311
Anticipated Response Times

Open-Air Fire Burning Complaint
Hoarding/Pack Rat Complaint
Fire Code Complaint
Paid Inspection Request Form
Request for Lockbox Form
Request for Permit Form
Billing Inquiries

Open-Air Fire Burning Complaint

Follow-up2 days
Sign off7 days

Comment:
Most open burning complaints dealing with fire pits are often dealt with and resolved within 2 days. There are however open burning activities other than fire pits which often take longer to resolve. The compliance time is also often dependant on the Branch’s success in locating a building owner or responsible party.

Hoarding/Pack Rat Complaint

Follow-up2 days
Sign off6 to 12 months

Comment:
Comment: Hoarding is a very difficult issue to deal with. If it occurs in a rental property, the Branch has ability to target the property owner/landlord who in turn can utilize provisions under the Residential Tenancies Act to evict a tenant. If however, we are dealing with an owner occupied home we must balance the fire safety risk with the personal rights of an individual (under the Country’s Charter). The process often involves obtaining assistance from relatives, social agencies, and other City departments such as Health. In other words, every effort is made to work with a person who is hoarding to resolve the situation. This takes months. If a situation ends up going to Court, it could take an additional year or more.

Fire Code Complaint

Follow-up2 days
Sign off1 day to 6 months

Comment:
There are a wide array of fire code complaints. The following are some of the more common ones which have been broken down.

Inoperable Fire Alarm System
Follow-up1 day
Sign off1 day
  
Inoperable Smoke Alarms
Follow-up2 days
Sign off2 days
 
Impeded Means of Egress
Follow-up1 days
Sign off1 days
 
Service/Repair fire extinguishers/exit signs/exit doors, removal of combustables
Follow-up2 days
Sign off21 days
 
Storage of flammables/combustables, propane, hazardous goods
Follow-up2 days
Sign off2 days to 6 months
 
Fire Safety Plans
Follow-up7 days
Sign off6 months
 
Vacant Building Complaints
Follow-up2 days
Sign off14 days

Paid Inspection Request Form

Follow-up1 days
Sign off1 days
PDF Release for Inspection Form

Request for Lockbox Form

Follow-up1 days
Sign off1 days
PDF Lock Box Request Form

Request for Permit Form

Follow-up1 days
Sign off1 days
 

Billing Inquiries

Follow-up1 days
Sign off1 days
See the Billing section of our site


Last update: 12.07.2010
Top of Page