| Bridges Home |
Bridge Maintenance and Inspection |
Interesting Facts About Bridges |
Roadside Safety Improvements |
Winnipeg Structures
Transportation Engineering Division Home |
![]() |
![]() |
A staff of engineers, technologists and field staff
ensure the upkeep and safety of the many structures currently existing in the
City of
Inspections of structures are on-going year round. Constant vigilance is a necessity to ensure up to date knowledge of structure condition.
![]() |
A computer program – “Bridge Manager” -
jointly developed with several agencies across
|
A Records and Information Management (R.I.M.) System stores all structure drawings and records in digital format. Over a period of several years, bridge drawings dating back to the early part of the 20th Century have been digitized and are stored in the R.I.M. System for ease of retrieval and use. All bridge staff have access availability on their desktop/laptop computers.
The Bridge Operations Branch “field crew” is an invaluable asset for responding to and addressing minor problems which may develop on structures and which need to be corrected immediately. They are also instrumental in the maintenance of Roadside Safety devices.

UB-50 Underbridge Crane
Last update:
03.09.2008
![]()
* Top of Page







