Last Update: May 9, 2024 04:04 a.m.
Andrews St to Powers St
Expected Duration: 05 Jul 2023 - 31 May 2024
North side sidewalk, closed for building construction/maintenance.
Arlington St to Parr St
Expected Duration: 04 May 2024 - 20 May 2024
Eastbound curb lane, closed for water work.
Niagara St to Waterloo St
Expected Duration: 05 May 2024 - 31 May 2024
Complete closure of all eastbound lanes, south side sidewalk, closed for water work.
Elgin Av to William Av
Expected Duration: 14 May 2024 - 31 May 2024
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Aberdeen Av to Boyd Av
Expected Duration: 15 Nov 2023 - 20 May 2024
East side sidewalk, closed for street construction/maintenance.
Aberdeen Av to Boyd Av
Expected Duration: 17 May 2024 - 28 Jun 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
McDermot Av to Bannatyne Av
Expected Duration: 14 May 2024 - 14 May 2024
Complete closure of all northbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
McDermot Av to Notre Dame Av
Expected Duration: 15 May 2024 - 18 May 2024
Complete closure of all southbound lanes, complete closure of all northbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Notre Dame Av to McDermot Av
Expected Duration: 14 May 2024 - 14 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Lily St to Martha St
Expected Duration: 29 Apr 2024 - 31 May 2024
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Wellington Av to Adele Av
Expected Duration: 04 May 2024 - 31 May 2024
Northbound curb lane, closed for water work.
Amarynth Cr to School Rd
Expected Duration: 07 May 2024 - 27 May 2024
Back lane/public lane, closed for sewer work.
Gateway Rd to Menno By
Expected Duration: 03 May 2024 - 27 May 2024
Eastbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Cottonwood Rd to Elizabeth Rd
Expected Duration: 08 May 2024 - 10 May 2024
Northbound curb lane, closed for street construction/maintenance.
Elizabeth Rd to Prosper St
Expected Duration: 05 May 2024 - 17 May 2024
Northbound curb lane, northbound median lane, east side sidewalk, closed for electrical/lighting/signals work. Two-way traffic maintained on southbound lanes.
Logan Av to Dufferin Av
Expected Duration: 21 Nov 2023 - 21 Nov 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk.
Wellington Av to Sargent Av
Expected Duration: 04 May 2024 - 31 May 2024
Southbound curb lane, west side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Newton Av to Sly Dr
Expected Duration: 22 Apr 2024 - 31 May 2024
Westbound curb lane, closed for water work.
Casey St to Fisher St
Expected Duration: 13 May 2024 - 30 Jun 2024
Eastbound curb lane, closed for street construction/maintenance.
Tulip Rd to Viola St
Expected Duration: 16 Apr 2024 - 24 May 2024
Northbound curb lane, closed for water work.
Bannatyne Av to McDermot Av
Expected Duration: 15 May 2024 - 18 May 2024
Complete closure of all southbound lanes, west side sidewalk, east side sidewalk, closed for film production or special event/festival.
Bannatyne Av to Notre Dame Av
Expected Duration: 14 May 2024 - 14 May 2024
Southbound median lane, east side sidewalk, closed for film production or special event/festival.
Corydon Av to Grosvenor Av
Expected Duration: 07 May 2024 - 09 May 2024
Northbound median lane, closed for sewer work.
Grant Av to Mathers Av
Expected Duration: 25 Apr 2024 - 17 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for water work.
Hargrave St to Navy Wy
Expected Duration: 06 May 2024 - 31 Aug 2024
Eastbound median lane, eastbound protected bike lane, north side sidewalk, closed for street construction/maintenance.
Pandora Av W to Cedargrove Cr
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Northbound curb lane, closed for communications work.
Yale Av to Harvard Av
Expected Duration: 11 May 2024 - 11 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for film production or special event/festival.
At Newmarket Bv
Expected Duration: 08 May 2024 - 15 May 2024
Southbound median lane, closed for water work. Lanes will be open for morning and afternoon rush hours.
Adelaide St to Princess St
Expected Duration: 13 Dec 2023 - 12 Dec 2024
Westbound median lane, closed for loading/unloading.
Gertie St to Harriet St
Expected Duration: 15 Apr 2024 - 28 Jun 2024
South side sidewalk, closed for building construction/maintenance.
King St to Princess St
Expected Duration: 24 Apr 2024 - 24 May 2024
Waterfront Dr to Rorie St
Expected Duration: 06 Sep 2022 - 30 Sep 2024
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Dunkirk Dr to St Marys Rd
Expected Duration: 18 Apr 2024 - 13 May 2024
Westbound curb lane, north side sidewalk, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Marlton Cr to Oakdale Dr
Expected Duration: 22 Apr 2024 - 30 Jun 2025
Change in parking restrictions due to building construction. No lane closures.
Ferrier St to End
Expected Duration: 29 Apr 2024 - 15 Jul 2024
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for street construction/maintenance.
St Annes Rd to St George Rd
Expected Duration: 09 May 2024 - 27 May 2024
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Eager Cr to Cullen Dr
Expected Duration: 09 May 2024 - 09 May 2024
Complete closure of all westbound lanes, closed for sewer work.
Robson St to Atwood St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Westbound curb lane, closed for communications work.
Pembina Hw to River Rd
Expected Duration: 05 Feb 2024 - 28 Feb 2025
Eastbound shoulder lane, closed for sewer work.
Centre St to Park East Dr
Expected Duration: 06 Jan 2023 - 01 Jun 2025
South side sidewalk, closed for building construction/maintenance.
Centre St to Park West Dr
Expected Duration: 22 Apr 2024 - 26 Apr 2024
Eastbound curb lane, closed for building construction/maintenance.
McKenzie St to McGregor St
Expected Duration: 08 May 2024 - 22 May 2024
South side sidewalk, closed for water work.
Cherrywood Rd to Willow Creek Rd
Expected Duration: 05 May 2024 - 10 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
Carlton St to Osborne St N
Expected Duration: 29 Apr 2024 - 26 Jul 2024
Westbound middle lane, westbound curb lane, closed for street construction/maintenance.
Spence St to Furby St
Expected Duration: 29 Apr 2024 - 13 May 2024
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Young St to Spence St
Expected Duration: 14 May 2024 - 24 May 2024
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Ness Av to Silver Av
Expected Duration: 24 Apr 2024 - 30 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for sewer work.
Sinawik By to Ainslie St
Expected Duration: 17 Jul 2023 - 31 May 2024
North side sidewalk, closed for building construction/maintenance.
Einarson Av to Portage Av
Expected Duration: 24 Oct 2023 - 31 Dec 2024
Southbound parking lane, west side sidewalk, closed due to sidewalk collapse.
Railway St to Plymouth St
Expected Duration: 11 May 2024 - 11 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, closed for film production or special event/festival.
Salter St to Aikins St
Expected Duration: 26 Apr 2024 - 17 May 2024
Eastbound curb lane, closed for water work.
Lincoln Av to William Av W
Expected Duration: 15 May 2024 - 23 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, east side sidewalk, closed for film production or special event/festival.
Graham Av to St Mary Av
Expected Duration: 09 Jul 2018 - 01 Sep 2024
Back lane/public lane, west side sidewalk, closed for building construction/maintenance.
York Av to Assiniboine Av
Expected Duration: 06 May 2024 - 18 Oct 2024
Southbound curb lane, southbound median lane, closed for street construction/maintenance.
At Westwood Dr
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for street construction/maintenance.
Coatstone Dr to Hazelton Dr
Expected Duration: 14 May 2024 - 21 May 2024
Southbound curb lane, closed for landscaping/tree maintenance.
At Atwood St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Northbound curb lane, closed for communications work.
