Last Update: February 28, 2021 12:00 AM

Updated 20 Jan 2021 10:04 AM
Academy Rd Eastbound
Waterloo St to Ash St
Expected Duration: 10 Nov 2020 - 26 Feb 2021
Back lane/Public lane closed for building construction/maintenance.

Updated 25 Feb 2021 10:27 AM
Academy Rd Eastbound
Waterloo St to Ash St
Expected Duration: 27 Feb 2021 - 27 Mar 2021
Back lane/Public lane closed for building construction/maintenance.

Updated 02 Feb 2021 03:31 PM
Alexander Av Southbound
Waterfront Dr to Lily St
Expected Duration: 04 Feb 2021 - 30 Apr 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 22 Feb 2021 02:14 PM
Alloway Av Westbound
Maryland St to End
Expected Duration: 26 Feb 2021 - 26 Feb 2021
Westbound curb lane closed for Sewer work.

Updated 22 Oct 2020 01:54 PM
Amy St Northbound
James Av to Rupert Av
Expected Duration: 26 Oct 2020 - 30 Dec 2021
Northbound curb lane, East Sidewalk closed for building construction/maintenance.

 
Archibald St Northbound
Kavanagh St to Messier St
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
Northbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.

 
Archibald St Northbound
Plinguet St to Tissot St
Expected Duration: 01 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
Northbound curb lane, East Sidewalk closed for Gas work Traffic lane(s) will re-open for weekday peak periods.

 
Bannatyne Av Westbound
Rorie St to Main St
Expected Duration: 08 Jan 2021 - 28 Mar 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

 
Beghin Av Northbound & Southbound
Dugald Rd to Durand Rd
Expected Duration: 23 Feb 2021 - 26 Feb 2021
Single lanes closed for Communications (Phone, Cable, Internet) work.

Updated 11 Feb 2021 12:37 PM
Bell Av Westbound
Donald St to Clarke St
Expected Duration: 15 Feb 2021 - 24 Sep 2021
Westbound curb lane, North Sidewalk closed for building construction/maintenance.

 
Broadway Af Eastbound
Kennedy St to Edmonton St
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
Eastbound median lane closed for Gas work Traffic lane(s) will re-open for weekday peak periods.

 
Broadway Af Eastbound
Maryland St to Sherbrook St
Expected Duration: 05 Mar 2021 - 07 Mar 2021
Eastbound curb lane, South Sidewalk closed for Communications (Phone, Cable, Internet) work.

 
Broadway Af Eastbound
Sherbrook St to Furby St
Expected Duration: 26 Feb 2021 - 28 Feb 2021
Eastbound median lane closed for Communications (Phone, Cable, Internet) work.

 
Campeau St Southbound
St Therese Av to End
Expected Duration: 02 Mar 2021 - 15 Mar 2021
Southbound curb lane closed for Sewer work.

Updated 23 Feb 2021 10:58 AM
Carlton St Southbound
Cumberland Av to Qu'Appelle Av
Expected Duration: 09 Mar 2021 - 09 Mar 2021 03:00 PM
ONE WAY STREET Left side curb lane closed for building construction/maintenance.

Updated 16 Dec 2020 01:30 PM
Carlton St Southbound
Graham Av to St Mary Av
Expected Duration: 09 Jul 2018 - 01 Sep 2023
West side sidewalk closed for building construction.

Updated 16 Dec 2020 10:24 AM
Carlton St Southbound
Graham Av to St Mary Av
Expected Duration: 21 Dec 2020 - 15 Apr 2023
Painted Bicycle lane, ONE WAY STREET Right side curb lane, West Sidewalk, rear lane closed for building construction/maintenance.

 
Century St Northbound
Silver Av to St Matthews Av
Expected Duration: 27 Feb 2021 - 05 Mar 2021
Northbound curb lane closed for water work.

 
Century St Southbound
St Matthews Av to Silver Av
Expected Duration: 21 Feb 2021 - 03 Mar 2021
Southbound curb lane, Southbound middle lane closed for water work.

Updated 19 Feb 2021 09:48 AM
Day St Northbound
Pandora Av E to Melrose Av E
Expected Duration: 07 Mar 2021 07:00 AM - 07 Mar 2021 11:00 PM
Northbound direction will be completely closed, Back lane/Public lane also closed for Communications (Phone, Cable, Internet) work.

