Site Accessibility Information Access Key 1 to Skip to Top Navigation Access Key 2 to Skip to the Three One One link Access Key 3 to Skip to City of Winnipeg Main Menu Access Key 4 to Skip to Left Navigation Menu Access Key 5 to Skip to Content area Access Key 6 to Skip to Right Sidebar content area Access Key 7 to Skip to Footer Links
Citizens Information Service
Public Works
Walk Bike Projects

North Winnipeg Parkway

The North Winnipeg Parkway active transportation corridor will connect The Forks to Chief Peguis Trail multiuse path along the Red River through Point Douglas, as well as to segments of St. John's and Seven Oaks.


Updates

The project will be delivered in three phases: preliminary infrastructure improvements; corridor design study; and major construction.

Phase 1

Phase 1 will involve preliminary construction on the existing path through and north of Michaelle Jean Park to both bring it up to accessibility standards and protect it from potential future riverbank failure. The path will be widened, paved and realigned away from the river to prevent erosion and disruption because of riverbank stabilization issues. This work will begin in late July 2021.

Phase 2

Phase 2 involves a comprehensive bikeway design study, geotechnical study, and full public engagement program. The technical study will look at:

  • Geotechnical investigations at and around 55 Redwood Ave. (the old Molson Brewery land, which has sat vacant for years)
  • Determination of how the path will cross Redwood Avenue (over or under the existing Redwood Bridge) as well as feasibility of a number of pathway options
  • Assessing upgrades to the on-road segments of path on Annabella Street, Rover Avenue, St. Cross Street, and Scotia Street
  • Assessing upgrades and realignments of segments of path that connect through existing park spaces including Aberdeen Park and St. John's Park
  • Development of a wayfinding program
  • Additional realignment investigations

Community stakeholders and Winnipeggers at large will be invited to participate in public engagement following the geotechnical analysis at and around 55 Redwood Ave and assessment of crossing Redwood Ave, likely in mid-2022. The rest of the study, design and subsequent rounds of public engagement will follow.

Phase 3

Phase 2 will result in a recommended design, which will be made final and constructed as part of Phase 3.

A complete timeline will be developed in Fall 2022 – check back for updates!

Last update: July 28, 2021

Was this information helpful?

How can we make this web page better?

Information collected will be used to improve our website. Do not use this form to submit a request for service or information because it will not be forwarded to departments for response. To submit a request for service or information, contact 311.

This form is not intended to collect personal information; however, any personal information you choose to include in your comments is collected by the City of Winnipeg under the authority of section 36(1)(b) of the Freedom of Information and Protection of Privacy Act for the purpose of improving our website and will not be used or disclosed for any other purposes, except as authorized by law. Contact the Corporate Access and Privacy Officer by mail (City Clerk’s Department, Susan A. Thompson Building, 510 Main Street, Winnipeg MB, R3B 1B9) or by telephone (311) if you have any questions about the collection of this information.

Ces renseignements sont-ils utiles?

Comment pourrait-on améliorer cette page Web?

Les renseignements recueillis serviront à l’amélioration de notre site Web. Prière de ne pas se servir de ce formulaire pour soumettre une demande de service ou de renseignements, car la demande ne sera pas transmise au service en question. Pour soumettre une demande de service ou de renseignements, veuillez communiquer avec le 311.

Le présent formulaire ne vise pas à recueillir des renseignements personnels. Cependant, les renseignements personnels que vous choisissez d’inclure dans vos commentaires sont recueillis par la Ville de Winnipeg en conformité avec l’alinéa 36(1)b) de la Loi sur l’accès à l’information et la protection de la vie privée dans le but d’améliorer son site Web et ne seront ni utilisés ni divulgués pour d’autres raisons, sauf dans les cas où cela est autorisé par la loi. Communiquez avec l’agent de l’accès à l’information et de la protection de la vie privée de la Ville par courrier au Bureau du greffier, immeuble Susan-A.-Thompson, 510, rue Main, Winnipeg (Manitoba) R3B 1B9, ou par téléphone au 311 si vous avez des questions sur la collecte de ces renseignements.