Academy Rd to Kingsway
Expected Duration: 13 May 2024 - 15 May 2024
Southbound curb lane, closed for sewer work.
Jacob's Creek Rd to Bison Dr
Expected Duration: 09 May 2024 07:00 a.m. - 09 May 2024 03:30 p.m.
Complete closure of all northbound lanes, closed for building construction/maintenance.
Jacob's Creek Rd to Bison Dr
Expected Duration: 28 Feb 2024 - 30 Aug 2024
Northbound curb lane, closed for building construction/maintenance.
Jacob's Creek Rd to Bison Dr
Expected Duration: 14 May 2024 07:00 a.m. - 14 May 2024 03:30 p.m.
Complete closure of all northbound lanes, closed for building construction/maintenance.
Gaylene Pl to Lake Village Rd
Expected Duration: 25 Mar 2024 - 12 May 2024
Westbound curb lane, north side sidewalk, closed for sewer work.
Rh Wy to University Cr
Expected Duration: 06 May 2024 - 16 May 2024
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Aberdeen Av to Boyd Av
Expected Duration: 17 May 2024 - 28 Jun 2024
Complete closure of all southbound lanes, complete closure of all northbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Henderson Hw to Kildonan Dr
Expected Duration: 09 May 2024 - 27 May 2024
Eastbound curb lane, westbound curb lane, closed for sewer work.
Roch St to Rothesay St
Expected Duration: 08 May 2024 - 27 May 2024
Complete closure of all eastbound lanes, westbound curb lane, south side sidewalk, closed for water work.
Dufresne Av to End
Expected Duration: 25 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Rose Lake Ct to Bracebridge Rd
Expected Duration: 05 May 2024 - 10 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, closed for film production or special event/festival.
Valley Brook Rd to Willow Creek Rd
Expected Duration: 05 May 2024 - 10 May 2024
Westbound curb lane, closed for film production or special event/festival.
Hamelin St to Trottier By
Expected Duration: 06 May 2024 09:00 a.m. - 20 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Main St to O'Meara St
Expected Duration: 08 May 2024 - 31 May 2024
Eastbound curb lane, closed for sewer work.
Daly St S to Montgomery Av
Expected Duration: 04 Mar 2024 - 28 Jun 2024
Complete closure of all eastbound lanes, south side sidewalk, closed for street construction/maintenance.
Eccles St to Casey St
Expected Duration: 13 May 2024 - 31 Jul 2024
Westbound curb lane, closed for street construction/maintenance.
Pembina Hw to Hudson St
Expected Duration: 13 May 2024 - 13 May 2024
Westbound curb lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Wellington Cr to McMillan Av
Expected Duration: 18 Sep 2023 - 30 Sep 2024
West side sidewalk, closed for building construction/maintenance.
Rosedale Av to Jubilee Av
Expected Duration: 09 May 2024 - 09 May 2024
Northbound curb lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Silver Av to St Matthews Av
Expected Duration: 06 May 2024 - 29 Jun 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Memorial Bv to St Mary Av
Expected Duration: 11 Nov 2023 - 28 Jun 2024
Complete closure of all southbound lanes, complete closure of all northbound lanes, west side sidewalk, closed for street construction/maintenance.
Meadowbank Rd to McGillivray Bv
Expected Duration: 26 Apr 2024 - 10 May 2024
Northbound curb lane, closed for sewer work.
Louelda St to London St
Expected Duration: 03 May 2024 09:00 a.m. - 20 May 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Centre St to Park West Dr
Expected Duration: 01 May 2024 - 07 May 2024
Eastbound median lane, closed for building construction/maintenance.
At Arrowwood Dr S
Expected Duration: 16 Apr 2024 - 24 May 2024
Eastbound curb lane, south side sidewalk, closed for water work.
Edgeland Bv to Tuxedo Av
Expected Duration: 23 May 2023 - 01 Nov 2024
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Pinehurst Cr to Hagen Dr
Expected Duration: 08 May 2024 - 29 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for water work.
Pipeline Rd to McPhillips St
Expected Duration: 18 Apr 2024 - 19 Aug 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for street construction/maintenance.
Bridgecrest Dr to End
Expected Duration: 07 May 2024 - 07 May 2024
Southbound curb lane, closed for sewer work.
At Creek Bend Rd
Expected Duration: 01 Mar 2024 - 01 Sep 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for street construction/maintenance.
At Langside St
Expected Duration: 13 May 2024 - 13 May 2024
Eastbound median lane, eastbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Plinguet St to Messier St
Expected Duration: 09 May 2024 09:00 a.m. - 15 May 2024 03:00 p.m.
Southbound curb lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Van Bellegham Av to Panet Rd
Expected Duration: 13 May 2024 - 17 May 2024
De La Morenie St to Des Meurons St
Expected Duration: 06 May 2024 09:00 a.m. - 31 Aug 2024 03:00 p.m.
Eastbound curb lane, east side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Bertrand St to Marion St
Expected Duration: 12 May 2024 - 28 Jun 2024
Northbound curb lane, northbound median lane, southbound curb lane, southbound median lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
De La Cathedrale Av to Hamel Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Back lane/public lane, closed for street construction/maintenance.
De La Cathedrale Av to Hamel Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Southbound curb lane, closed for street construction/maintenance.
Ellice Av to Portage Av
Expected Duration: 19 May 2024 - 19 May 2024
Southbound middle lane, southbound median lane, southbound middle lane 2, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Roselawn By to Rothesay St
Expected Duration: 06 May 2024 - 27 May 2024
Westbound curb lane, closed for sewer work.
End to St Pierre St
Expected Duration: 13 May 2024 - 31 Jul 2024
Westbound curb lane, closed for street construction/maintenance.
Orange St to Notre Dame Av
Expected Duration: 08 May 2024 09:00 a.m. - 09 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Orange St to Notre Dame Av
Expected Duration: 13 May 2024 09:00 a.m. - 13 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Bournais Dr to Lagimodiere Bv
Expected Duration: 20 May 2024 09:00 a.m. - 20 Jun 2024 03:00 p.m.
Northbound shoulder lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Dawson Rd N to Panet Rd
Expected Duration: 13 May 2024 - 17 May 2024
Complete closure of all eastbound lanes, closed for street construction/maintenance.
Panet Rd to Holden Av
Expected Duration: 20 May 2024 09:00 a.m. - 20 Jun 2024 03:00 p.m.
Eastbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
St Joseph St to Langevin St
Expected Duration: 21 May 2024 - 31 Jul 2024
North side sidewalk, closed for building construction/maintenance.
Fermor Av to St Vital Bridge
Expected Duration: 01 Mar 2023 - 31 Oct 2024
Northbound curb lane, northbound median lane, southbound curb lane, southbound median lane, southbound left turn storage lane, southbound left turn storage lane 2, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Derek St to Edderton By
Expected Duration: 13 May 2024 - 21 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance.
Ian Pl to De Graff Pl
Expected Duration: 06 May 2024 - 27 May 2024
Westbound curb lane, north side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Assiniboine Av to York Av
Expected Duration: 06 May 2024 - 26 Jul 2024
Northbound curb lane, northbound median lane, closed for street construction/maintenance.
Cumberland Av to Sargent Av
Expected Duration: 13 May 2024 - 20 May 2024
Complete closure of all southbound lanes, west side sidewalk, closed for building construction/maintenance.
St Mary Av to Graham Av
Expected Duration: 11 Apr 2024 - 30 May 2024
Northbound curb lane, east side sidewalk, closed for building construction/maintenance.
Ellesmere Av to Harrowby Av
Expected Duration: 13 May 2024 - 15 May 2024
Southbound curb lane, closed for sewer work.
Keewatin St to Juba St
Expected Duration: 25 Apr 2024 - 17 May 2024
Back lane/public lane, closed for water work.