 
Des Hivernants Bv Northbound
Sage Cr Bv to Dr David Friesen Dr
Expected Duration: 08 Mar 2021 - 12 Mar 2021
NB will be completely closed to all traffic due to water work.

 
Donald St Southbound
Portage Av to Graham Av
Expected Duration: 05 Mar 2021 - 05 Mar 2021 07:00 AM
ONE WAY STREET Right side curb lane, ONE WAY STREET Middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 26 Feb 2021 10:59 AM
Ducharme Av Westbound
Pembina Hw to Villeneuve Bv
Expected Duration: 01 Feb 2021 - 05 Mar 2021
Westbound curb lane closed for building construction/maintenance.

 
Dufferin Av Westbound
Parr St to Arlington St
Expected Duration: 25 Feb 2021 09:00 AM - 04 Mar 2021 03:00 PM
Westbound curb lane closed for Gas work

Updated 25 Feb 2021 07:35 AM
Dugald Rd Eastbound & Westbound
Beghin Av to Guy Savoie Dr
Expected Duration: 24 Feb 2021 - 03 Mar 2021
South Sidewalk, Shoulder of roadway closed for Communications (Phone, Cable, Internet) work. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 19 Feb 2021 08:46 AM
Dunlop Av Southbound
Inkster Bv to Hutchings St
Expected Duration: 04 Feb 2021 - 26 Feb 2021
Southbound curb lane closed for Communications (Phone, Cable, Internet) work.

Updated 18 Feb 2021 10:15 AM
Ebby Av Westbound
Pembina Hw to End
Expected Duration: 22 Feb 2021 - 26 Mar 2021
Westbound curb lane closed for Sewer work.

Updated 16 Feb 2021 09:57 AM
Ebby Av Eastbound & Westbound
Wentworth St to Lilac St
Expected Duration: 22 Jan 2021 - 12 Mar 2021
Complete closure of entire street for Sewer work.

Updated 25 Feb 2021 11:55 AM
Edison Av Eastbound
Roch St to Rothesay St
Expected Duration: 22 Feb 2021 - 05 Mar 2021
Eastbound curb lane closed for Sewer work.

Updated 26 Feb 2021 10:21 AM
Edmonton St Northbound
St Mary Av to Graham Av
Expected Duration: 02 Feb 2021 - 05 Mar 2021
East side curb lane and sidewalk closed for building construction/maintenance.

Updated 25 Feb 2021 08:40 AM
Edmonton St Northbound
St Mary Av to Graham Av
Expected Duration: 02 Mar 2021 07:00 PM - 03 Mar 2021 02:00 AM
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 26 Feb 2021 09:09 AM
Egerton Rd Southbound
Humboldt Av to Handyside Av
Expected Duration: 10 Feb 2021 - 02 Mar 2021
Southbound curb lane closed for Sewer work.

 
Elmhurst Rd Northbound & Southbound
Ridgewood Av to Newhaven Av
Expected Duration: 01 Mar 2021 08:00 AM - 03 Mar 2021 06:00 PM
Complete closure of entire street for sewer work.

 
Ferry Rd Northbound & Southbound
Assiniboine Av to Portage Av
Expected Duration: 08 Feb 2021 - 16 Apr 2021
Southbound curb lane closed for Sewer work.

 
Ferry Rd Southbound
Silver Av to Ness Av
Expected Duration: 03 Mar 2021 - 05 Mar 2021
Southbound middle lane closed for Sewer work.

Updated 24 Feb 2021 02:31 PM
Fort St Northbound
Assiniboine Av to Broadway Af
Expected Duration: 01 Mar 2021 - 02 Mar 2021
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 26 Jun 2020 09:57 AM
Fort St Northbound
Graham Av to Portage Av
Expected Duration: 05 Dec 2018 - 02 Jun 2022
East side curb lane and bike lane closed for construction.

Updated 01 Feb 2021 11:47 AM
Garry St Southbound
Ellice Av to Portage Av
Expected Duration: 14 Dec 2020 - 31 Mar 2021
West sidewalk closed for COVID19 testing site queueing.

