Property for Sale - St. Boniface Industrial Park
The St. Boniface Industrial Park is located in the southeast quadrant of the City of Winnipeg, approximately one kilometre southeast of the intersection of Lagimodiere Boulevard (Highway #59) and Dugald Road.
The St. Boniface Industrial Park has been designed to accommodate industrial businesses and their needs. The roads in the St. Boniface Industrial Park have been oversized to accommodate industrial traffic and to facilitate easily accessible and economical shipping of materials and product.
Businesses in the park have developed their buildings in a controlled environment, meeting standards of quality in both buildings and landscaping. The St. Boniface Industrial Park is well-maintained and managed and provides a park-like environment with its lakes and attractive landscaping.
The Industrial Park has been developed in two phases:
Phase 2 | |
Location | St. Boniface Industrial Park Phase 2 Map |
Servicing | Combination of fully serviced and un-serviced lots |
Zoning | "M3" The Manufacturing Heavy ("M3") district is intended to provide for light or heavy industrial development, including heavy manufacturing, storage, major freight terminals, waste and salvage, resource extraction, processing, transportation, major utilities, and other related uses, particularly those that require very large buildings, frequent heavy truck traffic for supplies or shipments, or that may require substantial mitigation to avoid sound, noise, and odour impacts to neighbouring properties. New "M3" zone districts should not be established within 300 feet of an existing residential zone district. |
Transportation | Trucking: Minutes from the Trans Canada Highway, Lagimodiere Boulevard (Highway #59) and the Perimeter Highway
Rail: None at this time Transit: None at this time |
Lot Sizes | Lots sizing can be accommodated to fit the needs of the end user. |
Price | $250,000/per acre Prices are reviewed annually and are subject to change. |
SOLD OUT - Phase 1 | |
Location | St. Boniface Industrial Park Phase 1 Map |
Servicing | Full range of municipal services |
Zoning | "M2" The Manufacturing General ("M2") district is intended to provide for light manufacturing, processing, service, storage, wholesale, and distribution operations, with some limited outside operations and storage. |
Transportation | Trucking: Minutes from the Trans Canada Highway, Lagimodiere Boulevard (Highway #59) and the Perimeter Highway Rail: Directly into the Industrial Park, with CN Symington Yards and CN Transcona Yards in close proximity Transit: Route #49 & Route #87 |
Lot Sizes | Lots are available in sizes ranging from two to 11 acres |
Price | $175,000/per acre Prices are reviewed annually and are subject to change. |
For more information contact:
Real Estate Branch, 2nd Floor - 65 Garry Street,
Winnipeg, Manitoba, R3C 4K4
Phone: 311
NOTE: The above data is considered to be basic approximate information only and is not intended to fully describe the subject property. Any interested party should satisfy themselves as to the suitability of this property for their purposes.
The City provides no representations or warranties.