Banning St to Garfield St N
Expected Duration: 06 May 2024 - 17 May 2024
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance.
Century St to St James St
Expected Duration: 13 May 2024 - 29 May 2024
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
Raleigh St to Dundoon St
Expected Duration: 02 May 2024 - 20 May 2024
Westbound curb lane, north side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Goulet St to Marion St
Expected Duration: 12 May 2024 - 28 Jun 2024
Southbound curb lane, northbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Ellice Av to St Matthews Av
Expected Duration: 16 May 2024 - 22 May 2024
Southbound curb lane, southbound median lane, east side sidewalk, closed for film production or special event/festival.
Ellice Av to St Matthews Av
Expected Duration: 01 May 2024 - 09 May 2024
Southbound curb lane, southbound median lane, east side sidewalk, closed for film production or special event/festival.
Wellington Av to Ellice Av
Expected Duration: 14 May 2024 09:00 a.m. - 17 May 2024 03:00 p.m.
Southbound median lane, southbound middle lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Kildonan Dr to Appleton St
Expected Duration: 29 Apr 2024 - 31 May 2024
Eastbound median lane, westbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Traverse Av to Braemar Av
Expected Duration: 06 May 2024 - 27 May 2024
Back lane/public lane, closed for street construction/maintenance.
Isbister St to Buchanan Bv
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
At Fermor Av
Expected Duration: 06 May 2024 09:00 a.m. - 10 May 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Churchill Dr to Montgomery Av
Expected Duration: 13 May 2024 - 31 Jul 2024
Northbound curb lane, closed for street construction/maintenance.
Oakwood Av to Arnold Av
Expected Duration: 13 May 2024 - 31 Jul 2024
Northbound curb lane, closed for street construction/maintenance.
Broadway to Assiniboine Av
Expected Duration: 24 Nov 2021 - 31 May 2024
East side sidewalk, closed for building construction/maintenance.
Cumberland Av to Sargent Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Cumberland Av to Sargent Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Back lane/public lane, closed for street construction/maintenance.
Trudell By to End
Expected Duration: 08 May 2024 - 31 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Bronx Av to Blantyre Av
Expected Duration: 02 May 2024 - 27 May 2024
Northbound curb lane, southbound curb lane, east side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Chancellor Dr to End
Expected Duration: 05 Apr 2024 - 01 Jul 2024
Southbound curb lane, closed for building construction/maintenance.
Bournais Dr to Dzyndra Cr
Expected Duration: 08 May 2024 - 24 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Nassau St N to Osborne St
Expected Duration: 25 Oct 2022 - 01 Jun 2024
South side sidewalk, closed for building construction/maintenance.
Osborne St to Nassau St N
Expected Duration: 02 Jan 2024 - 31 May 2024
Complete closure of all westbound lanes, eastbound median lane, closed for building construction/maintenance. Lanes will be open for afternoon rush hour.
Hooper Pl to Pentland St
Expected Duration: 06 May 2024 - 27 May 2024
Eastbound curb lane, closed for water work.
Springlea Pa to Pentland St
Expected Duration: 02 May 2024 09:00 a.m. - 20 May 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
McLeod Av to Oakland Av
Expected Duration: 07 May 2024 - 27 May 2024
Eastbound curb lane, closed for sewer work.
St Mary Av to Portage Av
Expected Duration: 14 May 2024 - 30 Aug 2024
Northbound curb lane, closed for building construction/maintenance.
St Mary Av to Portage Av
Expected Duration: 11 Jul 2023 - 28 Jun 2024
East side sidewalk, closed for building construction/maintenance.
Youville St to Traverse Av
Expected Duration: 12 May 2024 - 28 Jun 2024
Westbound median lane, westbound curb lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance.
Fort St to Garry St
Expected Duration: 15 May 2024 09:30 a.m. - 16 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for communications work.
At Montrose St
Expected Duration: 09 May 2024 - 28 Jun 2024
Elmhurst Rd to Laxdal Rd
Expected Duration: 09 May 2024 - 09 May 2024
Eastbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Pembina Hw to Lilac St
Expected Duration: 10 May 2024 09:00 a.m. - 13 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Rockwood St to Stafford St
Expected Duration: 21 May 2024 - 27 Sep 2024
Eastbound curb lane, eastbound median lane, eastbound left turn storage lane, westbound curb lane, westbound median lane, westbound left turn storage lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance.
Des Meurons St to St Marys Rd
Expected Duration: 29 Apr 2024 - 13 May 2024
Westbound curb lane, north side sidewalk, closed for gas work. Lanes will be open for morning and afternoon rush hours.
At Scotland Av
Expected Duration: 09 May 2024 - 28 Jun 2024
Des Meurons St to Youville St
Expected Duration: 06 May 2024 - 31 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, closed for sewer work.
Des Meurons St to De La Morenie St
Expected Duration: 06 May 2024 09:00 a.m. - 31 Aug 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
St Jean Baptiste St to Des Meurons St
Expected Duration: 06 May 2024 - 31 Aug 2024
Eastbound curb lane, closed for street construction/maintenance.
Gateway Rd to Grey St
Expected Duration: 06 May 2024 - 20 May 2024
Back lane/public lane, closed for sewer work.
Roch St to Brazier St
Expected Duration: 13 May 2024 - 03 Jun 2024
Westbound curb lane, closed for gas work.
Hargrave Pl to Broadway
Expected Duration: 28 Feb 2022 - 30 May 2024
East side sidewalk, closed for building construction/maintenance.
At Sparling Av
Expected Duration: 09 May 2024 - 09 May 2024
Northbound curb lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
McGregor St to Main St
Expected Duration: 21 May 2024 - 13 Sep 2024
Westbound curb lane, north side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Stafford St to Ruskin Rw
Expected Duration: 11 May 2024 - 11 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for film production or special event/festival.
Pennefather St to Raleigh St
Expected Duration: 02 May 2024 - 20 May 2024
Eastbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Cobourg Av to Noble Av
Expected Duration: 13 May 2024 - 03 Jun 2024
Southbound curb lane, west side sidewalk, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Devon Av to McLeod Av
Expected Duration: 08 May 2024 09:00 a.m. - 14 May 2024 03:00 p.m.
Southbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Douglas Av to Stuart Av
Expected Duration: 07 May 2024 09:00 a.m. - 09 May 2024 03:00 p.m.
Northbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Harbison Av W to Larsen Av
Expected Duration: 10 May 2024 - 27 May 2024
Northbound curb lane, closed for water work.
Hawthorne Av to Cheriton Av
Expected Duration: 07 May 2024 09:00 a.m. - 27 May 2024 03:00 p.m.
Southbound curb lane, west side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Kildonan Dr to Sydney Av
Expected Duration: 09 May 2024 09:00 a.m. - 27 May 2024 03:00 p.m.
Northbound median lane, southbound median lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Munroe Av to Winterton Av
Expected Duration: 10 May 2024 09:00 a.m. - 27 May 2024 03:00 p.m.
Southbound curb lane, west side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Oakland Av to Cheriton Av
Expected Duration: 07 May 2024 - 27 May 2024
Northbound middle lane, northbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Oakview Av to Dunrobin Av
Expected Duration: 09 May 2024 - 27 May 2024
Southbound curb lane, west side sidewalk, closed for water work.
Stuart Av to Douglas Av
Expected Duration: 02 May 2024 09:00 a.m. - 24 May 2024 03:00 p.m.
Southbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Whellams Ln to Chief Peguis Tl
Expected Duration: 14 May 2024 09:00 a.m. - 24 May 2024 03:00 p.m.
Northbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Birch Gr to End
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Southbound curb lane, closed for communications work.
Caton St to Niverville Av
Expected Duration: 01 May 2024 - 13 May 2024
Back lane/public lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Wellington Av to Sargent Av
Expected Duration: 07 May 2024 - 24 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for water work.