 
Garry St Southbound
Graham Av to York Av
Expected Duration: 04 Mar 2021 07:00 PM - 05 Mar 2021 01:00 AM
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

 
Good St Southbound
St Mary Av to Broadway Af
Expected Duration: 28 Oct 2020 - 15 Mar 2021
Southbound curb lane, West Sidewalk closed for building construction/maintenance.

Updated 16 Dec 2020 10:25 AM
Graham Av Eastbound
Edmonton St to Carlton St
Expected Duration: 21 Dec 2020 07:00 AM - 15 Apr 2023 05:00 PM
EB Graham will be closed to all traffic except Winnipeg Transit due to building construction.

Updated 15 Jul 2020 02:50 PM
Graham Av Eastbound & Westbound
Main St to Fort St
Expected Duration: 16 Jul 2018 - 15 Jul 2021
Graham will be closed to all traffic except buses due to building construction.

 
Grosvenor Av Westbound
Wentworth St to Stafford St
Expected Duration: 25 Feb 2021 - 01 Aug 2021
North Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

 
Gunn Rd Westbound
Redonda St to Day St
Expected Duration: 08 Nov 2020 - 12 Mar 2021
WB Gunn will be completely closed for sewer work. EB traffic will be maintained.

Updated 18 Feb 2021 12:22 PM
Hamilton Av Southbound
Valley View Pl to Wharton Bv
Expected Duration: 22 Feb 2021 - 26 Feb 2021
Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 24 Feb 2021 02:34 PM
Hargrave St Northbound
Broadway Af to York Av
Expected Duration: 01 Mar 2021 09:00 PM - 02 Mar 2021 06:00 AM
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 26 Feb 2021 02:54 PM
Harvard Av E Eastbound & Westbound
Leola St to Roanoke St
Expected Duration: 22 Feb 2021 - 12 Mar 2021
Eastbound curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers.

 
Hector Av Eastbound & Westbound
Lilac St to Pembina Hw
Expected Duration: 11 Feb 2021 - 28 Feb 2021
Complete closure of entire street for Sewer work.

 
Henry Av Eastbound & Westbound
King St to End
Expected Duration: 03 Mar 2021 07:00 PM - 04 Mar 2021 06:00 AM
Complete closure of entire street for sewer work.

 
Home St Southbound
Portage Av to Preston Av
Expected Duration: 22 Feb 2021 - 16 Mar 2021
West Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 19 Feb 2021 08:47 AM
Hutchings St Southbound
Dunlop Av to Sheppard St
Expected Duration: 04 Feb 2021 - 26 Feb 2021
Southbound curb lane closed for Communications (Phone, Cable, Internet) work.

Updated 19 Feb 2021 09:07 AM
James Av Eastbound & Westbound
Bertha St to Amy St
Expected Duration: 23 Feb 2021 - 26 Feb 2021
Complete closure of entire street for for building construction/maintenance.

Updated 30 Dec 2020 01:37 PM
James Av Westbound
Waterfront Dr to Amy St
Expected Duration: 26 Oct 2020 - 31 May 2021
North Sidewalk closed for building construction/maintenance.

Updated 05 Feb 2021 11:32 AM
Juno St Northbound & Southbound
McDermot Av to Notre Dame Av
Expected Duration: 22 Feb 2021 - 22 Apr 2021
East Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 18 Jan 2021 10:21 AM
Kennedy St Northbound
Ellice Av to Qu'Appelle Av
Expected Duration: 14 Jun 2020 - 30 Nov 2021
East Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed

 
Kennedy St Southbound
Graham Av to York Av
Expected Duration: 01 Mar 2021 - 05 Mar 2021
ONE WAY STREET Right side curb lane closed for Communications (Phone, Cable, Internet) work.

Updated 01 Feb 2021 11:47 AM
King Edward St Southbound
Sargent Av to St Matthews Av
Expected Duration: 31 Oct 2020 - 31 Mar 2021
Left side curb lane closed for COVID test site queueing.

Updated 25 Feb 2021 01:34 PM
King St Northbound
William Av to James Av
Expected Duration: 18 Dec 2020 - 18 Mar 2021
ONE WAY STREET Right side curb lane, east sidewalk closed for building construction/maintenance. On Feb 27 King will be reduced to one lane between 9-3.

