mar 2021 06:00 AM
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.
Page Updated: February 28, 2021 12:00 AM
 
Disclaimer and Indemnity:
The information on this web site is provided as a public service and should be used for general information purposes only. Although the information provided is believed to be reliable when posted, www.winnipeg.ca/LaneCLosures cannot guarantee that it is accurate or complete or that it will be current at all times. This site should not be the sole source of information relied upon when determining whether to travel in a particular area. The reporting of adverse conditions does not guarantee that the area has or will be serviced by officials responsible for the area. For information whether a particular section of road will be serviced, you should contact the local officials for the specific area. The information on this web site is subject to change without notice. WWW.Winnipeg.ca AND ITS AFFILIATES ARE NOT RESPONSIBLE IN ANY MANNER FOR DIRECT, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES HOWSOEVER CAUSED RESULTING FROM THE USE, MISUSE OR MISINTERPRETATION OF ANY CONTENT, PRODUCTS OR SERVICES PROVIDED BY THIS WEB SITE.
 
By using this site, you agree to indemnify, defend and hold harmless City of Winnipeg and its officials, officers, employees and authorized representatives from and against any liability, loss injury (including injuries resulting in death), demand, action, cost, expense, or claim of any kind, including but not limited to lawyer's fees, relating in any way to your use of the contents, or services provided by this web site.

Last update: January 20, 2016

Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.

Ces renseignements sont-ils utiles?

Comment pourrait-on améliorer cette page Web?

Les renseignements recueillis serviront à l’amélioration de notre site Web. Prière de ne pas se servir de ce formulaire pour soumettre une demande de service ou de renseignements, car la demande ne sera pas transmise au service en question. Pour soumettre une demande de service ou de renseignements, veuillez communiquer avec le 311.

Le présent formulaire ne vise pas à recueillir des renseignements personnels. Cependant, les renseignements personnels que vous choisissez d’inclure dans vos commentaires sont recueillis par la Ville de Winnipeg en conformité avec l’alinéa 36(1)b) de la Loi sur l’accès à l’information et la protection de la vie privée dans le but d’améliorer son site Web et ne seront ni utilisés ni divulgués pour d’autres raisons, sauf dans les cas où cela est autorisé par la loi. Communiquez avec l’agent de l’accès à l’information et de la protection de la vie privée de la Ville par courrier au Bureau du greffier, immeuble Susan-A.-Thompson, 510, rue Main, Winnipeg (Manitoba) R3B 1B9, ou par téléphone au 311 si vous avez des questions sur la collecte de ces renseignements.