Portsmouth Bv to Coleraine Cr
Expected Duration: 24 Apr 2024 - 13 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Roblin Bv to Betsworth Av
Expected Duration: 07 May 2024 - 15 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, west side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Church Av to Sheppard St
Expected Duration: 08 May 2024 - 27 May 2024
Southbound curb lane, west side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Portage Av to St Matthews Av
Expected Duration: 16 Apr 2024 - 17 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for sewer work.
Yarwood Av to Notre Dame Av
Expected Duration: 17 Apr 2024 - 07 Jun 2024
Northbound curb lane, east side sidewalk, closed for water work.
At Mallard Wy
Expected Duration: 08 May 2024 - 29 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, closed for water work.
Kildonan Dr to Grandview St
Expected Duration: 29 Apr 2024 - 31 May 2024
Westbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Centre St to Park West Dr
Expected Duration: 09 Nov 2022 - 30 Nov 2024
North side sidewalk, closed for building construction/maintenance.
King St to Main St
Expected Duration: 04 Jan 2022 - 31 Dec 2024
Eastbound median lane, closed for loading/unloading.
Princess St to King St
Expected Duration: 16 May 2024 - 18 May 2024
Complete closure of all eastbound lanes, north side sidewalk, south side sidewalk, closed for film production or special event/festival.
Cockburn St N to Hugo St N
Expected Duration: 07 Apr 2024 - 13 May 2024
Eastbound curb lane, closed for water work.
Osborne St to Pembina Hw
Expected Duration: 13 May 2024 - 31 May 2024
Eastbound curb lane, eastbound median lane, westbound curb lane, westbound median lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance.
Scurfield Bv to Rothwell Rd
Expected Duration: 13 May 2024 07:00 a.m. - 17 May 2024 07:00 p.m.
Northbound curb lane, northbound median lane, northbound left turn storage lane, northbound right turn (yield) lane, northbound left turn storage lane 2, northbound middle lane, closed for street construction/maintenance.
St Mary Av to York Av
Expected Duration: 10 Apr 2023 - 31 May 2024
West side sidewalk, closed for building construction/maintenance.
York Av to Assiniboine Av
Expected Duration: 06 May 2024 - 26 Jul 2024
Southbound curb lane, southbound median lane, closed for street construction/maintenance.
Silver Av to St Matthews Av
Expected Duration: 10 May 2024 - 14 May 2024
Northbound curb lane, closed for film production or special event/festival.
Atwood St to Robson St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Eastbound curb lane, closed for communications work.
End to Hawthorne Av
Expected Duration: 29 Apr 2024 - 31 May 2024
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Brazier St to Roch St
Expected Duration: 09 May 2024 - 27 May 2024
Eastbound curb lane, south side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Molson St to Louelda St
Expected Duration: 03 May 2024 09:00 a.m. - 20 May 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Raleigh St to Hershey St
Expected Duration: 02 May 2024 - 27 May 2024
Eastbound curb lane, westbound curb lane, north side sidewalk, south side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Notre Dame Av to Dublin Av
Expected Duration: 06 May 2024 09:00 a.m. - 09 May 2024 03:00 p.m.
Southbound curb lane, west side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Sargent Av to Ellice Av
Expected Duration: 11 May 2024 - 11 May 2024
Southbound curb lane, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
McDermot Av to Bannatyne Av
Expected Duration: 17 May 2024 - 18 May 2024
Northbound curb lane, east side sidewalk, closed for film production or special event/festival.
McDermot Av to Bannatyne Av
Expected Duration: 15 May 2024 - 16 May 2024
Northbound curb lane, east side sidewalk, closed for film production or special event/festival.
Notre Dame Av to McDermot Av
Expected Duration: 07 May 2024 - 11 May 2024
Northbound median lane, northbound curb lane, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
William Av to James Av
Expected Duration: 29 Apr 2024 - 10 May 2024
Northbound median lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
William Av to James Av
Expected Duration: 18 Mar 2024 - 17 May 2024
West side sidewalk, closed for building construction/maintenance.
At De Fehr St
Expected Duration: 08 May 2024 - 27 May 2024
Eastbound curb lane, south side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Ramp Dunkirk SB to Kingston EB to Ramp Kingston to Dunkirk NB
Expected Duration: 21 May 2024 - 28 May 2024
Complete closure of all eastbound lanes, south side sidewalk, closed for street construction/maintenance.
At Cropo By
Expected Duration: 25 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Monson St to Raleigh St
Expected Duration: 30 Apr 2024 - 20 May 2024
Eastbound curb lane, closed for water work.
Paterson St to East Mint Pl
Expected Duration: 26 Apr 2024 - 24 May 2024
Southbound median lane, closed for water work.
Cumberland Av to Sargent Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Ellice Av to Sargent Av
Expected Duration: 21 May 2024 - 13 Sep 2024
Back lane/public lane, closed for street construction/maintenance.
Sargent Av to Ellice Av
Expected Duration: 06 May 2024 - 07 May 2024
Day St to Wabasha St
Expected Duration: 22 Apr 2024 - 24 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for electrical/lighting/signals work.
St David Rd to St Marys Rd
Expected Duration: 23 May 2024 - 25 May 2024
Eastbound curb lane, closed for sewer work.
Alexander Av to Galt Av
Expected Duration: 08 May 2024 - 08 May 2024
Northbound curb lane, closed for film production or special event/festival.
Princess St to King St
Expected Duration: 09 May 2024 - 09 May 2024
Eastbound curb lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Ryan St to Bannister Rd
Expected Duration: 06 May 2024 - 09 May 2024
Eastbound curb lane, closed for communications work.
Mill St to Rorie St
Expected Duration: 23 May 2024 - 24 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Moncton Av to Simpson Av
Expected Duration: 03 May 2024 09:00 a.m. - 20 May 2024 03:00 p.m.
Northbound curb lane, east side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Arlington St to Parr St
Expected Duration: 03 May 2024 - 17 May 2024
South side sidewalk, closed for water work.
McKenzie St to McGregor St
Expected Duration: 02 May 2024 - 23 May 2024
South side sidewalk, closed for water work.
Salter St to Aikins St
Expected Duration: 23 May 2023 - 24 Nov 2024
Eastbound curb lane, closed for building construction/maintenance.
Graham Av to St Mary Av
Expected Duration: 07 May 2024 - 27 May 2024
Southbound curb lane, closed for sewer work.
Logan Av to Higgins Av
Expected Duration: 20 Oct 2023 - 20 Oct 2024
Back lane/public lane, closed for building construction/maintenance.
Leila Av to Roshni By
Expected Duration: 06 May 2024 - 20 May 2024
Northbound curb lane, southbound curb lane, east side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Tache Av to Kenny St
Expected Duration: 06 May 2024 - 06 May 2024
Eastbound curb lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Logan Av to Austin St
Expected Duration: 01 May 2024 - 01 May 2025
Northbound curb lane, east side sidewalk, closed for building construction/maintenance.
Rupert Av to Pacific Av
Expected Duration: 14 May 2024 - 31 May 2024
Northbound curb lane, east side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Gateway Rd to Grey St
Expected Duration: 12 Apr 2024 - 13 May 2024
South side sidewalk, closed for water work.
Brazier St to Roch St
Expected Duration: 13 May 2024 - 03 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for gas work.
Ellice Av to St Matthews Av
Expected Duration: 12 May 2024 - 12 May 2024
Southbound median lane, southbound middle lane, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Portage Av to Broadway
Expected Duration: 10 Jul 2023 - 01 Dec 2025
West side sidewalk, closed for building construction/maintenance.