 
Lagimodiere Bv Northbound
Fermor Av to Betournay St
Expected Duration: 01 Mar 2021 - 09 Mar 2021 03:00 PM
Northbound curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.

Updated 16 Feb 2021 09:55 AM
Lilac St Northbound & Southbound
Ebby Av to Carter Av
Expected Duration: 13 Jan 2021 - 12 Mar 2021
Lilac will be completely closed for sewer work.

Updated 22 Feb 2021 09:05 AM
Logan Av Eastbound & Westbound
Chambers St to Gwendoline St
Expected Duration: 10 Mar 2021 - 18 Mar 2021
Eastbound median lane, Westbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 08 Jan 2021 08:14 AM
Lyndale Dr Westbound
Monck Av to Birchdale Av
Expected Duration: 12 Jan 2021 - 15 Mar 2021
Lyndale will be completely closed for construction. South sidewalk also closed.

 
Main St Northbound & Southbound
Benn Av to Fernbank Av
Expected Duration: 01 Mar 2021 - 05 Mar 2021
Shoulders of roadway closed for Communications (Phone, Cable, Internet) work.

 
Main St Northbound
Broadway Af to York Av
Expected Duration: 04 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
Northbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.

Updated 26 Feb 2021 10:15 AM
Main St Northbound
Manitoba Av to Magnus Av
Expected Duration: 08 May 2020 - 26 Mar 2021
East Sidewalk closed for Building Construction/Maintenance work.

 
Main St Northbound
McDermot Av to Bannatyne Av
Expected Duration: 08 Jan 2021 - 28 Mar 2021
East Sidewalk closed for overhead crane work. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 09 Feb 2021 02:49 PM
Main St Southbound
Pioneer Av to Graham Av
Expected Duration: 29 Jun 2020 - 04 Mar 2021
SB curb lane & West Sidewalk closed for Street Construction/Maintenance work.

Updated 23 Feb 2021 10:28 AM
Main St Northbound
Selkirk Av to Manitoba Av
Expected Duration: 02 Mar 2021 - 29 Mar 2021
Northbound 2 middle lanes closed for Electrical work.

 
Maryland St Southbound
Sara Av to Purcell Av
Expected Duration: 26 Feb 2021 09:00 AM - 26 Feb 2021 03:00 PM
Southbound curb lane, Southbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

 
McDermot Av Eastbound
Kate St to Juno St
Expected Duration: 22 Feb 2021 - 22 Apr 2021
South sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 19 Feb 2021 03:14 PM
McDermot Av Eastbound
Sherbrook St to Furby St
Expected Duration: 17 Feb 2021 - 26 Feb 2021
ONE WAY STREET Left side curb lane closed for building construction/maintenance.

 
McDermot Av Eastbound
Tecumseh St to Emily St
Expected Duration: 03 Mar 2021 - 04 Mar 2021
Eastbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

 
McKenzie St Northbound & Southbound
Kilbride Av to Burrin Av
Expected Duration: 07 Aug 2020 - 25 Jul 2021
Complete closure of entire street for sewer work.

 
McPhillips St Southbound
Swailes Av to Templeton Av
Expected Duration: 02 Mar 2021 09:00 AM - 16 Mar 2021 03:00 PM
Southbound curb lane, West Sidewalk closed for Gas work Traffic lane(s) will re-open for weekday peak periods.

 
Memorial Bv Northbound
St Mary Av to Portage Av
Expected Duration: 03 Mar 2021 - 03 Mar 2021 07:00 AM
Northbound middle lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

 
Midtown Bridge Southbound
Donald St to Donald St
Expected Duration: 02 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
Southbound curb lane closed for bridge work/maintenance. Traffic lane(s) will re-open for weekday peak periods.

 
Morrow Av Westbound
End to St Annes Rd
Expected Duration: 08 Mar 2021 - 15 Mar 2021
Westbound curb lane closed for Sewer work.

Updated 01 Feb 2021 11:48 AM
Nairn Av Eastbound
Keenleyside St to Stapleton St
Expected Duration: 12 Oct 2020 - 31 Mar 2021
Curb lane closed for Public Works.

