Parks Planning - SCD (Standard Construction Details) Drawings
These Standard Construction Details are often referenced in Construction Bid Opportunities. Included are the listings of Approved Products.
100-Park Equipment
- SCD-105A Post and Chain Fencing
- SCD-105B Post Bollard
- SCD-105C Removable Steel Bollard
- SCD-105D Trail Bollard
- SCD-106 Waste Receptacle Expanded Metal Basket
- SCD-119 Waste Receptacle Metal Slat Type
- SCD-120 Tache Bench
- SCD-120A Tache Bench Wood with Arms
- SCD-120B Tache Backless Bench Wood
- SCD-121 Tache Bench Composite
- SCD-121A Tache Bench Composite with arms
- SCD-121B Tache Backless Bench Composite
- SCD-121C Tache Backless Bench Composite with arms
- SCD-122 Tache Style Metal Frame Picnic Table
- SCD-122A Tache Style Wheelchair Metal Frame Picnic Table
- SCD-136A Accessible Bench Node & Picnic Table Layout
- SCD-152B Chain Link Fence with PT Posts
- SCD-153 English Park Sign with Address
- SCD-154 Bilingual Park Sign with Address
200 - Playground and Fitness Equipment
300 - Sports Facilities
- Under Construction
400 - Irrigation
- Under Construction
500 - Landscape Development
- SCD-501 Preparation of Planting Area
- SCD-515 Coniferous Tree Planting Parks
- SCD-516 Deciduous Tree Planting Tree Well
- SCD-517 Standard Detail for Tree Planting
- SCD-518 Special Detail for Tree Planting with Tree Spade Excavated Pit
- SCD-519 Special Detail for Tree Planting in Restricted Sites
600 - Typical Construction Details
- SCD-612 Culvert Installation Under Walkway
- SCD-629 Light Proof Barrier Fence
- SCD-633 Chain Link Fence Entrance Baffle Detail
- SCD-643 Concrete Playsurface Edging Detail
- SCD-645 Park Path Crushed Limestone
- SCD-646 Parkway Path Crushed Limestone
- SCD-647 Park Path Asphalt
- SCD-648 Parkway Path Asphalt
- SCD-649 Wood Mulch Pathway
- SCD-650 Engineered Wood Fibre Safety Surfacing Drainage Diagram
- SCD-651 Single Timber Edging With Cap
- SCD-651A Double Timber Edging with Cap
- SCD-651B Timber Edging Detail to Fence
- SCD-652 Park Light Base
- SCD-656 Accessible Playground Ramp
- SCD-659 Multi Flow Drainage
This does not represent a comprehensive set of SCD's. If you have questions about products or processes please contact the Project Management Coordinator - 204-986-4171
This list and these details may be updated or superceeded at any time. Please check the web regularly for additions and to ensure you are using the latest version of a detail.
Last update:
February 8, 2012
![]()
* Top of Page