St Matthews Av to Portage Av
Expected Duration: 12 May 2024 - 12 May 2024
Southbound curb lane, southbound middle lane, southbound painted bike lane, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Westminster Av to Wolseley Av
Expected Duration: 16 Apr 2024 - 13 May 2024
Back lane/public lane, closed for street construction/maintenance.
At Montrose St
Expected Duration: 09 May 2024 - 28 Jun 2024
Jones St to Cochrane St
Expected Duration: 02 May 2024 - 27 May 2024
South side sidewalk, closed for water work.
Harkness St to Queen Elizabeth Way
Expected Duration: 06 May 2024 - 09 May 2024
Eastbound median lane, north side sidewalk, closed for loading/unloading.
Harkness St to Queen Elizabeth Way
Expected Duration: 10 May 2024 09:00 a.m. - 10 May 2024 03:00 p.m.
Eastbound median lane, eastbound middle lane, north side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Albert St to Main St
Expected Duration: 14 May 2024 - 14 May 2024
Eastbound median lane, north side sidewalk, closed for film production or special event/festival.
Arthur St to Albert St
Expected Duration: 14 May 2024 - 14 May 2024
Back lane/public lane, closed for film production or special event/festival.
Alpha St to Brady Rd
Expected Duration: 09 May 2024 - 10 May 2024
Westbound shoulder lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Post St to Kenaston Bv
Expected Duration: 26 Apr 2024 - 31 May 2024
Eastbound median lane, eastbound left turn storage lane, closed for sewer work.
Jefferson Av to Leila Av
Expected Duration: 13 May 2024 - 01 Nov 2024
Complete closure of all northbound lanes, east side sidewalk, closed for street construction/maintenance.
Semple Av to Partridge Av
Expected Duration: 08 Jan 2024 - 14 Jun 2024
Complete closure of all northbound lanes, closed for sewer work.
Parkway Pl to Cranlea Pa
Expected Duration: 06 May 2024 - 27 May 2024
Eastbound curb lane, closed for water work.
Golspie St to Durness By
Expected Duration: 07 May 2024 - 27 May 2024
Westbound curb lane, closed for water work.
Sargent Av to Cumberland Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Back lane/public lane, west side sidewalk, closed for street construction/maintenance.
Storie Rd to Swailes Av
Expected Duration: 07 May 2024 09:00 a.m. - 24 May 2024 03:00 p.m.
Southbound curb lane, west side sidewalk, closed for gas work. Lanes will be open for morning and afternoon rush hours.
York Av to Broadway
Expected Duration: 06 May 2024 - 26 Jul 2024
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Dublin Av to Saskatchewan Av
Expected Duration: 06 May 2024 - 31 Jul 2024
Complete closure of all southbound lanes, closed for street construction/maintenance.
Donald St to Smith St
Expected Duration: 21 May 2024 09:00 a.m. - 21 May 2024 03:00 p.m.
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Brazier St to Henderson Hw
Expected Duration: 13 May 2024 - 03 Jun 2024
Westbound curb lane, north side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Panet Rd to Dawson Rd N
Expected Duration: 26 Apr 2024 09:00 a.m. - 24 May 2024 03:00 p.m.
Westbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Antrim Rd to Tu Pelo Av
Expected Duration: 29 Apr 2024 - 17 May 2024
Complete closure of all southbound lanes, closed for water work. Lanes will be open for morning and afternoon rush hours.
Mathers Av to Grant Av
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for street construction/maintenance.
Charleswood Bridge to Portage Av
Expected Duration: 06 May 2024 07:00 a.m. - 10 May 2024 07:00 p.m.
Northbound curb lane, northbound median lane, northbound left turn storage lane, northbound right turn (yield) lane, closed for street construction/maintenance.
Ness Av to Bruce Av
Expected Duration: 06 May 2024 09:00 a.m. - 10 May 2024 07:00 p.m.
Southbound median lane, southbound curb lane, closed for street construction/maintenance.
Pinewood Dr to Portage Av
Expected Duration: 07 May 2024 - 10 May 2024
Northbound right turn (yield) lane, east side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Mabel St to Fisher St
Expected Duration: 17 May 2024 - 31 May 2024
Westbound curb lane, closed for loading/unloading.
Watt St to Stadacona St
Expected Duration: 13 May 2024 09:00 a.m. - 03 Jun 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Carlaw Av to Hethrington Av
Expected Duration: 04 May 2024 - 18 May 2024
Back lane/public lane, closed for sewer work.
Taylor Av to Hector Av
Expected Duration: 08 Apr 2024 - 10 May 2024
Northbound median lane, southbound median lane, east side sidewalk, closed for sewer work.
Berry St to Marjorie St
Expected Duration: 25 Apr 2024 09:00 a.m. - 10 May 2024 03:00 p.m.
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Hampton St to Berry St
Expected Duration: 07 May 2024 09:00 a.m. - 14 May 2024 03:00 p.m.
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Hampton St to Marjorie St
Expected Duration: 02 May 2024 09:00 a.m. - 10 May 2024 03:00 p.m.
Eastbound curb lane, westbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Linwood St to Albany St
Expected Duration: 01 May 2024 - 13 May 2024
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Marjorie St to Berry St
Expected Duration: 06 May 2024 - 10 May 2024
Eastbound curb lane, closed for communications work.
St Marys Rd to Stradbrook Av
Expected Duration: 15 May 2024 09:00 a.m. - 16 May 2024 03:00 p.m.
Northbound curb lane, northbound median lane, northbound middle lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Sherburn St to Lipton St
Expected Duration: 03 May 2024 - 31 May 2024
Eastbound curb lane, closed for water work.
Sherburn St to McPhillips St
Expected Duration: 22 Apr 2024 - 31 May 2024
Westbound curb lane, north side sidewalk, closed for water work.
Hatcher Rd to Rougeau Av
Expected Duration: 30 Apr 2024 - 17 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
At Ashford Dr
Expected Duration: 02 May 2024 - 16 May 2024
East side sidewalk, closed for water work.
Roblin Bv to Grant Av
Expected Duration: 22 Apr 2024 - 30 Jun 2025
Change in parking restrictions due to building construction. No lane closures.
Eccles St to Darling St
Expected Duration: 13 May 2024 - 31 Jul 2024
Eastbound curb lane, closed for street construction/maintenance.
Granite Wy to Osborne St
Expected Duration: 14 May 2024 09:00 a.m. - 14 May 2024 03:00 p.m.
Northbound curb lane, southbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Baltimore Rd to Oakwood Av
Expected Duration: 23 May 2024 - 23 May 2024
Northbound curb lane, closed for film production or special event/festival.
Baltimore Rd to Oakwood Av
Expected Duration: 11 May 2024 - 12 May 2024
Northbound curb lane, closed for film production or special event/festival.
Baltimore Rd to Rathgar Av
Expected Duration: 15 May 2024 - 15 May 2024
Northbound curb lane, closed for film production or special event/festival.
Gertrude Av to McMillan Av
Expected Duration: 20 Apr 2023 - 01 Jun 2024
West side sidewalk, closed for building construction/maintenance.
Gertrude Av to McMillan Av
Expected Duration: 21 Oct 2022 06:00 a.m. - 01 Jun 2024 03:00 p.m.
Southbound curb lane, west side sidewalk, closed for loading/unloading. Lanes will be open for afternoon rush hour.
Jessie Av to Mulvey Av
Expected Duration: 11 May 2024 08:00 a.m. - 11 May 2024 04:00 p.m.
Southbound curb lane, southbound median lane, northbound median lane, northbound curb lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Wardlaw Av to Stradbrook Av
Expected Duration: 12 Apr 2023 - 01 Jun 2024
East side sidewalk, closed for building construction/maintenance.
Broadway to York Av
Expected Duration: 06 May 2024 - 26 Jul 2024
Northbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Roch St to Watt St
Expected Duration: 13 May 2024 - 03 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for sewer work.