 
Nairn Av Overpass Westbound
Grey St to Watt St
Expected Duration: 02 Mar 2021 09:00 AM - 02 Mar 2021 03:00 PM
Westbound curb lane closed for bridge work/maintenance. Traffic lane(s) will re-open for weekday peak periods.

 
Ness Av Eastbound
Mount Royal Rd to Sharp Bv
Expected Duration: 03 Mar 2021 - 31 Mar 2021
Ness will be reduced to one lane per direction. closed for Electrical work.

 
Ness Av Eastbound
Mount Royal Rd to Sharp Bv
Expected Duration: 25 Feb 2021 - 26 Feb 2021
Eastbound curb lane, East Sidewalk closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.

Updated 21 Dec 2020 01:33 PM
Ness Av Eastbound & Westbound
Whytewold Rd to Mount Royal Rd
Expected Duration: 08 Feb 2021 - 12 Mar 2021
Ness will be reduced to one lane per direction due to hydro work.

 
Notre Dame Av Westbound
Flint St to Cecil St
Expected Duration: 22 Feb 2021 09:00 AM - 28 Feb 2021 03:00 PM
Westbound curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.

 
Notre Dame Av Westbound
Furby St to Pearl St
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
North side curb lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.

 
Notre Dame Av Eastbound
Lipton St to Banning St
Expected Duration: 03 Mar 2021 09:00 AM - 03 Mar 2021 03:00 PM
Eastbound curb lane closed for Street Construction/Maintenance work. Traffic lane(s) will re-open for weekday peak periods.

 
Notre Dame Av Westbound
Spence St to Young St
Expected Duration: 24 Feb 2021 - 26 Feb 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 26 Feb 2021 07:35 AM
Notre Dame Av Eastbound & Westbound
St James St to Bannatyne Av W
Expected Duration: 23 Feb 2021 09:00 AM - 03 Mar 2021 03:00 PM
Eastbound curb lane, Westbound curb lane, South Sidewalk closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.

Updated 05 Aug 2020 08:51 AM
Osborne St Northbound
Don Av to Mulvey Av
Expected Duration: 13 May 2019 09:00 AM - 31 May 2021 03:00 PM
East sidewalk will be closed full time for building construction.

Updated 10 Feb 2021 09:10 AM
Osborne St Southbound
Mulvey Av to Togo Av
Expected Duration: 08 Mar 2021 07:00 AM - 14 Mar 2021 03:00 PM
Southbound curb lane closed for Sewer work. Lane will reopen for afternoon peak periods.

Updated 19 Feb 2021 03:09 PM
Paulin St Northbound & Southbound
Pacific Av to Ross Av
Expected Duration: 22 Feb 2021 08:00 AM - 22 Feb 2022 08:00 AM
Complete closure of entire street for building construction/maintenance.

Updated 19 Nov 2020 11:38 AM
Pembina Hw Southbound
Bison Dr to Bairdmore Bv
Expected Duration: 06 Apr 2019 07:00 AM - 30 Jun 2021 03:00 PM
SB curb closed for construction.

 
Pembina Hw Northbound
Dalhousie Dr to Newdale Av
Expected Duration: 24 Feb 2021 09:00 AM - 26 Feb 2021 03:00 PM
Painted Bicycle lane, Northbound curb lane closed for water work. Traffic lane(s) will re-open for weekday peak periods.

 
Pembina Hw Southbound
Des Trappistes St to Minerva Av
Expected Duration: 07 Mar 2021 09:00 AM - 15 Mar 2021 03:00 PM
Southbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 18 Feb 2021 10:17 AM
Pembina Hw Northbound & Southbound
Jackson Av to Hector Av
Expected Duration: 22 Feb 2021 - 26 Mar 2021
Single lanes closed for Sewer work.

 
Pembina Hw Southbound
Newdale Av to Bairdmore Bv
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
Painted Bicycle lane, Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 23 Feb 2021 11:12 AM
Pembina Hw Northbound
Turnbull Dr to De Leglise Av
Expected Duration: 15 Feb 2021 - 15 Mar 2021
Northbound curb lane closed for Sewer work.

Updated 15 Feb 2021 12:24 PM
Pioneer Av Westbound
Westbrook St to Main St
Expected Duration: 13 Mar 2021 06:00 AM - 14 Mar 2021 08:00 PM
South Sidewalk, Complete closure of entire street for building construction/maintenance.

 
Portage Av Eastbound
Arlington St to Home St
Expected Duration: 22 Feb 2021 - 16 Apr 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 28 Jul 2020 10:03 AM
Portage Av Westbound
McGee St to Huntleigh St
Expected Duration: 29 Jul 2020 - 29 Jul 2021
North Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed

 
Portage Av Westbound
Smith St to Hargrave St
Expected Duration: 05 Mar 2021 - 05 Mar 2021 07:00 AM
Westbound median lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 09 Feb 2021 09:15 AM
Princess St Southbound
Pacific Av to Rupert Av
Expected Duration: 14 Aug 2020 - 09 Mar 2021
West Sidewalk closed for building construction/maintenance No Traffic lanes will be closed. Only sidewalks will be closed

Updated 25 Feb 2021 01:39 PM
Pritchard Av Westbound
McGregor St to McKenzie St
Expected Duration: 01 Mar 2021 - 31 Mar 2021
Westbound curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers.

 
Redwood Av Eastbound
Parr St to Arlington St
Expected Duration: 03 Mar 2021 - 05 Mar 2021
EB curb lane closed for Loading/Unloading of Trucks/Overseas Bins/Trailers.

 
River Av Westbound
Clarke St to Lewis St
Expected Duration: 02 Mar 2021 09:00 AM - 23 Mar 2021 03:00 PM
ONE WAY STREET Right side curb lane, ONE WAY STREET Middle lane, North Sidewalk closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.

 
Scotia St Northbound & Southbound
Kilbride Av to Burrin Av
Expected Duration: 08 Mar 2021 - 16 Jul 2021
Complete closure of entire street for sewer work.

Updated 17 Feb 2021 08:38 AM
Sherbrook St Northbound & Southbound
Alexander Av to Henry Av
Expected Duration: 13 Mar 2021 - 13 Mar 2021
Complete closure of entire street for Sewer work.

 
Sherbrook St Southbound
McDermot Av to Notre Dame Av
Expected Duration: 03 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
Southbound median lane closed for Communications (Phone, Cable, Internet) work. Traffic lane(s) will re-open for weekday peak periods.

 
Sherbrook St Northbound
Sara Av to Broadway Af
Expected Duration: 05 Mar 2021 - 07 Mar 2021 05:00 PM
ONE WAY STREET Left side curb lane, West Sidewalk closed for Communications (Phone, Cable, Internet) work.

Updated 06 Jan 2021 10:56 AM
Sherbrook St Northbound
Wolseley Av to Westminster Av
Expected Duration: 17 Dec 2020 08:00 AM - 06 Jan 2022
West Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 12 Jan 2021 10:41 AM
Smith St Northbound
York Av to St Mary Av
Expected Duration: 08 Jul 2019 - 17 Dec 2021
East side curb lane and sidewalk closed for building construction.

 
South Town Rd Westbound
Centre St to Kenaston Bv
Expected Duration: 01 Feb 2021 - 26 Jun 2021
WB will be completely closed to all traffic due to building construction.

 
St Annes Rd Southbound
Oakleigh Pl to Victory Pl
Expected Duration: 26 Feb 2021 - 05 Mar 2021
Southbound curb lane closed for water work.

 
St James St Southbound
Bangor Av to Dublin Av
Expected Duration: 01 Mar 2021 09:00 AM - 01 Mar 2021 03:00 PM
Southbound curb lane closed for Electrical work. Traffic lane(s) will re-open for weekday peak periods.

Updated 16 Dec 2020 01:29 PM
St Mary Av Westbound
Carlton St to Edmonton St
Expected Duration: 09 Jul 2018 - 01 Sep 2023
North curb lane closed for building construction.