King St to Princess St
Expected Duration: 16 May 2024 - 18 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for film production or special event/festival.
Lily St to Martha St
Expected Duration: 08 May 2024 - 08 May 2024
Complete closure of all westbound lanes, north side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Main St to King St
Expected Duration: 16 May 2024 - 18 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for film production or special event/festival.
Main St to Martha St
Expected Duration: 14 May 2024 - 31 May 2024
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Ruskin Rw to Wellington Cr
Expected Duration: 11 May 2024 - 11 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, south side sidewalk, closed for film production or special event/festival.
Moroz St to Plessis Rd
Expected Duration: 09 May 2024 - 15 May 2024
Westbound curb lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Brewer Cr to Keenleyside St
Expected Duration: 03 May 2024 09:00 a.m. - 20 May 2024 03:00 p.m.
Northbound curb lane, southbound curb lane, southbound painted bike lane, west side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Notre Dame Av to McDermot Av
Expected Duration: 09 May 2024 - 09 May 2024
Northbound curb lane, east side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Adamar Rd to Plaza Dr
Expected Duration: 08 May 2024 - 31 May 2024
Southbound left turn storage lane, southbound median lane, southbound middle lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Bison Dr to Bairdmore Bv
Expected Duration: 19 Sep 2022 - 31 May 2024
West side sidewalk, closed for building construction/maintenance.
Bison Dr to Dalhousie Dr
Expected Duration: 02 May 2024 - 09 May 2024
Southbound curb lane, west side sidewalk, closed for sewer work.
Dowker Av to Waller Av
Expected Duration: 07 May 2024 - 31 May 2024
Northbound curb lane, northbound painted bike lane, east side sidewalk, closed for water work.
Jackson Av to Stafford St
Expected Duration: 14 May 2024 - 28 May 2024
Southbound curb lane, closed for street construction/maintenance.
Jubilee Av to Harrow St E
Expected Duration: 15 May 2024 09:00 a.m. - 17 May 2024 03:00 p.m.
Northbound median lane, northbound curb lane, southbound curb lane, southbound median lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Rockman St to Southwood Av
Expected Duration: 09 May 2024 - 17 May 2024
Southbound curb lane, southbound median lane, west side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Southwood Av to North Dr
Expected Duration: 09 May 2024 09:00 a.m. - 17 May 2024 06:00 p.m.
Northbound curb lane, northbound median lane, east side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Gilmore Av to McIvor Av
Expected Duration: 02 May 2024 - 20 May 2024
Northbound curb lane, east side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
End to Pembina Hwy
Expected Duration: 08 May 2024 - 31 May 2024
Westbound curb lane modified to right turn only, due to sewer work.
Kintyre St to St James St
Expected Duration: 11 Apr 2024 09:00 a.m. - 13 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Maryland St to McGee St
Expected Duration: 15 May 2024 - 17 May 2024
Back lane/public lane, closed for street construction/maintenance.
McGee St to Huntleigh St
Expected Duration: 29 Jul 2020 - 30 Jun 2024
North side sidewalk, closed for building construction/maintenance.
Race Track Rd to St Charles St
Expected Duration: 09 May 2024 - 09 May 2024
Eastbound shoulder lane, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Sharp Bv to Duffield St
Expected Duration: 03 Aug 2023 - 30 Nov 2024
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Windham Rd to Rita St
Expected Duration: 06 May 2024 - 10 May 2024
Eastbound median lane, eastbound middle lane, eastbound middle lane 2, eastbound curb lane, eastbound right turn (yield) lane, eastbound left turn storage lane, closed for street construction/maintenance.
Woodhaven Bv to Olive St
Expected Duration: 30 Apr 2024 - 17 May 2024
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Main St to Westbrook St
Expected Duration: 23 Oct 2023 - 31 May 2024
Eastbound curb lane, south side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
At Burrows Av
Expected Duration: 19 Aug 2021 - 30 Sep 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for film production or special event/festival.
James Av to William Av
Expected Duration: 23 Feb 2024 - 21 Jun 2024
East side sidewalk, closed for building construction/maintenance.
James Av to William Av
Expected Duration: 16 May 2024 - 18 May 2024
Southbound median lane, east side sidewalk, closed for film production or special event/festival.
Logan Av to Alexander Av
Expected Duration: 09 May 2024 - 09 May 2024
Southbound median lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
McDermot Av to Notre Dame Av
Expected Duration: 07 May 2024 - 11 May 2024
Southbound median lane, southbound curb lane, west side sidewalk, east side sidewalk, closed for film production or special event/festival.
William Av to Bannatyne Av
Expected Duration: 09 May 2024 09:00 a.m. - 09 May 2024 11:00 p.m.
Southbound median lane, closed for film production or special event/festival. Lanes will be open for morning and afternoon rush hours.
McGregor St to McKenzie St
Expected Duration: 14 May 2024 - 15 May 2024
Westbound curb lane, north side sidewalk, closed for film production or special event/festival.
St Joseph St to Tache Av
Expected Duration: 08 May 2024 - 10 May 2024
Westbound median lane, closed for street construction/maintenance.
Tache Av to St Joseph St
Expected Duration: 02 Jan 2024 - 30 Aug 2024
South side sidewalk, closed for street construction/maintenance.
Brock St to Mathers Av
Expected Duration: 13 May 2024 - 31 Jul 2024
Northbound curb lane, southbound curb lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Grant Av to Queenston By
Expected Duration: 29 Apr 2024 - 31 May 2024
Complete closure of all northbound lanes, east side sidewalk, closed for sewer work.
Portsmouth Bv to Swindon Wy
Expected Duration: 21 May 2024 - 23 May 2024
Westbound curb lane, closed for sewer work.
At Atwood St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Eastbound curb lane, closed for communications work.
Salter St to Main St
Expected Duration: 17 May 2024 - 28 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for street construction/maintenance.
Lagimodiere Bv to Panet Rd
Expected Duration: 10 May 2024 09:00 a.m. - 10 May 2024 03:00 p.m.
Westbound curb lane, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Owen St to Bradley St
Expected Duration: 29 Apr 2024 - 24 May 2024
Eastbound median lane, eastbound curb lane, eastbound middle lane, westbound median lane, westbound middle lane, south side sidewalk, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Clarke St to Bryce St
Expected Duration: 01 May 2024 09:00 a.m. - 19 May 2024 03:00 p.m.
Westbound median lane, westbound middle lane 2, westbound middle lane, south side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Watt St to Elmwood Rd
Expected Duration: 07 May 2024 - 21 May 2024
Back lane/public lane, closed for sewer work.
Cathcart St to Wexford St
Expected Duration: 30 Apr 2024 - 10 May 2024
Eastbound median lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Shenfield Rd to Fairmont Rd
Expected Duration: 13 May 2024 09:00 a.m. - 15 May 2024 03:00 p.m.
Southbound curb lane, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Wildes Ln to Linden Park By
Expected Duration: 01 May 2024 - 22 May 2024
West side sidewalk, closed for water work.
Argue St to Lilac St
Expected Duration: 14 Apr 2024 - 13 May 2024
Back lane/public lane, closed for sewer work.
Rosemount By to Derek St
Expected Duration: 13 May 2024 - 10 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, south side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Hathway Rd to Gilmore Av
Expected Duration: 02 May 2024 09:00 a.m. - 20 May 2024 03:00 p.m.
Southbound curb lane, west side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Headmaster Rw to Strood Av
Expected Duration: 02 May 2024 - 20 May 2024
Southbound curb lane, west side sidewalk, closed for communications work.
Bournais Dr to Hatcher Rd
Expected Duration: 30 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Bournais Dr to Regent Av W
Expected Duration: 08 May 2024 - 31 May 2024
Eastbound median lane, westbound curb lane, south side sidewalk, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Amy St to Lily St
Expected Duration: 14 May 2024 - 31 May 2024
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
King St to Princess St
Expected Duration: 17 May 2024 - 18 May 2024
Complete closure of all westbound lanes, north side sidewalk, south side sidewalk, closed for film production or special event/festival.
Main St to King St
Expected Duration: 16 May 2024 - 18 May 2024
Complete closure of all westbound lanes, north side sidewalk, south side sidewalk, closed for film production or special event/festival.
Main St to Lily St
Expected Duration: 12 May 2024 - 13 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, south side sidewalk, closed for film production or special event/festival.
Aikins St to Main St
Expected Duration: 21 May 2024 - 13 Sep 2024
Westbound curb lane, north side sidewalk, closed for street construction/maintenance.
Grosvenor Av to Kingsway
Expected Duration: 11 May 2024 - 11 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, closed for film production or special event/festival.
At Dalhousie Dr
Expected Duration: 07 May 2024 - 21 May 2024
Eastbound right turn (yield) lane, closed for sewer work.
Ness Av to Bruce Av
Expected Duration: 08 May 2024 - 27 May 2024
Southbound curb lane, west side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Des Hivernants Bv to Blue Sun Dr
Expected Duration: 21 Sep 2023 - 01 May 2025
North side sidewalk, closed for building construction/maintenance.
Cork Av to Leila Av
Expected Duration: 03 May 2024 - 31 May 2024
Southbound curb lane, closed for water work.
Leila Av to Cork Av
Expected Duration: 22 Apr 2024 - 31 May 2024
Northbound curb lane, east side sidewalk, closed for water work.
Furby St to Sherbrook St
Expected Duration: 06 May 2024 - 31 Aug 2024
Back lane/public lane, closed for street construction/maintenance.
Langside St to Furby St
Expected Duration: 06 May 2024 - 31 Aug 2024
Westbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Wall St to Empress St
Expected Duration: 22 Apr 2024 09:00 a.m. - 17 May 2024 03:00 p.m.
Eastbound curb lane, eastbound middle lane, westbound curb lane, westbound middle lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Midland St to Empress St
Expected Duration: 06 May 2024 - 31 Jul 2024
Complete closure of all westbound lanes, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Sherwin Rd to Berry St
Expected Duration: 22 May 2024 - 23 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, north side sidewalk, closed for street construction/maintenance.
Wilton St to Stafford St
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for street construction/maintenance.
Huber St to Inglis St
Expected Duration: 13 May 2024 09:00 a.m. - 14 May 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Salter St to Aikins St
Expected Duration: 10 May 2024 - 17 May 2024
Eastbound curb lane, south side sidewalk, closed for street construction/maintenance.
At De Fehr St
Expected Duration: 07 May 2024 - 27 May 2024
Eastbound curb lane, closed for sewer work.
Wordsworth Wy to Poole Cr
Expected Duration: 01 May 2024 - 20 May 2024
Southbound curb lane, closed for sewer work.
Hutchings St to Church Av
Expected Duration: 09 May 2024 - 09 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Sargent Av to Cumberland Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Northbound median lane, closed for street construction/maintenance.
Logan Av to Alexander Av
Expected Duration: 18 Mar 2024 - 13 May 2024
Northbound shoulder lane, closed for water work.
Louelda St to Moncton Av
Expected Duration: 06 May 2024 - 20 May 2024
Back lane/public lane, closed for sewer work.
Flora Pl to Stella Av
Expected Duration: 21 Nov 2022 - 31 Jul 2024
Northbound curb lane, closed for building construction/maintenance.
At Jewett By
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all southbound lanes, complete closure of all northbound lanes, east side sidewalk, closed for street construction/maintenance.
Portage Av to Ellice Av
Expected Duration: 22 May 2024 09:00 a.m. - 22 May 2024 04:00 p.m.
Northbound median lane, west side sidewalk, closed for communications work.
Portage Av to Wolseley Av
Expected Duration: 06 May 2024 - 31 Aug 2024
Southbound curb lane, closed for street construction/maintenance.
Wellington Av to Ellice Av
Expected Duration: 08 May 2024 - 10 May 2024
Southbound curb lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Forrester Av to Woodydell Av
Expected Duration: 08 May 2024 07:00 a.m. - 15 May 2024 07:00 p.m.
Southbound curb lane, west side sidewalk, closed for street construction/maintenance. Lanes will be open for afternoon rush hour.
Hindley Av to Worthington Av
Expected Duration: 18 Mar 2024 - 31 May 2024
East side sidewalk, closed for building construction/maintenance.
Carlton St to Edmonton St
Expected Duration: 09 Jul 2018 - 01 Sep 2024
Westbound curb lane, westbound painted bike lane, north side sidewalk, closed for building construction/maintenance.
Kennedy St to Vaughan St
Expected Duration: 11 Apr 2023 - 31 May 2024
South side sidewalk, closed for building construction/maintenance.
Kennedy St to Vaughan St
Expected Duration: 06 Oct 2023 - 31 May 2024
Westbound median lane, closed for building construction/maintenance.
Burland Av to Frobisher Rd
Expected Duration: 01 Apr 2024 09:00 a.m. - 24 May 2024 03:00 p.m.
Southbound curb lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Kenny St to Enfield Cr
Expected Duration: 11 May 2024 - 26 May 2024
Northbound curb lane, closed for sewer work.
Morier Av to Vivian Av
Expected Duration: 25 Mar 2024 - 27 May 2024
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
Paul Bv to Christie Rd
Expected Duration: 01 May 2024 - 31 Oct 2024
Northbound shoulder lane, southbound shoulder lane, closed for street construction/maintenance.
Portland Av to St Vital Rd
Expected Duration: 02 May 2024 - 20 May 2024
Southbound curb lane, closed for sewer work.
Empress St to Strathcona St
Expected Duration: 14 May 2024 09:00 a.m. - 15 May 2024 03:00 p.m.
Eastbound curb lane, south side sidewalk, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Du Couvent Av to De Leglise Av
Expected Duration: 13 May 2024 - 31 Jul 2024
Southbound curb lane, closed for street construction/maintenance.
At Scotland Av
Expected Duration: 09 May 2024 - 28 Jun 2024
Jackson Av to Pembina Hw
Expected Duration: 14 May 2024 - 28 May 2024
Southbound curb lane, west side sidewalk, closed for street construction/maintenance.
At Hamilton Av
Expected Duration: 15 Apr 2024 - 17 Apr 2024
Northbound curb lane, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Livinia Av to Ness Av
Expected Duration: 06 May 2024 - 28 Jun 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, closed for street construction/maintenance.
Hickory Wood Pl to Robson St
Expected Duration: 30 Apr 2024 - 07 Jun 2024
Eastbound curb lane, closed for communications work.
Donald St to Harkness Av
Expected Duration: 25 Sep 2023 - 30 Jun 2024
Back lane/public lane, south side sidewalk, closed for building construction/maintenance.
At Charing Cross Cr
Expected Duration: 29 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Des Meurons St to Egerton Rd
Expected Duration: 14 May 2024 - 16 May 2024
Eastbound median lane, westbound median lane, north side sidewalk, closed for sewer work.
Des Meurons St to Egerton Rd
Expected Duration: 08 May 2024 - 10 May 2024
Eastbound curb lane, closed for sewer work.
Riddle Av to Wolever Av
Expected Duration: 30 Apr 2024 - 20 May 2024
East side sidewalk, closed for water work.
Wolever Av to St Matthews Av
Expected Duration: 05 May 2024 - 31 May 2024
Westbound curb lane, east side sidewalk, closed for water work.