 
St Mary Av Westbound
Carlton St to Kennedy St
Expected Duration: 02 Mar 2021 07:00 PM - 03 Mar 2021 02:00 AM
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 05 Feb 2021 03:05 PM
St Mary Av Southbound
Edmonton St to Kennedy St
Expected Duration: 15 Feb 2021 - 26 Feb 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 25 Feb 2021 08:47 AM
St Mary Av Westbound
Vaughan St to Memorial Bv
Expected Duration: 03 Mar 2021 - 03 Mar 2021 07:00 AM
ONE WAY STREET Right side curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

 
St Vital Bridge Northbound
Dunkirk Dr to Osborne St
Expected Duration: 01 Jan 2020 - 21 Dec 2021
East sidewalk closed for WWD work.

Updated 14 Jan 2021 12:30 PM
Stafford St Southbound
McMillan Av to Corydon Av
Expected Duration: 02 Nov 2020 - 28 Feb 2021
Southbound curb lane closed for use as pedestrian detour around building construction/maintenance

 
Stafford St Northbound
Scotland Av to Lorette Av
Expected Duration: 26 Feb 2021 - 05 Mar 2021
Northbound curb lane closed for Street Construction/Maintenance work.

Updated 26 Feb 2021 10:24 AM
Stradbrook Av Eastbound
Wellington Cr to Nassau St N
Expected Duration: 08 Mar 2021 - 10 Mar 2021
ONE WAY STREET Right side curb lane, South Sidewalk closed for water work.

Updated 11 Feb 2021 10:24 AM
Talbot Av Westbound
Allan St to Stadacona St
Expected Duration: 18 Feb 2021 - 12 Mar 2021
Westbound curb lane, South Sidewalk closed for building construction/maintenance.

Updated 10 Feb 2021 08:56 AM
Toronto St Southbound
St Matthews Av to Portage Av
Expected Duration: 16 Feb 2021 - 31 Oct 2021
Southbound curb lane, West Sidewalk closed for building construction/maintenance.

 
Transcona Bv Eastbound
Bienvenue St to Plessis Rd
Expected Duration: 01 Mar 2021 - 02 Apr 2021
South Sidewalk closed for building construction/maintenance. No Traffic lanes will be closed. Only sidewalks will be closed

Updated 24 Feb 2021 01:54 PM
Transcona Bv Eastbound
Chelston Gt to Bienvenue St
Expected Duration: 04 Mar 2021 09:00 AM - 04 Mar 2021 03:00 PM
Eastbound curb lane closed for Street Construction/Maintenance work. Traffic lane(s) will re-open for weekday peak periods.

Updated 24 Feb 2021 01:51 PM
University Cr Southbound
Pembina Hw to Chancellor Matheson Rd
Expected Duration: 18 Feb 2021 09:00 AM - 04 Mar 2021 03:00 PM
Northbound curb lane, Southbound curb lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.

Updated 30 Nov 2020 11:33 AM
Wellington Cr Eastbound & Westbound
Park Bv N to Doncaster St
Expected Duration: 07 Dec 2020 - 31 Mar 2021
Eastbound curb lane, Westbound curb lane, North Sidewalk closed for Street Construction/Maintenance work. Access to Wellington Cr. from adjacent side streets will be restricted.

 
Wentworth St Southbound
Weatherdon Av to Taylor Av
Expected Duration: 24 Feb 2021 - 01 Jun 2021
Southbound curb lane closed for Sewer work.

 
Whytewold Rd Northbound & Southbound
At Ness Av
Expected Duration: 28 Feb 2021 07:00 AM - 28 Feb 2021 07:00 PM
Whytewold will be completely closed at Ness due to hydro work.

 
William Av Eastbound & Westbound
Tecumseh St to Sherbrook St
Expected Duration: 05 Mar 2021 - 05 Mar 2021
Eastbound median lane, Westbound median lane closed for Sewer work.

Updated 06 Jan 2021 10:58 AM
Wolseley Av Westbound
Sherbrook St to Maryland St
Expected Duration: 17 Dec 2020 - 06 Jan 2022
North Sidewalk and Westbound curb lane closed for building construction/maintenance.

 
York Av Eastbound
Carlton St to Donald St
Expected Duration: 01 Mar 2021 10:00 PM - 02 Mar 2021 06:00 AM
ONE WAY STREET Middle lane, ONE WAY STREET Additional Middle Lane closed for Sewer work. Traffic lane(s) will re-open for weekday peak periods.