Clearview Dr to High Point Dr
Expected Duration: 02 May 2024 - 20 May 2024
Northbound curb lane, east side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Rothesay St to Donwood Dr
Expected Duration: 06 May 2024 - 27 May 2024
Westbound curb lane, north side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Henderson Hw to Brazier St
Expected Duration: 09 May 2024 - 03 Jun 2024
Eastbound curb lane, south side sidewalk, closed for water work.
Roch St to Watt St
Expected Duration: 10 May 2024 - 27 May 2024
Eastbound curb lane, south side sidewalk, closed for water work.
Dollard Bv to Access Rd
Expected Duration: 01 Jun 2022 - 31 Jul 2024
Southbound curb lane, west side sidewalk, closed for building construction/maintenance.
At Lakewood Bv
Expected Duration: 10 May 2024 - 27 May 2024
Westbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Allan St to Stadacona St
Expected Duration: 13 May 2024 - 03 Jun 2024
Westbound curb lane, north side sidewalk, closed for gas work.
Brazier St to Henderson Hw
Expected Duration: 13 May 2024 - 03 Jun 2024
Westbound curb lane, closed for gas work.
Panet Rd to Clyde Rd
Expected Duration: 03 May 2024 09:00 a.m. - 20 May 2024 03:00 p.m.
Westbound curb lane, north side sidewalk, closed for communications work. Lanes will be open for morning and afternoon rush hours.
Harrow St to Pembina Hw
Expected Duration: 14 May 2024 - 28 May 2024
Eastbound curb lane, closed for street construction/maintenance.
Poseidon By to Wilton St
Expected Duration: 24 Jul 2023 - 30 Jun 2024
Westbound curb lane, westbound median lane, eastbound curb lane, eastbound median lane, closed for sewer work.
Logan Av to Alexander Av
Expected Duration: 25 Mar 2024 - 20 May 2024
Southbound curb lane, west side sidewalk, closed for water work. Lanes will be open for morning and afternoon rush hours.
Pennyhill Gt to Cartesian Gt
Expected Duration: 06 May 2024 - 17 May 2024
Westbound curb lane, north side sidewalk, closed for sewer work.
At Hunterspoint Rd
Expected Duration: 08 May 2024 - 27 May 2024
Southbound curb lane, closed for sewer work.
At Rougeau Av
Expected Duration: 08 May 2024 - 31 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Chudley St to Burrows Av
Expected Duration: 11 May 2024 - 11 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for film production or special event/festival.
Grey St to Chalmers Av E
Expected Duration: 01 May 2024 - 22 May 2024
South side sidewalk, closed for water work.
Chancellor Matheson Rd to Sifton Rd
Expected Duration: 06 May 2024 - 16 May 2024
Northbound curb lane, southbound curb lane, closed for street construction/maintenance.
Wellington Av to Ellice Av
Expected Duration: 14 May 2024 - 15 May 2024
Southbound curb lane, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Salter St to End
Expected Duration: 01 May 2024 - 19 May 2024
Westbound curb lane, closed for sewer work.
Day St to Larche Av E
Expected Duration: 07 May 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for electrical/lighting/signals work. Lanes will be open for morning and afternoon rush hours.
Donald St to Scott St
Expected Duration: 11 Sep 2023 - 26 Jul 2024
Westbound curb lane, north side sidewalk, closed for building construction/maintenance.
Osborne St to Scott St
Expected Duration: 24 Jun 2022 - 01 Jun 2024
North side sidewalk, closed for building construction/maintenance.
Arbuthnot St to Cockburn St N
Expected Duration: 29 Apr 2024 - 17 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for water work.
Pioneer Av to Lombard Av
Expected Duration: 21 May 2024 05:00 p.m. - 21 May 2024 11:00 p.m.
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for film production or special event/festival.
Grosvenor Av to Corydon Av
Expected Duration: 23 Apr 2024 - 12 May 2024
Back lane/public lane, closed for sewer work.
Grosvenor Av to Kingsway
Expected Duration: 09 May 2024 - 27 May 2024
Northbound curb lane, southbound curb lane, east side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Thames Av to Chalmers Av
Expected Duration: 06 Oct 2023 - 30 Nov 2024
East side sidewalk, closed for building construction/maintenance.
Thames Av to Chalmers Av
Expected Duration: 23 Aug 2023 - 29 Nov 2024
Northbound curb lane, east side sidewalk, closed for loading/unloading. Lanes will be open for morning and afternoon rush hours.
Stafford St to Wentworth St
Expected Duration: 07 May 2024 - 09 May 2024
Eastbound curb lane, westbound curb lane, north side sidewalk, closed for sewer work. Lanes will be open for morning and afternoon rush hours.
Rougeau Av to Trudell By
Expected Duration: 08 May 2024 - 31 May 2024
Complete closure of all northbound lanes, complete closure of all southbound lanes, east side sidewalk, west side sidewalk, closed for landscaping/tree maintenance. Lanes will be open for morning and afternoon rush hours.
Dunkirk Dr to Bronstone Bv
Expected Duration: 09 May 2024 - 14 May 2024
Back lane/public lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Chancellor Dr to Blue Lake By
Expected Duration: 04 May 2024 - 27 May 2024
Northbound curb lane, closed for street construction/maintenance.
Wildwood St to South Dr
Expected Duration: 13 May 2024 - 31 Jul 2024
Eastbound curb lane, closed for street construction/maintenance.
At South Dr
Expected Duration: 13 May 2024 - 31 Jul 2024
Northbound curb lane, closed for street construction/maintenance.
At Arlington St
Expected Duration: 16 May 2024 09:00 a.m. - 16 May 2024 03:00 p.m.
Eastbound curb lane, westbound curb lane, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Langford St to Cecil St
Expected Duration: 16 May 2024 - 23 May 2024
Westbound curb lane, north side sidewalk, closed for film production or special event/festival.
Roblin Bv to Charleswood Bridge
Expected Duration: 13 May 2024 - 30 Aug 2024
Southbound curb lane, southbound median lane, northbound curb lane, northbound median lane, southbound left turn storage lane, southbound left turn storage lane 2, northbound right turn (yield) lane, east side sidewalk, west side sidewalk, closed for street construction/maintenance.
Main St to Westbrook St
Expected Duration: 11 May 2024 - 12 May 2024
Eastbound curb lane, eastbound middle lane, eastbound painted bike lane, south side sidewalk, closed for building construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Rose Lake Ct to Cherrywood Rd
Expected Duration: 05 May 2024 - 10 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, closed for film production or special event/festival.
At Scotland Av
Expected Duration: 09 May 2024 - 28 Jun 2024
Rockman St to Daniel St
Expected Duration: 13 May 2024 - 13 May 2024
Westbound curb lane, closed for gas work. Lanes will be open for morning and afternoon rush hours.
Aubrey St to Lenore St
Expected Duration: 07 May 2024 - 27 May 2024
Eastbound curb lane, westbound curb lane, north side sidewalk, closed for street construction/maintenance. Lanes will be open for morning and afternoon rush hours.
Portage Av to Summerlands Bv
Expected Duration: 07 May 2024 - 27 May 2024
Northbound curb lane, closed for sewer work.
Stafford St to Ruskin Rw
Expected Duration: 11 May 2024 - 11 May 2024
Complete closure of all eastbound lanes, complete closure of all westbound lanes, south side sidewalk, north side sidewalk, closed for film production or special event/festival.
Ellice Av to Portage Av
Expected Duration: 08 Dec 2022 - 01 Jun 2024
Northbound median lane, west side sidewalk, closed for building construction/maintenance.
Sargent Av to Ellice Av
Expected Duration: 06 May 2024 - 07 May 2024
Goulet St to Marion St
Expected Duration: 12 May 2024 - 28 Jun 2024
Northbound median lane, closed for street construction/maintenance.